Railperf
Established Member
- Joined
- 30 Oct 2017
- Messages
- 3,683
How is the program to fit WSP going? In the latest edition of Modern Railways, Ian Walmsley reports that an HST he was travelling on to Inverness came to a stand three time on the climb to Dromochter summit due to wheel slip - despite being fitted with a new westinghouse WSP system. It is reported the system was very dififcult to set up. And he noted these trains don't have sanders either - due to lineside vegetation being so close to the train and dropping leaves on to the line. The result a 91 minute delay! Apparently the low adhesion causes a 'seized' warning, which ended up limiting the train to 40mph!
That's disappointing news!!
That's disappointing news!!