How is it possible that they have only just noticed that the toilets aren’t working on the day they are supposed to enter service three years late?
These things happen. It can often be something a software update has caused.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,692
Location
Derby
How is it possible that they have only just noticed that the toilets aren’t working on the day they are supposed to enter service three years late?
You don't know whether they were working perfectly until last week or not. Bearing in mind they aren't supposed to enter service yet, the official launch is in December
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
Another possible reason could be the recent very cold weather and sub-zero nighttime temperature. For example if left shutdown the Stadler fleet will automatically dump the toilet tank to reduce the risk of damage.
 

AndrewJM70

Member
Joined
16 Jan 2023
Messages
95
Location
Leicester
So they have been testing successfully for months, and now on the eve of service all the toilets simultaneously pack up? Respectfully, I don’t buy it.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,361
Location
belfast
Another possible reason could be the recent very cold weather and sub-zero nighttime temperature. For example if left shutdown the Stadler fleet will automatically dump the toilet tank to reduce the risk of damage.
I'm assuming this is the "fresh" water for the flush, not foul water retention tank?

Regardless, a sensible thing to do, even if it means toilets may be out of use
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
I'm assuming this is the "fresh" water for the flush, not foul water retention tank?

Regardless, a sensible thing to do, even if it means toilets may be out of use
Yes it’s the fresh water. I’ve had 745s where unfortunatley all toilets have done this. Often happened after weekend overhead isolations.
 

Railperf

Established Member
Joined
30 Oct 2017
Messages
3,683
Last edited:

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton
Good that that's been found though. Onwards and downwards, I mean upwards.
This is exactly why there are testing periods. Another problem successfully identified, traced and now a solution can be designed and implemented (in this case, one hopes a fairly simple software tweak).
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
"More info on the class 810s. Initial thoughts were that it was two + flushes causing the failures, but after further testing it transpires that if a door is locked before the 'Please lock the door' message has finished, the software detects a fault and locks person in the lav!"
Wow, what a critical discovery before entry into service! Good job too - we don’t want the trapped person to be down in the dumps.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,732
Location
Worcester
Wow, what a critical discovery before entry into service! Good job too - we don’t want the trapped person to be down in the dumps.
Please don’t start the endless chain of toilet puns again, because once it starts it never ends.

== Doublepost prevention - post automatically merged: ==

oh my god I’ve done it myself without realising.
 

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,697
Location
Leeds
"More info on the class 810s. Initial thoughts were that it was two + flushes causing the failures, but after further testing it transpires that if a door is locked before the 'Please lock the door' message has finished, the software detects a fault and locks person in the lav!"

I'd like to think that there was some bog-standard software logic solution here...

Oh, for the days of simple bots and latches, instead of trains being delayed into service because you can't unlock the toilet from the inside. I think the usual problem is that they can be accidentally locked closed (and thus out of use) from the outside
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,382
I'd like to think that there was some bog-standard software logic solution here...
Now now, it's no use blaming the cistern.

I noticed 810006 had a test run cut short on Monday 24/11, and then did a short-notice test Wednesday (27/11).

This made me think that perhaps the locking in occurred on Monday's test, and perhaps a fix was tested yesterday. If so, I pity the poor technicians that presumably were locking, flushing and unlocking all the way to Leicester and back...

Anyway, fingers crossed, as EMR appear to be sending out 23 out of 24 Cl222 on most weekdays at the moment, and I doubt that can be sustained for long.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,885
Thank God for that. Tedious wasn’t a strong enough word.
Amen! I stopped reading the thread the other day when they started and only just dipped back in to see if they stopped, so I certainly wouldn't have been providing any gen if I had it (which I currently, alas, do not!). Nothing makes me cringe more, see also inevitable banal nonsense when trains hit cows.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,792
Location
East Anglia
Amen! I stopped reading the thread the other day when they started and only just dipped back in to see if they stopped, so I certainly wouldn't have been providing any gen if I had it (which I currently, alas, do not!). Nothing makes me cringe more, see also inevitable banal nonsense when trains hit cows.
OMG you’ve just taken the words out of my mouth with that last bovine comment. The only other one that always comes close to sending me into oblivion is ‘can’t park there mate’ <D
 

QSK19

Member
Joined
29 Dec 2020
Messages
1,143
Location
Leicestershire
Hopefully, the fact we’re practically in December means that minds will be focussed on getting the gremlins sorted. At least if they get a single diagram up and running, it’ll be a good achievement.

== Doublepost prevention - post automatically merged: ==

Thank God for that. Tedious wasn’t a strong enough word.
To be honest, I think that is a little harsh. I introduced the humour to make light of a difficult situation - got to introduce a little in order to carry us through. So is my way of thinking anyway.

== Doublepost prevention - post automatically merged: ==

Thank you, I wasn't far off headbutting my monitor.
Thank you :D
Noted that humour isn’t really welcome. Apologies that, for some, it had the opposite effect.

I appreciate that it’s a serious thread, but I did try to strike a medium between that and trying to bring a laugh to people.
 
Last edited:

tram21

Established Member
Joined
29 Dec 2022
Messages
1,307
Location
Nottingham
To be honest, I think that is a little harsh. I introduced the humour to make light of a difficult situation - got to introduce a little humour into things to carry us through.

== Doublepost prevention - post automatically merged: 14 minutes ago ==

Noted that humour isn’t really welcome. Apologies that, for some, it had the opposite effect.

I appreciate that it’s a serious thread, but I did try to strike a medium between that and trying to bring a laugh to people.
Don't worry I, and I'm sure lots of others who contributed to, appreciated the humour! ;) :D
 

WesternLancer

Veteran Member
Joined
12 Apr 2019
Messages
14,953
Hopefully, the fact we’re practically in December means that minds will be focussed on getting the gremlins sorted. At least if they get a single diagram up and running, it’ll be a good achievement.

== Doublepost prevention - post automatically merged: ==


To be honest, I think that is a little harsh. I introduced the humour to make light of a difficult situation - got to introduce a little humour into things to carry us through. So is my way of thinking anyway.

== Doublepost prevention - post automatically merged: ==



Noted that humour isn’t really welcome. Apologies that, for some, it had the opposite effect.

I appreciate that it’s a serious thread, but I did try to strike a medium between that and trying to bring a laugh to people.
I’d be making comparisons with 2 LAV units if it wasn’t off topic
 