GraphitProjekt
Member
What do you mean by droppers?
Okay, thanks. I was that way a couple of times last week but not in good daylight so must've missed them.Unfortunately not all of the masts are up. There is one double to have droppers added, two portals to be fully assembled and another to have droppers added, and one double to be put up closer to Lennymuir, all at the airport section.
They look like anchor points for the bracing members. There's usually a big hook on the top of them.Unfortunately not all of the masts are up. There is one double to have droppers added, two portals to be fully assembled and another to have droppers added, and one double to be put up closer to Lennymuir, all at the airport section. Then there's the two random piles between Saughton Junction and Ladywell Avenue which still need to be put up. Not sure what the case is with them though, here's a screenshot of them with some weird material around them, looks like slabs. Any ideas as to what's going on?
View attachment 192422
I suspect they mean the registration arms. Droppers are the wires linking the catenary wire with the contact wire.What do you mean by droppers?
The set of arms where the wires hang from.What do you mean by droppers?
Ah, my apologies, that it was I was meaning. Thanks for the correction.I suspect they mean the registration arms. Droppers are the wires linking the catenary wire with the contact wire.
I have a video of the line between Dalmeny station and Haymarket West, which I will upload and link here once it’s online. I tried to get the best angle possible, though there was still some glare. I will report back with a link when it’s done.Okay, thanks. I was that way a couple of times last week but not in good daylight so must've missed them.
yeah, I was going to say haha!I suspect they mean the registration arms. Droppers are the wires linking the catenary wire with the contact wire.
I have also seen this kind of thing called "small parts steel" or "SPS".The set of arms where the wires hang from.
== Doublepost prevention - post automatically merged: ==
Ah, my apologies, that it was I was meaning. Thanks for the correction.
I could be wrong, but I'm pretty sure that's another portal been put up on the airport section of line.Had a chance to have a look at progress today, it looks like the installation of masts is now complete as there's no obvious gaps.
Just bridge works to be done now - the bridge at South Gyle has the new deck in place ahead of the old bridge being removed from around it.

Nope, you're right.I could be wrong, but I'm pretty sure that's another portal been put up on the airport section of line.
(Towards the very left of the image)
View attachment 194640
In the first image, you've got in the foreground an empty cantilever arm, with a up-facing triagular bracket to take the catenary wire, but no catenary wire and no pull off arm, registration arm or contact wire fitted.Does anyone have any idea what’s going on here?


Looks like a Permanently Earthed Section (PES) to me, albeit a temporary PES. Might be to make sure there's no stray currents while they finish the job.In the first image, you've got in the foreground an empty cantilever arm, with a up-facing triagular bracket to take the catenary wire, but no catenary wire and no pull off arm, registration arm or contact wire fitted.
View attachment 195231
In the background, there is wiring between catenary wire and the contact wire over another parallel track.
The equivalent can be see at 0m50s to 0m52s on the youtube video in post #941.
View attachment 195232
From the connections, I think it may be a temporary earthing wire, but I don't know enough about OHLE installation procedures to be sure.
[EDIT: Image from A GUIDE TO OVERHEAD ELECTRIFICATION: OCTOBER 2021, by Alan Baxter]
Is that to protect against power being induced in the wire by proximity to live wires on adjacent tracks?Looks like a Permanently Earthed Section (PES) to me, albeit a temporary PES. Might be to make sure there's no stray currents while they finish the job.
Very probably. Also saves having to keep track of the temporary blue earths.Is that to protect against power being induced in the wire by proximity to live wires on adjacent tracks?
There definitely was a decent amount of prep work. From what I could tell, they’ve fully wired all of the junctions at Haymarket Central and Haymarket West junctions. Since they would have to close the E-G line to finish wiring those section during our closure.That sounds like a fair amount of work in a short period of time. Mind you, he did say in the video that there has been preparatory work ongoing over the festive period.
Wow that is great news.Starting tommorow as far as I can tell. Rather excited
How do you mean?The 1B16 Caledonian Sleeper service has left the Dalmeny section, and thus concludes the unelectrified nature of the Haymarket - Dalmeny line.
The line closure has now officially begun. See yous all in 9 days on the other (electrified) side.
That would have been the last sleeper to pass through Dalmeny before the overhead wires are put in place during the 9 day closure....I thinkHow do you mean?
Likewise I took it to mean that the southbound sleeper was the last public service through that area and that afterwards the lines were blocked/shut.That would have been the last sleeper to pass through Dalmeny before the overhead wires are put in place during the 9 day closure....I think