HSTEd
Veteran Member
- Joined
- 14 Jul 2011
- Messages
- 20,389
If they just filled the tunnel with foam concrete the required ongoing maintenance would probably be a small fraction of what is required at the moment.Absolutely. I keep forgetting , abandoned infrastructure still needs maintenance.
Oops, noticed people upthread beat me to it!
There isn't much freight potential for Sellafield beyond about 2030 anyway. AGR operations are rapidly winding down and that will be more or less the end of flask traffic.
Would operating the line as two stubs, without the tunnel, for the long term really degrade the passenger experience?
Obviously you'd probably need a timetable recast if its permanent, but that could be done.