• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Emergency toilet power/gravity feeding

Status
Not open for further replies.

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,893
Location
Land of the Prince Bishops
One thing I've noticed in quite a few RAIB reports is that for whatever safety related reason the power has to be shut off (or has failed) and then the passengers are are without toilets for several hours. For example at East Langton where due to a hole in the fuel tank in the Meridian they had to turn all the engines off while having no evacuation happening any time soon.

This seems eminently solvable to me and at little cost (in purpose designed stock where this is thought about in advance) - either by a gravity fed system which would be fine to eliminate onto track imo in these circumstances as would providing a hand pump - or if it has to be electrically powered a backup dedicated battery supply.

Back in the day of course, mk1s just had a roof fed simple system and we had this by default, so it's crazy that we've lost it over time without much of a fuss being made.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
An emergency mode for toilets is vital. Many people have a very real need for a toilet they can use NOW.
How a train with no working toilet passes disability regs i really dont know.

The train offering is way worse than car where i can stop at a public loo or even use a hedge.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,681
Location
Hope Valley
The traditional gravity model relied on using a lot more water than the modern ‘vacuum’ style. A material issue for tank size and weight, which has been ruthlessly designed down in current builds.
 

Egg Centric

Established Member
Joined
6 Oct 2018
Messages
2,893
Location
Land of the Prince Bishops
The traditional gravity model relied on using a lot more water than the modern ‘vacuum’ style. A material issue for tank size and weight, which has been ruthlessly designed down in current builds.

That might be a reason making it hard to fix retrospectively, but I don't see why it need be an issue in future trains. Given the amount of design sacrifice in having disabled toilets in the first place, this would be piddling (hehe)
 
Status
Not open for further replies.

Top