• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

When did third rail change from 630/650V to 750V?

Status
Not open for further replies.

frankmoh

On Moderation
Joined
7 May 2025
Messages
825
Location
London
Question in title. Both the Southern and London Midland Region started off with 630V or 650V DC before using 750V DC.

As I understand it, the two regions changed voltages at different times, as the Watford DC line was still using 650V in 1986 compared to the Southern region or the Merseyrail network.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,297
The last mainline areas to change up to 750V were only complete in the last decade or so; during NR Control Period 5, (CP5). Some Waterloo inner routes were still only set to 660V around 2014, but there was a significant project underway to allow regeneration, and raise the permitted voltage generally in the area by around 2016/17. One of the issues was the areas feeding LU C and D stock, which couldn’t accept 750V, and some of the work was deferred until the S stock was fully introduced.

i suspect if there was a detailed analysis you’d have gradual dates for route sections covering 40 or 50 years or more.
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
The Southern didn't all change at once. The Kent Coast (1959-1962) and Bournemouth schemes (1967) were 750V from the start, and a lot of the rest had to wait for the withdrawal of the SUBs. I also gather the District at Richmond & Wimbledon held things back.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,181
Location
West Wiltshire
I think upto about 1931 it was 660v or less and the dc was converted in those huge brick substations with rotary converters that were manned.

From the Brighton scheme onwards (installed 1932) unmanned substations were installed with a central control room.

The closure of Durnsford Road Power station, Wimbledon, and conversion to area being fed from National grid some more changes. But many of the old substations started to get upgraded by 1970s.

From memory the old Southern Railway trains from 1930s couldn't operate on 750v sections (except under special working when empty to Eastleigh works) as wiring wasn't designed for regular use at the higher voltage. Once trains like 4COR had gone (1972?) substation upgrades started.

I have a feeling the 4SUBs were also voltage restricted so the western and central suburban area didn't really get voltage increases until these had gone in early 1980s.

The exact order the old brick substations got replaced wasn't in a line by line order, some were due to other things eg Kingston substation was in way of a road widening scheme.

Mid 1980s to 1990 saw rush of infill electrification schemes (Hastings line, Weymouth, Solent etc), many with feeders at lower voltages so although at 750v nominal, are limited in amps.

The early 1990s saw electrification upgrades on the Channel tunnel routes, including via Redhill. These converted any remaining sections still at lower voltages.

By early 2000s it was generally increasing the power as the new electrostar and desiro fleets were lot more powerful. This work was never finished systemwide and to this day they have software capping the power drawn.

Some work on power upgrades were done at few SW London areas as part of 10car suburban scheme mid 2010s

Work then continued with last bits getting voltage upgrades being those shared with District line trains about decade ago.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,416
Location
S Yorks, usually
...The Kent Coast (1959-1962) and Bournemouth schemes (1967) were 750V from the start, and a lot of the rest had to wait for the withdrawal of the SUBs...
Notably, a railtour with a 4-SUB around Kent to an Ashford open day in the early 1980s had to have the lighting fuses removed for the Kent Coast section because of the higher voltage. The Mary-Go-Round, see https://sixbellsjunction.co.uk/80s/820814se.htm .

...the suburban area was still energised at nominal 660V and 4-SUBs were not allowed on 750V lines with the heating and lighting fuses in place. It being August, the heating fuses had been removed at Selhurst, but the tour went through several tunnels in the London area so lighting had to be operative there. It was agreed that the tour could pass through the short tunnels east of Maidstone East in darkness, but routing via Tonbridge would not have been possible, as that would have meant going through Sevenoaks tunnel with no lights.
There may have been others, but I was on that one!
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
Notably, a railtour with a 4-SUB around Kent to an Ashford open day in the early 1980s had to have the lighting fuses removed for the Kent Coast section because of the higher voltage.
I think there was a directive that the fuses had to be removed or replaced by a member of CM&EE staff. I read about a tour where SUB 4732 was hauled by Sarah Siddons and the Underground bloke was startled by the overvoltage trips popping out on the SWD. They just reset them and she was fine.
 
Joined
28 Oct 2017
Messages
252
Every generation of third rail stock seems to have both higher minimum required voltage and higher maximum limits than what it replaces.

On Merseyrail, the uplift to nominal 750V could not happen until the 502 and 503 units were replaced by 507/508 sets. When some of the 508 sets found their way back down south, regenerative breaking had to be disabled on other fleets using the same routes, because voltage rises were causing damage to 508 units.

Then before the introduction of the 777 fleet on Merseyrail could happen, new substations were required to raise the minimum line voltage (which was as low as 400V in places!) to allow the new fleet to operate. This included sections which had been electrified in the 1990s on a shoestring, as well as older sections.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
825
Location
London
The exact order the old brick substations got replaced wasn't in a line by line order, some were due to other things eg Kingston substation was in way of a road widening scheme.
A few of these substations are still about in my local area. Are they still running or are they obsolete and just too hazardous to demolish?
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
I believe post-1951 Southern Region EMUs (EPBs, CEPs, etc) had a low-voltage cutout that tripped if the line voltage fell below 480V.
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,779
Location
St Albans
I think upto about 1931 it was 660v or less and the dc was converted in those huge brick substations with rotary converters that were manned.

From the Brighton scheme onwards (installed 1932) unmanned substations were installed with a central control room.....
It was the late 1920s that mercury arc rectifiers started replacing the rotary converters; this assisted the installation of remote control of substations from a central point.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,110
Location
West Yorkshire/Tuscany
Do I have a vague recollection that, at some stage in the early days of the Bournemouth electrification, Sturt Lane Junction to Bournemouth West depot was energised at 850 V?
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,308
Do I have a vague recollection that, at some stage in the early days of the Bournemouth electrification, Sturt Lane Junction to Bournemouth West depot was energised at 850 V?
We've had discussions here about this in the past. It was certainly stated in a Modern Railways article on the 1967 electrification as such, and it was likewise denied on here by multiple members who had been engineers on the scheme. Seems it was either a typo, or someone had misunderstood some overvoltage figure as being the nominal one. The article described the special measures needed now SUB units could run themselves to Eastleigh for overhaul, which are those mentioned above.

And nominal it is, the voltage at the train goes up and down dependent on various aspects. I recall a Wirral driver on the old 503s showing me (don't ask ...) how putting the power on or off when passing the 1938 era Bidston substation at night would cause the internal lights, presumably run off the DC, to go dim or bright, depending on the current draw. When the 3rd rail was extended from Stratford to North Woolwich in the 1980s (now gone) I believe there was no substation, it was all just down the conductor rail from Stratford, and lights in the 2-EPB stock that started the service, never bright at the best of times, progressively dimmed as one approached the terminus, and indeed the reason the line was singled beyond Custom House at the same time was to prevent two electric trains being there together.

On the Southern the 1959-62 Kent Coast scheme at 750V must have extended into the suburban area as SUB and HAL units were completely cleared out and banned from that Division thereafter.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,181
Location
West Wiltshire
On the Southern the 1959-62 Kent Coast scheme at 750V must have extended into the suburban area as SUB and HAL units were completely cleared out and banned from that Division thereafter.
The line was quadrupled in St Mary Cray area, and new less tightly curved spurs built near Petts Wood. This increased power requirements so new substations. But suburban trains worked as far as Sevenoaks.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
3,416
Location
S Yorks, usually
On the Southern the 1959-62 Kent Coast scheme at 750V must have extended into the suburban area as SUB and HAL units were completely cleared out and banned from that Division thereafter.
Or would that have been primarily for stock compatibility? i.e. allowing the suburban stock (now exclusively EPBs) to multiple with the HAPs and CEPs.
See also the earlier comments on SUB railtours into East Kent
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,308
Or would that have been primarily for stock compatibility? i.e. allowing the suburban stock (now exclusively EPBs) to multiple with the HAPs and CEPs.
See also the earlier comments on SUB railtours into East Kent
I suspect the SUB trip was done in summer, as I believe the fuses on the heaters had to be taken out when sent to 750V areas.

I think there was a directive that the fuses had to be removed or replaced by a member of CM&EE staff. I read about a tour where SUB 4732 was hauled by Sarah Siddons and the Underground bloke was startled by the overvoltage trips popping out on the SWD. They just reset them and she was fine

I think that was an overall directive about working on line voltage items. When lighting was in series at line voltage I believe it needed a CMEE fitter to change a light bulb. Having actually once broken a light bulb in an old CEP by swinging a case up onto the luggage rack too zealously, it was only long afterwards that I read up on just what would have had to be done that night at the depot to get the broken stump out ... :(
 
Last edited:

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,308
Lighting as well according to that railtour writeup quoted earlier.
I did hesitate to put that in, as they would presumably have had to run on a route without tunnels, and I couldn't think of a way to do that across Kent.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,297
Do I have a vague recollection that, at some stage in the early days of the Bournemouth electrification, Sturt Lane Junction to Bournemouth West depot was energised at 850 V?
No. That‘s a myth that has been previously demolished, apparently it was the open circuit output of the rectifiers. One of the rail magazines used it in error, IIRC.
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
No. That‘s a myth that has been previously demolished, apparently it was the open circuit output of the rectifiers. One of the rail magazines used it in error, IIRC.
For timing purposes, I think 675 volts was assumed. That 850V thing just won't go away! I saw it demolished by Richard Catlow on the uk.railway Usenet group over 20 years ago, and it was demolished in books over 50 years ago.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,297
For timing purposes, I think 675 volts was assumed. That 850V thing just won't go away! I saw it demolished by Richard Catlow on the uk.railway Usenet group over 20 years ago, and it was demolished in books over 50 years ago.
I think I saw that, back then Richard Catlow definitely seemed to be a respected name in uk.railway for electrification questions…
 

Tester

Established Member
Joined
5 Jul 2020
Messages
1,719
Location
Watford
Courtesy of a friend from a long time ago.....

Late at night between Worting and Eastleigh, it was not unusual to have 1000 volts on the live rail - and 100mph was doable.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,692
Location
Nottingham
The voltage will also be higher near a train that is using regenerative braking. If it reaches a certain limit then the train must assume the supply is not "receptive" and divert the current into on-board resistors or even revert to friction braking. Having the nominal voltage too close to this limit reduces the ability of trains to regenerate and therefore the amount of energy saved.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,244
Location
UK
From a unit diagramming perspective, mid 70's on, there were 'instructions' in place on the SW that SUB's in passenger service were not permitted West of Pirbright Junction on the main line. I have a very poor image I took of a late afternoon service, either Oct or Nov '76, showing an 8 SUB on the DFL at Woking station, although the headcode box is a blank white, so no idea what service it was!
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
825
Location
London
From a unit diagramming perspective, mid 70's on, there were 'instructions' in place on the SW that SUB's in passenger service were not permitted West of Pirbright Junction on the main line. I have a very poor image I took of a late afternoon service, either Oct or Nov '76, showing an 8 SUB on the DFL at Woking station, although the headcode box is a blank white, so no idea what service it was!
So they could only go as far as Alton?
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
From a unit diagramming perspective, mid 70's on, there were 'instructions' in place on the SW that SUB's in passenger service were not permitted West of Pirbright Junction on the main line. I have a very poor image I took of a late afternoon service, either Oct or Nov '76, showing an 8 SUB on the DFL at Woking station, although the headcode box is a blank white, so no idea what service it was!
I believe it was not unknown for SUBs to go to Eastleigh with the heating & lighting circuits isolated (I don't know if the headcode box lights were affected).
 

ls2270

Established Member
Joined
24 Oct 2012
Messages
5,518
Location
Basingstoke
I believe it was not unknown for SUBs to go to Eastleigh with the heating & lighting circuits isolated (I don't know if the headcode box lights were affected).
Most SUBs had stencils at the front and a red oil tail lamp rather than illuminated headcode blinds like later Southern Region stock.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,308
The pre-EPB electric units on the Southern, SUBs et al, were notably basic electrically, they had no low voltage electric circuits, everything was traction voltage or nothing. Oil tail lamp on the back. Green flag or lamp at every stop (I recall getting out of a SUB at Earlsfield in 1983 and being amazed at this - on the Wirral electrics they had starting bells from 1938). I think the driving position was standing up. At each stop look back for the flag, if platform on the right then walk across to start. Must have been a nightmare for last-second runners. The stencil box had numbers 0 to 9, so for the 2-digit numbers you could not have double digit, 22 or 33, etc. These got used up on demu routes, which had roller blinds for each character.
 

frankmoh

On Moderation
Joined
7 May 2025
Messages
825
Location
London
The pre-EPB electric units on the Southern, SUBs et al, were notably basic electrically, they had no low voltage electric circuits, everything was traction voltage or nothing. Oil tail lamp on the back. Green flag or lamp at every stop (I recall getting out of a SUB at Earlsfield in 1983 and being amazed at this - on the Wirral electrics they had starting bells from 1938). I think the driving position was standing up. At each stop look back for the flag, if platform on the right then walk across to start. Must have been a nightmare for last-second runners. The stencil box had numbers 0 to 9, so for the 2-digit numbers you could not have double digit, 22 or 33, etc. These got used up on demu routes, which had roller blinds for each character.
And to think the APT or PEP stock was about at the same time!

Speaking of the PEPs, wasn't the subpar electrification on the South Coast the reason for the 313s being used instead of the 377s?
 

contrex

Established Member
Joined
19 May 2009
Messages
1,674
Location
St Werburghs, Bristol
Most SUBs had stencils at the front and a red oil tail lamp rather than illuminated headcode blinds like later Southern Region stock.
The stencils were mounted on a frame over a white opal glass fronted box, and inside that box were a number of light bulbs. These illuminated the stencil so that the digits were visible at night or in dull weather.

1763238737654.png
 
Last edited:
Status
Not open for further replies.

Top