Yes, I saw him finishing it off with his float / trowel just before 1100!The concreting at Butetown is continuing and this morning the workforce were laying a concrete slab right up to the edge of the pavement on Lloyd George Avenue.
Anything else you might like to share would be appreciated, given that the article is behind a paywall.Some interesting titbits in this article includes news that construction of Crwys Road station will start in July 2027
Anything else you might like to share would be appreciated, given that the article is behind a paywall.
Crwys Road:"Market engagement in December 2025, bring out tender in early 2026, award in May 2026. Start construction February 2027."
Heath High Level:"Expected to have 900,000 passengers by 2029 and bring in £1.2 million of revenue. Bring out tender in January 2026, award in June 2026. Construction start July 2027."
"Heath High Level station enhancements including a new road bridge, platform repairs and better access. Bring out tender in March 2026, award in May 2026. Start construction September 2027."
Must have been taken earlier in the year during a possession as there's some track missing where it was being slewed to the new platform 2 at Cardiff Bay.Google maps satellite view has updated across South Wales with 3D (Globe View). Very good if you fancy a snoop around. Cardiff Bays new platform is visible along with half of Butetown Station.
Seems so, a lot of Rhymni line OLE is missing.Must have been taken earlier in the year during a possession as there's some tack missing where it was being slewed to the new platform 2 at Cardiff Bay.




Sure the Germans would be (less than) happy to offer you Stuttgart 21 (the key’s in the name) - still not completed, albeit slightly larger scale.I'm sure it's by design, but this is the slowest rail construction project that's ever taken place surely? Almost 3 years to get to this still not finished stage![]()
It really is slow. The slow progress of the 398s has pushed the Bay line off the project’s critical path, so there’s no hurry to finish it.I'm sure it's by design, but this is the slowest rail construction project that's ever taken place surely? Almost 3 years to get to this still not finished stage![]()
And I'm sure that the people of Boston would also be happy to offer you the "Big Dig" project to change the Interstate system in the city. Planning began in 1982 and construction was carried out between 1991 and 2006; the project concluded in December 2007. I was there in 1997, and spotted this poster: "Rome wasn't built in a day; if it had been, we'd have engaged their contractors".Sure the Germans would be (less than) happy to offer you Stuttgart 21 (the key’s in the name) - still not completed, albeit slightly larger scale.
Seriously off topic but I will offer Itakpe to Aladji (Warri Port) in Nigeria. Also known as SGR Uzanu Railway (Central Line).And I'm sure that the people of Boston would also be happy to offer you the "Big Dig" project to change the Interstate system in the city. Planning began in 1982 and construction was carried out between 1991 and 2006; the project concluded in December 2007. I was there in 1997, and spotted this poster: "Rome wasn't built in a day; if it had been, we'd have engaged their contractors".
They were having a competition with Brandenburg Airport.Sure the Germans would be (less than) happy to offer you Stuttgart 21 (the key’s in the name) - still not completed, albeit slightly larger scale.
In Spring 2026, enabling highway and public realm works will commence, while the start of construction of the tram track and associated platforms at Cardiff Central station will take place in late 2026. Completion of all infrastructure works will follow, with the asset becoming operational by mid-2028, fuelled by the involvement of Cardiff’s Principality Stadium in the Euro 2028 football championships.
"Rio has been working closely with Cardiff Council and numerous stakeholders, including Live Nation, Robertson, and the local community, to develop a cohesive scheme that responds to their ongoing visions and aspirations.
It’s envisioned that a new transport hub will connect the metro line between the Bay, the city and new St Mellon’s Parkway Station, as well as superb pedestrian and transport mode links, including buses, cars, cycles and scooters".
swalesmetroprof.blog
The circa £1Bn plus of capital investment, mainly by WG (I estimate circa £150~200m each from UK Gov and European funding) makes the case for properly and fully devolving rail. There is no doubt in my mind that this project would not be happening without the existence of a Welsh Government and Senedd. The UK Government had no interest in such, often seeing Wales as a peripheral distraction from more important and bigger shiny projects in England.
Starker still, as rail is not devolved, the WG funding for the Metro has to come out of a block grant that has no provision for such expenditure, and so has to come from funds intended for devolved areas like health and education. When you add this often-unnoticed feature to the long-term UK Gov underspend, one has to ask why Westminster/Whitehall has allowed this funding double whammy to persist. Surely, the advent of GBR would see this constitutional and funding anomaly addressed?
All traffic management outside the station has been removed, and starting on Sunday 14 December, trains will serve Ynyswen station in both directions. Passengers heading towards Cardiff should use platform 1 (the original platform), while those traveling towards Treherbert should use platform 2 (the new platform)
I live outside the area. Is it possible to summarise what the benefits are so far from a passenger perspective, particularly speed and frequency (as most passengers won’t know/care how trains are powered)?Yes - the Metro is not complete yet and not perfect - but it is a huge step change and improvement to what we had before.
They're not doing too well on that so far. Passengers between Brecon and Cardiff use to be able to get the T4 all the way. Since TfW's latest changes they've had to change to the X4 at Merthyr bus station or walk to the railway station as the T4 doesn't go there. I don't think there are any through fares either.Also TfW have plans to bring in bus franchising, so it's likely that local bus services will be set up to feed the train in the near future (especially as fare integration will make that easier).
The formal franchising powers haven't come in yet, so it's all a hodgepodge right now.They're not doing too well on that so far. Passengers between Brecon and Cardiff use to be able to get the T4 all the way. Since TfW's latest changes they've had to change to the X4 at Merthyr bus station or walk to the railway station as the T4 doesn't go there. I don't think there are any through fares either.
Well, they manage to offer through fares on the T1 and have it call at Carmarthen railway station (Aberystwyth bus and railway stations at the other end are adjacent).The formal franchising powers haven't come in yet, so it's all a hodgepodge right now.
The trains are longer, much nicer, brighter, quieter and accelerate faster.I live outside the area. Is it possible to summarise what the benefits are so far from a passenger perspective, particularly speed and frequency (as most passengers won’t know/care how trains are powered)?