berneyarms
Established Member
A small correction.Can now confirm that over twenty different companies expressed an interest, including at least one company offering to explore a battery retrofit of an existing UK EMU. I am assuming those would be the 350/2s, simply by process of elimination. The expected number of expressions of interest was between five and ten, so having more than double the number of companies interested is obviously slowing things down.
Current conversations have centred around storage and maintenance space, and which features will be included. As I understand, concerns were raised over through gangways between units and the unit's acceleration/braking profiles, as well as the potential issues with a low floor design fitting inside GB loading gauge for BEMU stock.
In addition, the current problems emerging with Alstom's new fleet for the Dublin LUAS, some of which may be subject to legal proceedings, and in particular the battery performance and longevity have given food for thought. It appears that the battery supplier for their BEMUs has been unable to provide a product that meets the specifications, and current concerns over said battery supplier potentially being involved in this tender have led to a pause while more information is gathered about the issue, and how it can be avoided.
Alstom are building trains for Dublin’s DART network, not LUAS trams.