I can't find a recent thread for this but wondered how long Farncombe, Haslemere and Petersfield signal boxes have got left before Basingstoke ASC takes over
Many thanks
Many thanks
Evening,I can't find a recent thread for this but wondered how long Farncombe, Haslemere and Petersfield signal boxes have got left before Basingstoke ASC takes over
Many thanks
Thank you :Evening,
Planned to switch over in early November. And to be pedantic it’s Basingstoke ROC rather than the ASC which is taking over. They’re two different locations approximately 15 minutes walk apart.

Once decommissioned, the Haslemere signal box which first opened in 1895 will be used as a small museum, run by the Haslemere Community Station and Signal Box Trust. Ken Griffiths, Chairman of the Haslemere Community Station and Signal Box Trust, added: "We are determined to preserve the Haslemere Signal Box as an educational facility for future generations to enjoy and celebrate the railway's heritage in this year of Railway 200.
"We would like to thank Network Rail for their constructive support in our endeavour, and look forward to being able to open the signal box up to the public in the very near future."
As the signalbox would no longer need direct access to the platform, given the position of the stairway from images on this site: https://www.haslemereinfohub.co.uk/signalbox.html it doesn't look imposible to rejig the fencing to have thee stairs outside the platform fencing.There was an article on the Surrey Live website a day or two ago about a local group planning to establish Haslemere signal box as a museum. I'm not quite clear how access will work as it's on the down platform and Haslemere is gated.
Wow, I would never have thought Haslemere had a mechanical frame driving the colour lights!As the signalbox would no longer need direct access to the platform, given the position of the stairway from images on this site: https://www.haslemereinfohub.co.uk/signalbox.html it doesn't look imposible to rejig the fencing to have thee stairs outside the platform fencing.
Quite common practice on the South Western Division, Wokingham, Havant (old) and the Dorset Coast boxes were the sameWow, I would never have thought Haslemere had a mechanical frame driving the colour lights!
Quite common practice on the South Western Division, Wokingham, Havant (old) and the Dorset Coast boxes were the same.
The LMS also had a policy of converting 'Remote Distants' (i.e. those standing on their own and not part of a gantry of signals) to colour-lights from the mid-1920s onwards. (Although St Albans didn't get altered until 1938!)......Lots of boxes all over the country have colour light signals worked from lever frames: the Western Region converted many Distant signals to two-aspect colour lights. The lever just becomes a big switch, but the interlocking can still function as before with only minimal alterations.
Have a feeling the S&C at Haslemere may also have had a slight speed upgrade. But not 100% sure, it's been a long time since I worked on anything to do with the project.The extra signals on the Down between Witley and Haslemere are welcome. All to frequently the fast has been held up while a late stopper gets through the signal section and into the middle road.
At Haslemere crossovers and the loop are now 40, and the through lines are 60/85Have a feeling the S&C at Haslemere may also have had a slight speed upgrade. But not 100% sure, it's been a long time since I worked on anything to do with the project.
Have they gained flashing yellows?That's correct, the speeds have increased from 30 to 40 accessing platforms two and three.
They haveHave they gained flashing yellows?
Excellent, can see that making a difference.They have
Sadly not much benefit when there's only 2tph south of Haslemere. There seems to be no ambition to improve on the poor and uneven post Covid timetable.... Headlines are more signals for closer headways, level crossing upgrades to full barriers with obstacle detection and some ground position light signals replaced with main aspects to enable more reversing moves at Petersfield and Haslemere.