From my posting in the Greatest gathering thread:

Roof components for one carriage on 345 071; there's several half complete bodyshells by the fence at the SW corner of the site as well, which will be photographable to anyone who wants to walk that far down the road.

...so it's probably time for us to keep a close eye on these ten units?

A question about the bodyshells outdoors near the fence at the SW corner of the factory site; do they normally park half complete bodyshells there or were they moved outside for the duration of the event owing to the erecting shop being full of stalls and visiting exhibits?

img_20250802_140726-jpg.185392
img_20250802_140735-jpg.185393
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!
Nice, I honestly didn't notice so thanks for sharing these photos. Did you find out from someone that the roof components for one carriage on 345071 are indeed for 345071, and that the 71st-80th 345s will be numbered 345071-345080?

I do find it amusing that (345071) will have had, "during" its build, "My Lords" and "Hellfire" T-shirts sitting on equipment still attached to part of it :lol:
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
From my posting in the Greatest gathering thread:



...so it's probably time for us to keep a close eye on these ten units?

A question about the bodyshells outdoors near the fence at the SW corner of the factory site; do they normally park half complete bodyshells there or were they moved outside for the duration of the event owing to the erecting shop being full of stalls and visiting exhibits?

img_20250802_140726-jpg.185392
img_20250802_140735-jpg.185393
The 'bodyshells' outside alongside the main road have been there for many months, possibly since the original 345 built. I would not read too much into those being there.

I can remember when 710s were all
Complete in certain I saw a single 710 carriage or parts of one dumped in the same area.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,796
Location
Epsom
Nice, I honestly didn't notice so thanks for sharing these photos. Did you find out from someone that the roof components for one carriage on 345071 are indeed for 345071, and that the 71st-80th 345s will be numbered 345071-345080?

I do find it amusing that (345071) will have had, "during" its build, "My Lords" and "Hellfire" T-shirts sitting on equipment still attached to part of it :lol:
Yes, I asked a steward who was a member of the Alstom staff outside that shed; this person immediately pointed me to another steward a couple of feet away and he confirmed yes that is the roof for part of 345 071.

We don't have actual definite confirmation that the number sequence will follow on sequentially, though when we did discuss this on this forum at the time the order was placed last year the conclusion was that they would be as they were to the exact same specification. They are certainly listed as 345 071 to 345 080 in the Combined Volume, although of course their guess is as good as ours...

There were reports a few months ago that work had started on the construction of the additional units so i would hope there's more than a single carriage roof extant by now?
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!
Yes, I asked a steward who was a member of the Alstom staff outside that shed; this person immediately pointed me to another steward a couple of feet away and he confirmed yes that is the roof for part of 345 071.

We don't have actual definite confirmation that the number sequence will follow on sequentially, though when we did discuss this on this forum at the time the order was placed last year the conclusion was that they would be as they were to the exact same specification. They are certainly listed as 345 071 to 345 080 in the Combined Volume, although of course their guess is as good as ours...
Many thanks :)

There were reports a few months ago that work had started on the construction of the additional units so i would hope there's more than a single carriage roof extant by now?
Perhaps "work starting on construction" included some preparatory work before the start of literal construction? I'm guessing production/construction will speed up with The Greatest Gathering out of the way.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
When are these 345 needed? For when Old Oak opens?
Or as soon as possible to run more services now on existing Elizabeth line?

I seem to recall these extra 10 units were ordered when previous government stated that HS2 would terminate at Old Oak?
 

boiledbeans2

Member
Joined
15 Oct 2020
Messages
960
Location
UK
I hope they have door open buttons on the interior side of the passenger doors!

The existing trains only have interior door open buttons on each side of the door, i.e., 2 buttons in total. However, they are frequently blocked by standing passengers on either side of the door.

The newer Class 710s have solved this problem by adding button on the interior side of the doors. So they have 3 interior door open buttons in total.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
I hope they have door open buttons on the interior side of the passenger doors!

The existing trains only have interior door open buttons on each side of the door, i.e., 2 buttons in total. However, they are frequently blocked by standing passengers on either side of the door.

The newer Class 710s have solved this problem by adding button on the interior side of the doors. So they have 3 interior door open buttons in total.
I can imagine they will keep things exactly the same on the new builds, to ensure consistency for customers.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,712
Location
West of Andover
I can imagine they will keep things exactly the same on the new builds, to ensure consistency for customers.
Other than maybe using USB sockets fitted from new, in a similar style to what's been retrofitted to the existing units.
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,899
Location
London

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,935
Location
Wales (sometimes in England), thanks for replying!

Purple Train

Established Member
Joined
16 Jul 2022
Messages
2,444
Location
Despond
I hope they have door open buttons on the interior side of the passenger doors!

The existing trains only have interior door open buttons on each side of the door, i.e., 2 buttons in total. However, they are frequently blocked by standing passengers on either side of the door.

The newer Class 710s have solved this problem by adding button on the interior side of the doors. So they have 3 interior door open buttons in total.
I doubt it, as in my experience the only time it's ever a problem is when the passenger in question is actually leaning on the button, which stops all buttons for that door working and therefore wouldn't be solved by adding an extra button, given it makes no difference to our ability to talk to strangers!
 

1D54

Established Member
Joined
1 Jun 2019
Messages
1,463
Any date there or thereabouts for the first entry into service for these new 345s?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,945
Location
London
I can imagine they will keep things exactly the same on the new builds, to ensure consistency for customers.

Yes I don’t think there’s going to be any discernible difference to the new 10 compared with the previous 70 with the exception of USB mods as standard.

== Doublepost prevention - post automatically merged: ==

Any date there or thereabouts for the first entry into service for these new 345s?

Not yet. This thread will probably be fairly quiet for a year or so.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,796
Location
Epsom
Thank you @ainsworth74

Last week there was fairly heavy coverage in the railway media of a visit to Derby by a number of railway journalists from various organisations to see the progress with these units.

From the published reports, it would appear that 345 071 is now complete, although it is not clear if it fully fitted out inside or not, and that construction of 345 072 is well advanced.

The reports suggested that these units will start entering service towards the end of this calendar year, but prior to any uplift of services I got the impression from reading the various reports that they will first provide fleet cover while overhauls start on the existing fleet.

Doing a Google search for "additional class 345" will provide links to many of these reports.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,268
Location
Bath
The reports suggested that these units will start entering service towards the end of this calendar year, but prior to any uplift of services I got the impression from reading the various reports that they will first provide fleet cover while overhauls start on the existing fleet.
Further supported by the commissioner’s report for the board meeting next Tuesday (p12):
To support this expanding timetable and prepare for future growth, production continues on the 10 new Elizabeth line trains currently being manufactured. The trains will be delivered this year and in 2027, with testing of the first train expected to begin on the network this summer. The introduction of the new trains will strengthen operational resilience and enable further service improvements, including serving Old Oak Common station when it opens for HS2 services.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,945
Location
London
There’s no timetable uplift that requires additional trains until May 2027. So in the interim they will provide additional resilience and cover for overhauls.
 

Covshire1

Member
Joined
4 Jan 2018
Messages
302
There is a video of an influencer driving 345071 round the Litchfield Lane test track on 'socials' so it must be pretty close to delivery...
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
17,796
Location
Epsom
There is a video of an influencer driving 345071 round the Litchfield Lane test track on 'socials' so it must be pretty close to delivery...
That would tie in with my estimate in #23. :)

I wonder how long it would take for it to do the fault free running after delivery and then slip into service?
 

bnc2018

Member
Joined
14 May 2021
Messages
51
Location
Banbury, Oxfordshire
Are any depot/stabling modifications required to accommodate the new trains? Or was everything originally designed assuming they would arrive at some point?
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,022
Location
West Wiltshire
Are any depot/stabling modifications required to accommodate the new trains? Or was everything originally designed assuming they would arrive at some point?
I think it was said longer term need 2 or 3 more stabling sidings, not for day to day, but during disruption might end up with too many trains in one area, so eases it operationally.

Once Old Oak Common station opens, the 3 current reversing sidings at Westbourne Park can be used for stabling, ,
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,307
There is a video of an influencer driving 345071 round the Litchfield Lane test track on 'socials' so it must be pretty close to delivery...
Taken from Today Railways Twitter/X

The first of the next batch of 10 @TfL Elizabeth Line trains (345071) is now complete & on test at @AlstomUK Derby, with work well underway on 072. 071 is due to be delivered to Old Oak on 15/06, due to be hauled by a ROG 93. Fault free running will then be undertaken on the WCML
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,268
Location
Bath
Once Old Oak Common station opens, the 3 current reversing sidings at Westbourne Park can be used for stabling, ,
This isn’t true, there is no access or walking routes, and the sidings are obviously surrounded by two running lines which would be very intensively used. Not all trains are planned to run to OOC anyways, currently the plan is 18tph, although the full 24tph could be possible in the longer term, and so Westbourne Park will still be used for reversing, just not as intensively.
 