And now we wait for the legal challenges to start flying!
Absolutely.And now we wait for the legal challenges to start flying!
That is disappointing, I was hoping for trenitalia to get the depot access.
--“ORR set out its decision to approve Virgin Trains’ application, and reject applications from Evolyn, Gemini and Trenitalia, in a decision letter today. Informed by independent analysis, and having also considered Eurostar’s growth plans, the regulator considers that Virgin Trains has the strongest prospects of making the best use of capacity at Temple Mills.”
So the way is now clear for Virgin Trains Europe to proceed to negotiate track, station and depot access for services to start in 2030, using Avelia Stream rolling stock.We have carefully considered four applications requesting access to TMI. We have also carefully considered submissions provided by the facility owner, Eurostar International Limited (EIL), concerning its planned use of TMI. The applications were made by Evolyn Mobility Limited (Evolyn), Virgin Trains Europe Holdings Limited (VTE), Gemini TOC Limited (Gemini) and Trenitalia France SAS (Trenitalia) and were submitted to us under section 17 of the Railways Act 1993 (the Act) between August 2024 and March 2025. 2. We have decided to approve the application from VTE on the basis that capacity at TMI is sufficient to accommodate the maintenance services VTE has applied to access and it has the strongest prospects of making best use of the capacity at TMI. We have rejected the applications from Evolyn, Gemini and Trenitalia on the basis that there is insufficient capacity at TMI to accommodate them in addition to VTE (and EIL’s own current use
In the case of Trenitalia and Evolyn, ORR is under the impression that their intended services wouldn't have met train length requirements for the Chunnel, and that out of the four applicants Virgin's plans were the most detailed and therefore more feasible to implement.I’m surprised it’s not Trenitalia, but I’m glad it’s someone. I have hope for Virgin, and I’m excited to see competition finally. Maybe the other contenders will use a continental depot until that other one planned for the UK is built?
Does Stratford even have any facilities for border control considering they've never been used? And would the platforms need to be lowered again?Stratford
From a technical standpoint would it be overly difficult to lop 2 metres off of an existing platform by removing say one set of seats from each end carriage? Having said that Hitachi and EMR seem to have had a fair bit of difficulty with the shortened Class 810s.Reading the decision letter, it seems a lot of basis of decision was about 202m length of units, which when coupled would exceed the 400m depot road (and if not coupled would utilise 2 roads).
The letter does list the proposed services and unit types in the annex for each of the 4 applicants. The basis for the choice seems to be some sort of (unspecified) weighting of pros and cons of each application.
What I can't fathom is unless Eurostar has ordered shortened trains, the standard double deck Avelia Horizon are 202m long, so rejecting bids on basis of trains being 200-202m long seems irrational. Even more odd when section 23 of the annex refers to a new 4 road 415m maintenance shed for Eurostar (of course if Eurostar can invest in buildings, not clear why others couldn't extend a building a few metres)
The lawyers will have fun with this.
Virgin say they will stop at Ashford if the station reopens for cross-Channel services.As long as they are made to stop at Stratford, Ebbsfleet and Ashford otherwise we'll have a carbon copy of Eurostar!
Thanks for sharing the letter - lots of interesting stuff in there. I would be very surprised if Eurostar, at least, doesn't initiate a legal challenge, and could see some of the other contenders start some.Reading the decision letter, it seems a lot of basis of decision was about 202m length of units, which when coupled would exceed the 400m depot road (and if not coupled would utilise 2 roads).
The letter does list the proposed services and unit types in the annex for each of the 4 applicants. The basis for the choice seems to be some sort of (unspecified) weighting of pros and cons of each application.
What I can't fathom is unless Eurostar has ordered shortened trains, the standard double deck Avelia Horizon are 202m long, so rejecting bids on basis of trains being 200-202m long seems irrational. Even more odd when section 23 of the annex refers to a new 4 road 415m maintenance shed for Eurostar (of course if Eurostar can invest in buildings, not clear why others couldn't extend a building a few metres)
The lawyers will have fun with this.
Nope, all that space was pretty much instantly repurposed for offices/training rooms. Not impossible to change it back but I think Stratford International ever actually seeing international services is a long shot.Does Stratford even have any facilities for border control considering they've never been used? And would the platforms need to be lowered again?
Inarticulate Gallic screams of rage from SNCF no doubt, followed by a deluge of lawyers letters, a solemn declaration by the French minister for Transport that this constitutes a step back in British-French relations, escalating to a pitched re-enactment of the Race to the North (1888/1895) whereby Eurostar and Virgin progressively increase their speeds to reduce journey times in a frantic attempt to outdo each other, culminating in one or both companies digging a clandestine second Channel Tunnel that is more direct than the original, while also running a stealthy political campaign of dirty tricks to convince passengers that their rivals trains are infested with bedbugs and substandard alcoholic beverages. (I'll let you all decide where the sarcasm starts)Congratulations to virgin, good to finally have solid steps to competition
Curious as to what will be all the public reactions, especially from Eurostar
It could be a spanner in the works for them. Quoting the decision letter:Where does this leave Eurostar's own plans for expansion?
Given the wide public interest in the development of competition, our duty to promote it, and the duty of depot facility owners to grant access to other operators, we consider there should be a high bar for the quality of evidence to demonstrate that capacity cannot be made available. We remain of the view that sufficient capacity can be made available, noting that doing so is likely to require EIL to revisit its plans.
Potential to 'get stuck in a loop' and not do anything. They will stop if the station reopens. The station won't reopen if no one's using it... Opportunity for lots of happy words without definite commitment/action. Naturally, we're only in very early days at present and things can change.Virgin say they will stop at Ashford if the station reopens.
Yes I agree.Though from the letter it does appear there are good reasons to prefer Eurostar, Trenitalia, and Virgin over Gemini or Evolyn, I am less convinced by the arguments that made them prefer Virgin over Eurostar or Trenitalia.
Not necessarily - even if they operate on the same routes they can still innovate on service (not hard to beat eurostar there) and price.As long as they are made to stop at Stratford, Ebbsfleet and Ashford otherwise we'll have a carbon copy of Eurostar!
I believe the UK is investigating the possibility of building an additional one?I’m surprised it’s not Trenitalia, but I’m glad it’s someone. I have hope for Virgin, and I’m excited to see competition finally. Maybe the other contenders will use a continental depot until that other one planned for the UK is built?
Evolyn is not proposing to use E320s, they announced they would use Velaro Novos which are a currently unproven platform used only in a Deutsche Bahn test train.Evolyn appears to have suffered by not submitting loads of extra information (but should an application really be based on number of pages of info, even if some is consultant written padded waffle, instead of just key points). Their other mistake seems to be advising they would get Siemens E320 after the deadline (although as these type are currently operated, probably least risky from certification point of view).
The main thing you're missing is that there is ample capacity available in the Channel Tunnel and the High Speed 1 link to St Pancras. Yes there is a capacity constraint at St Pancras, but LSPH/HS1 Ltd does at least have a plan for this.So, this isn't the right to run channel tunnel services? Just the preferred user for a depot? Obvious positive in a bid to run international trains.
The other parties can still bid but just propose alternative depot facilities?.If Virgin don't get the right to run services, what happens to the Temple Mill capacity? It all seems a bit messy!
Wouldn't it be better to make depot access an integral part of running cross-channel trains out of St. Pancras?
Am I missing something?! (Polite answers only!).
Yes ... it's a little place outside London!Manchester?
Yes ... it's a little place outside London!