Class 701 'Aventra' trains for South Western Railway: progress updates

Siemens Staines

Established Member
Joined
30 Jul 2015
Messages
1,534
I'm only aware of 23 units out today, 013 and 039 being the absentees.

That tallies, the 23 701s that were in use plus the one 701 diagram that was covered by 5728 + 5737.

Reading - Wokingham is open tomorrow, so it should be 25 701 diagrams as of tomorrow. Whether there will be 25 units available to cover the 25 diagrams is a different matter!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,788
Location
SW London
That tallies, the 23 701s that were in use plus the one 701 diagram that was covered by 5728 + 5737.

Reading - Wokingham is open tomorrow, so it should be 25 701 diagrams as of tomorrow. Whether there will be 25 units available to cover the 25 diagrams is a different matter!
There have never been more than 23 on the same day, but that has been acheived for five weekdays in a row now.
 

PG

Established Member
Joined
12 Oct 2010
Messages
3,470
Location
at the end of the high and low roads
Whether there will be 25 units available to cover the 25 diagrams is a different matter!
There have never been more than 23 on the same day, but that has been acheived for five weekdays in a row now.
On a positive note 92% availability for a new fleet that is still being introduced is pretty respectable - hats off to all involved!
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,904
Location
London
701033 and 048 are having their entrance checks done, one or two issues on 048 to be fixed which arent major from what I hear, both enter the testing cycle after that and will wait their turn before seeing service.
 

WWTownEnth

Member
Joined
21 Mar 2014
Messages
748
701033 and 048 are having their entrance checks done, one or two issues on 048 to be fixed which arent major from what I hear, both enter the testing cycle after that and will wait their turn before seeing service.
Pardon my ignorance but is the testing cycle you refer to the same as fault free running? If it’s different, how long does it take assuming no further problems?
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,213
On a positive note 92% availability for a new fleet that is still being introduced is pretty respectable - hats off to all involved!
Better than you'd expect for an established fleet and a tall order for a new fleet to achieve!

In the latest Modern Railways reliability survey, after a few periods of stagnating at around 3.5-4k miles per failure (known as 701D), reliability improved to over 9k miles per failure in Period 4 (four weeks starting late June).

The issue seems to be the very slow progress in clearing units for service.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,718
Location
Croydon
Better than you'd expect for an established fleet and a tall order for a new fleet to achieve!

In the latest Modern Railways reliability survey, after a few periods of stagnating at around 3.5-4k miles per failure (known as 701D), reliability improved to over 9k miles per failure in Period 4 (four weeks starting late June).

The issue seems to be the very slow progress in clearing units for service.
Very true - its is a good reliability figure even for a bedded in fleet.

I will call that very thorough acceptance testing, which is a respectable way to do things 8-).
(my bold).

Just to keep the testers busy. Next delivery to Wimbledon from Long Marston is in the system for tomorrow evening - Wednesday 29/10/2025.


5Q70
14:35 Long Marston departure
18:52 Acton Mainline
18:58 Willesden (low level)
19:17 - 19:22 Clapham Junction Pl 6
........ (round the Kingston loop)
20:24 Wimbledon Stn
20:31 Wimbledon Park Depot arrival
But the deliveries usually run early. Allow an hour so I usualy aim for Wimbledon knowing I can catch it an hour early at Clapham Junction !

For those wanting advance notice the light loco from Leicester is
0V70
08:51 Leicester departure
12:31 Long Marston arrival

 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,788
Location
SW London
5Q70
14:35 Long Marston departure
18:52 Acton Mainline
18:58 Willesden (low level)
19:17 - 19:22 Clapham Junction Pl 6
........ (round the Kingston loop)
20:24 Wimbledon Stn
20:31 Wimbledon Park Depot arrival
But the deliveries usually run early. Allow an hour so I usualy aim for Wimbledon knowing I can catch it an hour early at Clapham Junction !
Why do they go round the Kingston Loop rather than the direct route via East Putney? Is there a right way round and a wrong way round for them? Or are locos not allowed on that route?
 

NSEWonderer

Established Member
Joined
5 Dec 2020
Messages
2,904
Location
London
Pardon my ignorance but is the testing cycle you refer to the same as fault free running? If it’s different, how long does it take assuming no further problems?
Yes and no, the cycle is what all units that become passenger service competent will do. Various tests, then used on trial runs and driver training and then when ready deemed passenger ready, this may have been tweaked lately to expedite the process but its pretty much what all the current passenger running units have done, nothing new.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,718
Location
Croydon
Why do they go round the Kingston Loop rather than the direct route via East Putney? Is there a right way round and a wrong way round for them? Or are locos not allowed on that route?
I assume it means less conflicting moves.

If the delivery from the Willesden direction were to go the short route then it would have to cross the entirety of SWR tracks at Clapham Junction to gain the down slow or fast towards Wimbledon. It would then have to cross again to get to the depot. Note that going via East Putney would require a reversal (run-round) at/near Wimbledon station to get into the depot (the half of the depot nearest London btw). It also leaves the locomotive in the right place to go forward back to Leicester.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,244
Location
UK
Why do they go round the Kingston Loop rather than the direct route via East Putney?
As units that are not accepted for passenger service they need to be positioned in the Maintenance section of Wimbledon depot, the East depot (London end, Earlsfield side of Durnsford Road bridge) in the first instant.

Entering the depot off the East Putney line at Wimbledon Park station would mean a reversal on the washer road and a propelling move London bound under Durnsford Road bridge, causing a blockage of all other movements in the Top yard (the stabling sidings visible alongside the LUL District line) for perhaps 10-15 mins, but I also suspect that a 10 car plus loco, is in reality too long physically to undertake such a move (within depot limits). One has to 'know' the depot and various shunt limitations to understand the finer detail.

Therefore the best (possibly the only) viable route in to the depot is off the Up Main Slow through Wimbledon station, in to No 1 Reception road which allows a head on run under Durnsford Road bridge in to the East depot, a move that will take (perhaps) 5 mins in total within depot limits and thus causes the least disruption etc.

PS: in addition to other (similar) very valid points made by Peter Sarf whilst I've been typing (lol!)
 
Last edited:

Meglos

Member
Joined
19 Dec 2020
Messages
194
Location
london
I assume it means less conflicting moves.

If the delivery from the Willesden direction were to go the short route then it would have to cross the entirety of SWR tracks at Clapham Junction to gain the down slow or fast towards Wimbledon.
There is no direct route from Latchmere Junction onto the SWML down tracks. You would either have to route into the Clapham Junction sidings and reverse towards Waterloo and then reverse again onto the SWML down, or route towards Queenstown Road, and then reverse on the SWML. both of which would seriously mess with the large amount of services on the SWML.

This is why the Tolworth Sidings/Chessington South Sidings to Willesden Junction aggregate trains route via Haydons Road and the Brighton Main Line from Wimbledon to Clapham Junction. This uses the dive-under route to Latchmere Junction from platforms 16/17 at Clapham Junction.
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,244
Location
UK
There is no direct route from Latchmere Junction onto the SWML down tracks. You would either have to route into the Clapham Junction sidings and reverse towards Waterloo and then reverse again onto the SWML down, or route towards Queenstown Road, and then reverse on the SWML. both of which would seriously mess with the large amount of services on the SWML.
Quite right. Such a route would never be considered in the planning sense for moves such as those in question. As I touched on, the route off the WLL would be down the Windsor Slow line and turn left via East Putney, Southfields and in to the depot at Wimbledon Park station, but again as said, a 10 car plus loco is, I believe too long (within depot limits) for that to work, in addition to the excessive time such a shunt would take within what is a very busy depot.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,718
Location
Croydon
There is no direct route from Latchmere Junction onto the SWML down tracks. You would either have to route into the Clapham Junction sidings and reverse towards Waterloo and then reverse again onto the SWML down, or route towards Queenstown Road, and then reverse on the SWML. both of which would seriously mess with the large amount of services on the SWML.

This is why the Tolworth Sidings/Chessington South Sidings to Willesden Junction aggregate trains route via Haydons Road and the Brighton Main Line from Wimbledon to Clapham Junction. This uses the dive-under route to Latchmere Junction from platforms 16/17 at Clapham Junction.
Thanks. I was not 100% sure that there was even a suitable link onto the down SWML from Latchmere Junction (ie from the Willesden direction). If there was then the impact would be on the entirety of the routes to/from Waterloo !.

== Doublepost prevention - post automatically merged: ==

Quite right. Such a route would never be considered in the planning sense for moves such as those in question. As I touched on, the route off the WLL would be down the Windsor Slow line and turn left via East Putney, Southfields and in to the depot at Wimbledon Park station, but again as said, a 10 car plus loco is, I believe too long (within depot limits) for that to work, in addition to the excessive time such a shunt would take within what is a very busy depot.
Indeed. Having watched proceedings at Wimbledon depot there are times the depot/sidings entrance appears quite likely to be operating at its limits.

Also I am not sure there is even much space for a lumbering freight in amongst the district line services. Especially as it gingerly tries to take all available reversing/headshunt space (if the space is even long enough) !.
 
Last edited:

Meglos

Member
Joined
19 Dec 2020
Messages
194
Location
london
Thanks. I was not 100% sure that there was even a suitable link onto the down SWML from Latchmere Junction (ie from the Willesden direction). If there was then the impact would be on the entirety of the routes to/from Waterloo !.

== Doublepost prevention - post automatically merged: ==


Indeed. Having watched proceedings at Wimbledon depot there are times the depot/sidings entrance appears quite likely to be operating at its limits.

Also I am not sure there is even much space for a lumbering freight in amongst the district line services. Especially as it gingerly tries to take all available reversing/headshunt space (if the space is even long enough) !.
Having joined a District line train at East Putney for Wimbledon last Thursday morning, we got caught behind a simple Class 450 movement from Waterloo to Wimbledon Depot via Point Pleasant Junction. We had to wait 5 minutes at East Putney after the 450 had passed, and a further 5 minutes between Earlsfield and Wimbledon Park whilst the 450 entered the depot. By the time we made it to Wimbledon, then next two district line trains were right behind us.
 

norbitonflyer

Established Member
Joined
24 Mar 2020
Messages
5,788
Location
SW London
I assume it means less conflicting moves.

If the delivery from the Willesden direction were to go the short route then it would have to cross the entirety of SWR tracks at Clapham Junction to gain the down slow or fast towards Wimbledon. It would then have to cross again to get to the depot.
That (via Earlsfilel) is not what I was suggesting, and is not possible anyway as there is no link to the SWML from the West London Line except via the Windsor Lines or via Tooting. Other posters have explained why Point Pleasant/east Putney is impractical

== Doublepost prevention - post automatically merged: ==

the route off the WLL would be down the Windsor Slow line and turn left via East Putney, Southfields and in to the depot at Wimbledon Park station, but again as said, a 10 car plus loco is, I believe too long (within depot limits) for that to work, in addition to the excessive time such a shunt would take within what is a very busy depot.
Thanks. I thought it mighht be soemthing like that, but hadn't appreciated that the train wouold be too long - I assume a 10-car unit on its own (sans locomotive and barriers if any) could enter the depot from that direction though?
 

Big Jumby 74

Established Member
Joined
12 Feb 2022
Messages
2,244
Location
UK
Thanks. I thought it mighht be soemthing like that, but hadn't appreciated that the train wouold be too long - I assume a 10-car unit on its own (sans locomotive and barriers if any) could enter the depot from that direction though?
To be clear I was assuming barrier vehicles as well - should have made that clear. 10 car EMU and 12 car on their own, can and do enter the depot via Wimbledon Park station (LUL) entrance, thence run via one of the reception roads to gain access to No 1 or 2 washer roads.

It is one of these two roads that any move such as the 701 delivery being discussed would have to access if running via East Putney, before being propelled by the train loco London bound to the East depot, which whilst doing so would effectively stop any/all other moves in that (west end - Top Yard) part of the depot, which being the major stabling area for service trains is the busiest for service train movements.

So running via Kingston and the Up slow line, entering the depot via Wimbledon station (p5) and No 1 road in the depot, the move is in effect just one additional pathway taken up entering the depot, hence minimal disruption to other moves. The loco detachment and any subsequent unit shunting taking place in the East depot at a time convenient to the depot and loco driver, and not reliant on having to fit in with the wider timetable schedules associated with the main line.
 

73128

Member
Joined
8 Dec 2019
Messages
471
Location
Reading
To be clear I was assuming barrier vehicles as well - should have made that clear. 10 car EMU and 12 car on their own, can and do enter the depot via Wimbledon Park station (LUL) entrance, thence run via one of the reception roads to gain access to No 1 or 2 washer roads.

It is one of these two roads that any move such as the 701 delivery being discussed would have to access if running via East Putney, before being propelled by the train loco London bound to the East depot, which whilst doing so would effectively stop any/all other moves in that (west end - Top Yard) part of the depot, which being the major stabling area for service trains is the busiest for service train movements.

So running via Kingston and the Up slow line, entering the depot via Wimbledon station (p5) and No 1 road in the depot, the move is in effect just one additional pathway taken up entering the depot, hence minimal disruption to other moves. The loco detachment and any subsequent unit shunting taking place in the East depot at a time convenient to the depot and loco driver, and not reliant on having to fit in with the wider timetable schedules associated with the main line.
not normally any barrier vehicles on deliveries like this.. just loco +10
 

lewisf

Member
Joined
21 Feb 2009
Messages
381
Location
Kingston/Surbiton
Today's 2M03 onwards diagram was due to be 455-worked (vice 701) but this was cancelled anyway due to Wimbledon issues early this morning - not sure if the diagram was picked up later in the day. This seems a common occurrence for this diagram on Mondays anyway (455s replacing a 701).

This diagram has been 455 operated every day this week so far
 

mansonlo49

Member
Joined
11 Dec 2023
Messages
1,017
Location
uk
Here is a list of the deliveries and testing info to date:

701001

701002 delivered to Eastleigh on 10 June 2020; at Clapham Yard

701003

701004 delivered to Wimbledon on 30 June 2020; at Eastleigh

701005 delivered to Eastleigh on 20 July 2020; entered passenger service 27 August 2025

701006 delivered To Eastleigh on 31 July 2020; stored at Long Marston

701007 delivered to Eastleigh on 14 August 2020; stored at Long Marston

701008 delivered to Eastleigh on 1 September 2020; stored at Long Marston

701009 at Eastleigh; entered passenger service 17 October 2025

701010 stored at Long Marston

701011 delivered to Eastleigh on 12 October 2020

701012 delivered to Eastleigh on 18 September 2020; in passenger service

701013 delivered to Eastleigh on 5 November 2020; in passenger service


701014 delivered to Eastleigh on 4 December 2020; stored at Marchwood

701015 delivered to Eastleigh on 16 December 2020; testing at Clapham Yard

701016 delivered to Eastleigh on 7 January 2021; stored at Marchwood

701017 delivered to Eastleigh on 5 January 2022; in passenger service

701018 delivered to Eastleigh on 13 January 2021; in passenger service 6 July 2025


701019 delivered to Eastleigh on 12 August 2021; stored at Long Marston

701020 testing at Clapham Yard; in passenger service 8 October 2025

701021 testing at Clapham Yard

701022 delivered to Eastleigh on 20 May 2021; at Clapham Yard

701023 delivered to Eastleigh on 29 March 2021

701024 testing at Clapham Yard

701025 delivered to Eastleigh on 17 March 2021; in passenger service

701026

701027 at Eastleigh

701028 delivered to Eastleigh on 24 April 2021; in passenger service

701029 delivered to Eastleigh on 18 May 2021; stored at Marchwood

701030 stored at Long Marston

701031 delivered to Eastleigh on 7 May 2021; in passenger service

701032 delivered to Eastleigh on 28 May 2021; stored at Marchwood

701033 stored at Long Marston

701034 delivered to Eastleigh on 29 December 2021; in passenger service

701035 delivered to Wimbledon on 25 October 2021; in passenger service 28 May 2025

701036 in passenger service

701037 delivered to Eastleigh on 27 January 2022; in passenger service


701038 stored at Marchwood

701039 in passenger service

701040 testing at Clapham Yard

701041 delivered to Eastleigh on 11 March 2022; in passenger service 17 June 2025

701042 delivered to Eastleigh on 16 March 2022; entered passenger service on 21 May 2025

701043 delivered to Eastleigh on 29 March 2022; in passenger service


701044 delivered to Eastleigh on 8 April 2022; in passenger service 9 June 2025

701045 stored at Long Marston

701046 in passenger service

701047 stored at Marchwood

701048 stored at Long Marston

701049

701050 stored at Long Marston

701051 in passenger service

701052 stored at Long Marston

701053 testing at Clapham Yard; entered passenger service 26 August 2025

701054 testing at Clapham Yard; entered passenger service 13 August 2025

701055 at Clapham Yard

701056 testing at Clapham Yard

701057 at Clapham Yard

701058 in passenger service

701059

701060 at Eastleigh

701501

701502

701503 stored at Eastleigh

701504

701505

701506

701507

701508

701509

701510

701511

701512 stored at Long Marston

701519 stored at Long Marston

701528 at Clapham Yard

701529 at Clapham Yard

701530
There’s should be another unit coming out from long marston later today, 47727 on the way now
 

D7672

On Moderation
Joined
30 Jul 2022
Messages
117
Location
Newport
That confirmation helps with how many are now delivered and located.
Thanks for the update
 
Last edited by a moderator:

Nimbus020

Member
Joined
7 Mar 2025
Messages
134
Location
SW London
This diagram has been 455 operated every day this week so far
Yes - although in the 2 weeks prior to this one, it switched to a 701 from Tues onwards (I think!)

== Doublepost prevention - post automatically merged: ==

701 044 has belatedly picked up one of the 701 diagrams today with 2J25 W'loo to Hampton Ct (departing from W'loo Plat 18)
 
Last edited:

TEW

Established Member
Joined
16 May 2008
Messages
6,228
Next week's new diagram;
5F01 0448 Clapham Yard to London Waterloo
2F01 0520 London Waterloo to Woking
2F10 0632 Woking to London Waterloo
2J11 0736 London Waterloo to Hampton Court
2J18 0823 Hampton Court to London Waterloo
2M17 0917 London Waterloo to Chessington South
2M24 1004 Chessington South to London Waterloo
2F23 1050 London Waterloo to Woking
2F32 1203 Woking to London Waterloo
2G33 1303 London Waterloo to Guildford
2G44 1434 Guildford to London Waterloo
2M43 1547 London Waterloo to Chessington South
2M50 1634 Chessington South to London Waterloo
2F49 1720 London Waterloo to Woking
2F58 1832 Woking to London Waterloo
2G59 1933 London Waterloo to Guildford
2G70 2103 Guildford to London Waterloo
2M69 2217 London Waterloo to Chessington South
2M94 2308 Chessington South to Wimbledon
5Y62 2330 Wimbledon to London Waterloo
 

JCO1406

Member
Joined
28 May 2024
Messages
191
Location
London
Next week's new diagram;
5F01 0448 Clapham Yard to London Waterloo
2F01 0520 London Waterloo to Woking
2F10 0632 Woking to London Waterloo
2J11 0736 London Waterloo to Hampton Court
2J18 0823 Hampton Court to London Waterloo
2M17 0917 London Waterloo to Chessington South
2M24 1004 Chessington South to London Waterloo
2F23 1050 London Waterloo to Woking
2F32 1203 Woking to London Waterloo
2G33 1303 London Waterloo to Guildford
2G44 1434 Guildford to London Waterloo
2M43 1547 London Waterloo to Chessington South
2M50 1634 Chessington South to London Waterloo
2F49 1720 London Waterloo to Woking
2F58 1832 Woking to London Waterloo
2G59 1933 London Waterloo to Guildford
2G70 2103 Guildford to London Waterloo
2M69 2217 London Waterloo to Chessington South
2M94 2308 Chessington South to Wimbledon
5Y62 2330 Wimbledon to London Waterloo
Funny how they keep releasing new 701 diagrams and yet they can't fully run the current ones...
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,213
Funny how they keep releasing new 701 diagrams and yet they can't fully run the current ones...
Yes, I really wasn't expecting a new one next week.

Unless there are further 701s being passed for passenger service before Monday I make that 25 units to cover 26 diagrams!
 

DMckduck

Member
Joined
26 Jul 2020
Messages
488
At this rate they may as well convert everything over to a 701 diagram, I'm sure the DFT can get creative with a headline
 