The communications surrounding this has been really poor. Why have TfL not put on additional (rail replacement) buses given that less than half the scheduled trains seem to be in operation? It also seems as if though the entire line is being used as collateral damage so to speak - I assume it's been looked into and ruled not feasible but what's preventing a near-normal service operating on the Battersea/Charing Cross/North London branches?
The difficulty is that what’s being run is a completely ad-hoc special service. It’s very hard to run a high frequency in this situation, and in any case the Morden/HB service is limited by how quickly trains can traverse the failure at Stockwell. In theory it would be possible to run some additional HB-Kennington trains (via either branch), but this may not be overly helpful as the busiest section is Stockwell southwards.
Completely agree the comms has been atrocious. With this now being day 4 of disruption, the senior leadership should be putting out comms as to what they’re doing about this, both in terms of the actual failure, and contingency travel arrangements.
I also find it quite remiss that there have been shutdowns during service hours to try snd rectify the issue, without any advance notice having been given to passengers. It’s bad enough that the service is shot to pieces, but at least under failure conditions as many people as possible can get from A to B. Worse to turn up off the Victoria Line at Stockwell and suddenly find there’s nothing running at all for an unspecified period.
Ideally, High Barnet-Battersea and Edgware-Morden would better match the limitations (as Morden is limited by the failure, so it’s better paired up with Edgware which is the less busy northern branch). But unfortunately this doesn’t really work because of where the depots are.