The only potential certain taker for the 350/2s was Northern and it appears they have ruled themselves out.

I think the comments by Northern have been misunderstood, they didn't rule themselves out but haven't said they are taking them, which is what any company would say until things are confirmed either way.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
How easy would it be for the 350/2s to have ETCS retrofitted?

If the 350/2s are to go to Northern they will need to have ETCS installed and working for when the WCML gets ETCS.
 

Rail Quest

Member
Joined
8 Apr 2023
Messages
758
Location
Warrington
How easy would it be for the 350/2s to have ETCS retrofitted?

If the 350/2s are to go to Northern they will need to have ETCS installed and working for when the WCML gets ETCS.
Presumably the process would be no different to the other sub-variants, all of which will also need it fitting for said WCML implementation.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,188
How easy would it be for the 350/2s to have ETCS retrofitted?

If the 350/2s are to go to Northern they will need to have ETCS installed and working for when the WCML gets ETCS.
Presumably the process would be no different to the other sub-variants, all of which will also need it fitting for said WCML implementation.
ETCS on WCML will, initially, only be north of Preston.

But in answer to the question - Porterbrook is doing work ”behind the scenes”.
 

jamieh27

Member
Joined
2 Jan 2023
Messages
662
Location
Falmouth
Northern want to replace their 323 fleet with the new build Class 382s.

Only way Northern are taking the 350/2s is if the Class 382 fleet is delayed, as the 323s have to be gone by 2031.
Would they really need 350/2 if they are getting 450 units replacing most of the BR fleet. Keeping the 195s as well as 331s and maybe 333s.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Would they really need 350/2 if they are getting 450 units replacing most of the BR fleet. Keeping the 195s as well as 331s and maybe 333s.
Northern are only planning to order 255 of that 450 trains.

The rest of the order book will be for Mayors and local authorities to buy if they want some.

The only part of Northern's current fleet staying with Northern permanently are the 195s and 331s.

== Doublepost prevention - post automatically merged: ==

And if Northern acquired the 350/2s, they'd be using them for a few years, not just one year or less.
That is 100% what the case would be if Northern took the 350/2s.

However I think a while ago somebody on this thread has said that the 350/2s trials proved they are not suitable for Northern's local stopping services.
 
Last edited:

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,630
Location
Greater Manchester
Oh right. Can you try and find that post? (I'll look for it myself later).
#1124

Latest I've heard is that the trials of the 350/2s on the Glossop line showed they could not keep up to timings so will not be suitable. The timings are very tight on this line, and the 323s remain superior for acceleration on a line with stations very close together.
 

amahy

Member
Joined
9 Dec 2024
Messages
502
Location
West Dunbartonshire
Also, 350/2s have only been stated as inappropriate for the Glossop Line. They haven't even been trialled on any of Northern's other routes.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,515
Location
Lichfield
Also, 350/2s have only been stated as inappropriate for the Glossop Line. They haven't even been trialled on any of Northern's other routes.

I doubt it's anything that couldn't be overcome with a couple of timetable tweaks though.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
More routes than just Glossop would need timetables tweaked to fit 350/2s.

Stoke is an example, 350/2s have slower door closing times than 323s which would be an issue there as timetabling is tight there as is.

Stoke is just one example, I'm sure there might be other lines with timetabling issues with 350/2s.
 

3RDGEN

Member
Joined
6 Mar 2023
Messages
634
Location
Hull
Could the 350/2 trial be related to the start of Network Bee on the trains from Dec 2026, the first lines are Man Picc - Glossop/Hadfield and Vic - Stalybridge. They stated it would included improvements for passengers so maybe take a few 350/2's, which could be maintained by Seimens at Ardwick as per the 350/4's, the 323's can support other services?
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Could the 350/2 trial be related to the start of Network Bee on the trains from Dec 2026, the first lines are Man Picc - Glossop/Hadfield and Vic - Stalybridge. They stated it would included improvements for passengers so maybe take a few 350/2's,
The trials may have been related to it, however given the 350/2s can't be used on the Glossop line I can't see the Bee Network wanting the 350/2s.

And thats if the Bee Network was counted as separate TOC and not part of Northern, and the bee network was allowed to have its own trains.

I think the Bee Network will just keep the rolling stock currently used on the lines which will be a part of the Bee Network. So 323s on Glossop etc…
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,164
Location
West Wiltshire
The trials may have been related to it, however given the 350/2s can't be used on the Glossop line I can't see the Bee Network wanting the 350/2s.

And thats if the Bee Network was counted as separate TOC and not part of Northern, and the bee network was allowed to have its own trains.

I think the Bee Network will just keep the rolling stock currently used on the lines which will be a part of the Bee Network. So 323s on Glossop etc…
Although the trials found them not suitable for stopping trains on lines with closely spaced stations (due to slow door cycles), it has not been made clear if they were rejected outright.

They are better suited to outer suburban and semi-fast services and are 110mph capable. They need a refurbishment and possibly new seats. But if a fleet shuffle / cascade allows them to be used on suitable Northern area services (rather than lines mentioned) doesn't appear to have been 100% ruled out yet. Or if it has there has been no confirmation, just rumours.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
They are better suited to outer suburban and semi-fast services and are 110mph capable
Does Northern even have any services like that?

Surely all of those services are covered by 331s?

The only outer suburban/Semi Fast Northern EMU service I could think of is the Blackpool North service, but surly Northern would not taken on the 350/2s just for one service.

It’s a shame the 350/2s are unsuitable for most of Northern's EMU local stopping services though.
 
Last edited:

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,186
Location
Bridge on the River Cam
Does Northern even have any services like that?

Surly all of those services are covered by 331s?

The only outer suburban/Semi Fast Northern EMU service I could think of is the Blackpool North service, but surly Northern would not taken on the 350/2s just for one service.

It’s a shame the 350/2s are unsuitable for most of Northern's EMU local stopping services though.
IIRC Blackpool North - Manchester Airport / Liverpool Lime Street services are some of, if not the busiest services on the Northern network so even if they would just run on those routes that'd already be a good use for them.
Plus, there's always demand for more mainline services. Depending on capacity (which there probably isn't), an additional tph from Liverpool or Manchester towards Lancaster, potentially via Golborne, would be well used. So would another Newcastle - Darlington (probably no capacity). In fact there may be a case for having some 350s located in the North East for ECML locals: Morpeth, Chathill, Newcastle-Darlington, and I would say the TPE Edinburgh too, but that seems to require a 125mph unit.

Rather than direct replacement of 323s, there's some merit in replacing 331s instead, allowing the 331s to be cascaded to replace 323s. 331s can and do occasionally run on the Glossop line.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
IIRC Blackpool North - Manchester Airport / Liverpool Lime Street services are some of, if not the busiest services on the Northern network so even if they would just run on those routes that'd already be a good use for them.
Plus, there's always demand for more mainline services. Depending on capacity (which there probably isn't), an additional tph from Liverpool or Manchester towards Lancaster, potentially via Golborne, would be well used. So would another Newcastle - Darlington (probably no capacity). In fact there may be a case for having some 350s located in the North East for ECML locals: Morpeth, Chathill, Newcastle-Darlington, and I would say the TPE Edinburgh too, but that seems to require a 125mph unit.

Rather than direct replacement of 323s, there's some merit in replacing 331s instead, allowing the 331s to be cascaded to replace 323s. 331s can and do occasionally run on the Glossop line.
Putting 350/2s on Blackpool services would be a huge issue capacity wise, a 4 car 350/2 has less capacity than a 6 car 323 and 8 car 350/2 running is a no go.

Northern plan to replace the 323s with new build Class 382s, but given the 323s have to be gone by 2031 a back up plan is needed in vase the new fleet gets delayed and perhaps a 331s cascade is something being looked at.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Thats if they get fitted with ASDO, which is not guaranteed to happen if Northern were to take the 350/2s.

How many 350/2s would be needed for 8 car Blackpool services anyway?

Can't see Northern wanting a micro-fleet but can't see Northern wanting a large fleet just to work services to Blackpool.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Thats if they get fitted with ASDO, which is not guaranteed to happen if Northern were to take the 350/2s.

How many 350/2s would be needed for 8 car Blackpool services anyway?

Can't see Northern wanting a micro-fleet but can't see Northern wanting a large fleet just to work services to Blackpool.
16 units would be needed for Blackpool. Plus you have the 2 Crewe services, potentially Stoke, Manchester Airport-Liverpool, Liverpool-Wigan/Blackpool and the 331s in the east which could all be replaced with 350/2. With some extra infrastructure, a couple could be sent to the North East to run the Morpeth shuttle, though I'm not sure if that's worth it
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
Sending only two to the North East would make the 350/2s a mico-fleet there so that won't happen.

350/2s could do well on Crewe services since it has slow lines.

Stoke is a no go for 350/2s, Stoke is worse than Glossop due to the even tighter timetables.

Northern are keeping their 331 fleet, so the 350/2s would not affect the 331 fleet.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Sending only two to the North East would make the 350/2s a mico-fleet there so that won't happen.

350/2s could do well on Crewe services since it has slow lines.

Stoke is a no go for 350/2s, Stoke is worse than Glossop due to the even tighter timetables.
Stoke is 110mph, so it's probably more doable, as they might be able to reach those speeds between Macclesfield, Congleton and Kidsgrove, though the impact might not be enough to ameliorate the slower acceleration.
 

Mamorin

Member
Joined
21 Sep 2020
Messages
471
Location
Cheshire
The slow door cycle would cause issues on Stoke stoppers, and acceleration than the 323s would be another huge issue on Stoke stoppers.

The 110mph between Macclesfield, Congleton and Kidsgrove would not make up for all the issues, and that is if there is enough time to reach 110mph.

It’s only 8 minutes between Congleton and Macclesfield using 323s.

Hence why 350/2s would be a no go on Stokes.
 