North West route - Network Rail
The North West route is home to powerhouse cities of Liverpool and Manchester, as well as tourist destinations such as Blackpool.
The main work takes place over nine days during February half term, from Saturday 14 – Sunday 22 February 2026. During this time, there will be no trains from the south and east of the city into Manchester.
Trains from the north will also be heavily impacted during the essential upgrades as well as direct connections to Manchester Airport station.
While the train shed (platforms 1-12) will close, Manchester Piccadilly station’s concourse will remain open to the public. There will be a limited service westbound from platforms 13 and 14. Staff will be on hand to coordinate bus and Metrolink journeys...
I have just been reading some notes from a poster on another forum from a recent Manchester Airport Consultative Committee. The public are admitted as observers and this poster was present. He refers to an 'Ardwick Blockade' for a two-week period in February 2026, when Manchester Airport will not receive any rail services from the Manchester Piccadilly Line as it will be closed for essential works.
Any blockade at Ardwick could potentially cut off all lines to Piccadilly, and nothing else has been publically mentioned about this as far as I can see. I would have thought that such a major closure would have been notified some time ago.
So would I be right in thinking that whatever work is taking place is on the Styal Loop, and does not affect lines to Ashburys and Stockport? If so, 'Ardwick Blockade' is not the right terminology to use!
Could someone please clarify what is going on before speculation starts to run riot?! Thank you.
Moderator note: this is for timetable updates (not speculation); there is also a parallel thread for infrastructure updates (also not for speculation):
Piccadilly corridor renewal - February 2026 (infrastructure updates)
https://www.networkrail.co.uk/our-work/our-routes/north-west/piccadilly-corridor-renewal/ In February 2026, we’re investing £7.9m to improve tracks, points and signalling systems on the southern approach to Manchester Piccadilly station – delivering better, more reliable journeys for...
If anyone wants to speculate, please create a new thread
Last edited by a moderator: