Network Rail published last month a detailed report on the congested parts of the ECML as a result of the new timetable.
The study focussed on three specific corridors: from Huntingdon North Junction to New England North Junction (Peterborough); from Northallerton Longlands Junction to King Edward Bridge South Junction (Newcastle) and from Doncaster Marshgate Junction to Copley Hill West Junction (Leeds).
The additional difficulties around Peterborough appear to arise from the increased freight use of the Peterborough yards north of the station on the Up side and the corresponding increase in the ladder junctions.
The study focussed on three specific corridors: from Huntingdon North Junction to New England North Junction (Peterborough); from Northallerton Longlands Junction to King Edward Bridge South Junction (Newcastle) and from Doncaster Marshgate Junction to Copley Hill West Junction (Leeds).
The additional difficulties around Peterborough appear to arise from the increased freight use of the Peterborough yards north of the station on the Up side and the corresponding increase in the ladder junctions.
Huntingdon North Jn to New England North Jn
• Options for diverting services from the area to relieve congestion are limited either by gauge or limited capacity on alternative routes.
• A consequence of the implementation of the W10 Strategic Freight Network is to concentrate gauge constrained services into the Peterborough area.
• The development of the Freight facilities on the up side at Peterborough in recent years creates a requirement for capacity use that was not part of the assumption set when the additional access rights were approved in 2016; paths to access the yards were contained in the original specification for the ESG that developed the Dec-25 timetable structure.
• The structure of the Dec-25 ECML passenger service does not naturally contain capacity for services using the two ladder junctions at Peterborough, options for adjusting the passenger service are very limited.
• Whilst four tracking south of Peterborough creates additional capacity it does not directly alleviate the congested infrastructure as this capacity can only be released as part of a wider recast over a much larger geographical area.
• The application of multiple timetable planning rules sets in the Peterborough area minimises congestion but only as a trade off against timetable performance.
• Infrastructure interventions to deconflict movements on the core ECML from movements crossing the ECML at Peterborough are unlikely to be feasible
Northallerton Longlands Jn to King Edward Bridge South Jn
• The mix of services and stopping patterns on this section, complicated by the directionally inconsistent nature of the timetable and passenger service intervals (resulting from the service specification), leads to inefficient capacity usage.
• The configuration and location of loops (including entry and exit speeds) is not compatible with the requirements of longer and higher speed freight services
• A proposition exists to create a gauge cleared alternative route between Northallerton and Ferryhill (including enhancements in the Newcastle area) however this is not funded; it is also unclear as to whether this option would be commercially effective for freight operators.
• A re-opened Leamside line offers the possibility of decongesting the route north of Tursdale Junction, however capacity and operational considerations between Pelaw and Newcastle East Jn reduce its feasibility.
• Electrically hauled freight offers capacity benefits taken either as improved journey time or greater trailing load, additional paths can be found. The implication on Traction Power would need to be considered.
• There is potential that a revision to the passenger service specification on this section of line could alleviate congestion.
Doncaster Marshgate Jn to Copley Hill West Jn
• This is a heavily used mixed traffic section of line, trains operate with a very wide range of service speeds on the two routes (which converge half way along its length); this reduces the effective capacity of the section.
• The route has been provided with W10 gauge clearance as part of the Strategic Freight Network, there are no gauge cleared alternative routes to the terminals served.
• Some potential options exist for interventions to allow W10 freight services to be diverted from this route
• The grade separation of South Kirkby Jn could alleviate some congestion on this route by removing the conflict between southbound services towards Sheffield and Northbound services towards Wakefield
• Whilst the operation of electrically hauled freight trains (subject to sufficient traction power) is beneficial in terms of running time, the structure of the Dec-25 timetable does not easily allow these benefits to be converted into additional paths.
• There is potential that a revision to the passenger service specification on this section of line would alleviate congestion.