I live in Brixton and have always been frustrated that there’s no stop here on either the Overground (South London line) or Southeastern’s Victoria–Dartford via Lewisham route.
I know the South London line tracks are high and curved, and building anything over the main road or on top of the existing Southeastern platforms (Victoria–Orpington) would be very difficult. But there is a practical option:
The land is currently light industrial/scrapyard/arches, so redevelopment is realistic.
Service pattern (if built):
In the longer term, I’d love to see a 4 tph Overground Clapham Junction–Lewisham service, though I know that would need resignalling to avoid conflicting moves at Peckham Rye.
I would not propose that Fast services on the Chatham Mainline or Semi-fast services via Denmark hill to Gillingham would call here, same as they don't call now.
Overall, I think this would be heavily used, provide lots of direct new journey opportunities, and create a very useful interchange between the Victoria line, Southeastern, and the Overground.
What do people think—feasible or a fantasy?
I know the South London line tracks are high and curved, and building anything over the main road or on top of the existing Southeastern platforms (Victoria–Orpington) would be very difficult. But there is a practical option:
- Build four new platformson relatively low viaducts behind M&S:
- 2 on the South London line (Overground)
- 2 relocated platforms on the Chatham Main Line (Victoria–Orpington)
- The site could use the lane between M&S and Superdrug (Dorrell Place), with the station footprint sitting on Nursery Road.
- This would allow a central interchange (similar to Peckham Rye), and potentially even an escalator connection down to the Victoria line (which runs directly beneath at that point, near the opposite end of the existing escalators for good passenger flow).
The land is currently light industrial/scrapyard/arches, so redevelopment is realistic.
Service pattern (if built):
- 4 tph Overground to Clapham Junction
- 4 tph Overground to Canada Water and beyond (avoiding Zone 1)
- 4 tph Southeastern to Bromley South / Orpington (relocated platforms)
- 2 tph Southeastern to Lewisham, Blackheath, Dartford
- 6 tph Southeastern to Victoria only (2 more than current, however less useful given the Victoria line)
In the longer term, I’d love to see a 4 tph Overground Clapham Junction–Lewisham service, though I know that would need resignalling to avoid conflicting moves at Peckham Rye.
I would not propose that Fast services on the Chatham Mainline or Semi-fast services via Denmark hill to Gillingham would call here, same as they don't call now.
Overall, I think this would be heavily used, provide lots of direct new journey opportunities, and create a very useful interchange between the Victoria line, Southeastern, and the Overground.
What do people think—feasible or a fantasy?