I think that's the point - if the report says the signaller at Selby sent Obstruction Danger to York and Doncaster then there must have been no other boxes on the old alignment besides these three, all of which must have stayed open to control other routes.If the incident was at Riccal then that would surely be on the old alignment now the A19.
Were there any boxes at Hambleton, Barlow, Sherburn, Selby Canal or Temple Hirst?
I know that Gas Wood got a new panel to cover an extended area.
Colton, Hambleton and Templehirst were all initially controlled from York Box before they transferred to the IECCNew interlockings were provided for the diversion at Colton, Hambleton and Templehirst and they were recontrolled into York IECC when it took over around 1990. I couldn't say where they were controlled from before that.
The opening in 1983 was before VDU workstation signalling control technology had been implemented anywhere on BR. The first IECCs were introduced in 1989 at Liverpool St, York and Yoker. York South workstation took over the interlockings on the diversion; however, the BPSR (British Power Signalling Register - https://bpsr.org.uk/ ) states that the original 1983 free-wired remote interlockings were not replaced with SSI until 2006. Therefore, the IECC must have initially incorporated a relay interlocking interface for this area.Colton, Hambleton and Templehirst were all initially controlled from York Box before they transferred to the IECC
Yes it did, I was involved in implementing it.Therefore, the IECC must have initially incorporated a relay interlocking interface for this area.