A reversing train service is almost as annoying as a bus service that loops round.
My idea is really about giving people local connections Wantage - Didcot, Witney - Oxford, Cowley - Wallingford etc So while people would be welcome to use it for more long distance Wantage - Eynsham etc they would just have to like it or lump it for the reversing.
Then bite the bullet and buy land.
Have a new line south of Didcot, on a grade separated junction, that heads up to Harwell, weaves somehow through/around Grove/Wantage, snakes up to Faringdon, up to Carterton, Witney Parkway, Eynsham Parkway, and down to Yarnton before heading into Oxford on existing lines.
When I came up with my idea I did think of saying about putting a triangle junction at the king Alfred roundabout and building a branch to Harwell but I feel it is more urgent to re-open old lines that could potentially be lost forever - like central Witney for example - or new lines where there is really only one place you can place a track Grove - Wantage however what I would do is identify where a possible line could go in the future and leave a corridor clear and to stop any future Nimby'ism the developers would have to tell the house buyers that one day you could have a railway next door and it is also in black and white in the house deeds so if the house is sold on in the meantime then the new owner's cant say we did'nt know.
Also if you let a developer build in one field they then want the field next door to that and the next one to that and so on and so on. So the reason I suggested about building at Eynsham is you have already houses built in the north and the railway in the south acting as barriers to urban sprawl. The problem of building a line like you suggest is most of it would go through unspoilt countryside and would cost hundreds of millions so while you could get developers to stump up a sizeable amount of cash to help pay for it they are going to want to build thousands of houses to get their money back.
Really instead of asking "where do we put all these houses to cater for an exploding population?" we should really be asking "why is the population exploding?" but that is a too awkward and enbarrassing question for any political party except Reform.
Waitrose is already built. Cash is only stumped up at the point of development, and in this case not even a few percent of what you need.
It seems to me that when it comes to railway projects it is not one entity (government usually) providing all the money out of one pot, instead it's lots of entity's (government, councils, local enterprise, regional development funds etc) providing money out of lots of different pots.
So lets say for arguments sake it costs £50 million to re-open the Abingdon branch, you get the various entity's to put in a share until you have a total of £45 million you then go to Waitrose and say "To get this railway built you need to put in £5 million" Waitrose, then have a simple choice they either "loan" the £5 million because they will get it back through the tills and after they do it is pure profit, look good to the people of Abingdon as they have helped bring back the railway and Waitrose are very keen on "green issues" so it looks good from a corporate point of view.
Or
They say "No", keep their £5 million but lose their future extra profits, look bad to the residents because they stopped them getting there railway back which might mean some boycott them and look like hypocrites about being green.
And I reckon they would most likely choose the former
If connections to the mainline network are unfeasible due to money, capacity or a number of other things then a lot of the medium sized towns orbiting Oxford seem like a good candidate for a tram-train/stadtbahn style solution - especially considering Oxford station is capacity constrained and located away from the tourist areas of the city. Tram-trains/stadtbahns can run on the main roads through the touristy centre then on regular railways / light rail lines to Abingdon, Witney, Kidlington etc.
It provides the 'rail' effect (i.e. a number of people see themselves above taking a bus but are fine taking a train/tram - hence why London/Kent's 'trackless tram' electric buses have been successful) which allows for modal shift while also not clogging up 2-track mainlines with frequent local trains.
I'm not familiar with the stadbahn but I would say look at the second part of post #142 in this thread
https://www.railforums.co.uk/thread...n-and-aberystwyth-to-carmarthen-lines.247404/ to see why for re-opening or building a new line the only option should be heavy rail.
In 1997-99, I lived in the North of Abingdon and worked at the Oxford Science Park, near the football ground.
To get to work, I would sometimes drive and sometimes cycle. It was free to park at work, and the congestion was fine. I would take the bus if I wanted to go into the centre of Oxford, as parking was expensive and the traffic was awful. However, the buses would stop a lot, there were lots of speed bumps, and the buses would shake and rattle.
Google Maps says to do that commute tomorrow, to arrive at 9am would take 16 minutes by car, 27 minutes by bicycle and 54 minutes by bus. The 35 bus has 19 stops and takes 21 minutes to get to the Redbridge Park and Ride. Then theres a 15 minute wait for another bus to the Science Park.
If there was a station built in the Abindgon Waitrose car park, the door to door time would be about the same. Abingdon to Oxford would be quicker, but I'd have a 20 minute walk to the station, or 13 minutes with a walk and bus. A train ride would be smoother, but the frequency would be worse.
If I was still doing that commute, to discourage me from using my car, you could charge for the parking.
To get me to use a bus, a smoother ride without speed bumps, fewer stops and a more frequent service would help.
Even with the time to get my bicycle ready, cycle, lock it at work and have a shower, it would as fast as a journey by bus or train using 2-3 services.
It sounds like you are talking in the past tense but I have two questions for you:
Question 1 - If both the Abingdon and Cowley branches were open today and you were doing the same commute which form of transport would you most likely use:
A - Bike
B - Bus
C - Car
D - Train
Question 2 - If you were going in to Oxford itself which form of transport would you most likely use:
A - Bike
B - Bus
C - Train
Without wishing to rain on everyone's parade, did I miss something somewhere? Abingdon is not mentioned in the consultation document and the sort of things being discussed here strike me as far less likely and practicable than things that are actually being proposed. So it would look like, unless the promoters of this strategy do a big about turn, this is not on the cards any time before 2041.
It is indeed a wish list document; however my point was that the wishes it lists are at least reasonably well considered and not completely infeasible over the 15 years it covers. Unlike some of the suggestions here which seem wildly pie in the sky.
And the Rail Promoters group has been set up by Oxfordshire County Council, Oxford City Council and the Department for Transport - if they don't have the money, I don't know who does. If the government is serious about its growth plans, some of it will have to happen. (I readily accept that it's quite possible that the government may fail to deliver on its plans...)
I know this could just turn out to be a wish list fantasy land and this could be the first and last we ever hear about it but as 67018 says in post #4 says "I'd much rather they spent some money and effort into properly planning the necessary infrastructure rather than just making it up as we go along, which seems to be the usual approach. Do we really want to be sitting here in 2040 wondering why we are trying to run a world-class science and technology hub with an hourly 2-car DMU service? also it is refreshing to hear a plan that puts rail first and foremost rather than the usual plan "which is more buses to add to the congestion that is already there caused by the motorists who DONT want to use the bus or improve the roads which simply encourages more traffic" a thing I hear with depressing regularity on here on what is supposed to be a rail supporters/enthusiast forum.
Also this is not saying: 2We have done the studies, found the cash, got the materials and got the builders on stand by so you just need to tell us yes or no to go ahead2. It is a consultation on what you think of the ideas they have come up with but also it asks in question 23 of the survey:
Please use the box below to tell us any other thoughts or suggestions that you have about the future of rail in Oxfordshire, and how it can support communities, the environment and the economy:
And this thread may well have raised ideas and thoughts that the survey people might not have thought off for example using the Cholsey and Wallingford railway for morning and evening commuter services, re-opening the Abingdon branch or building a branch to Wantage.
Therefore I would suggest to everybody they fill in the survey with there own thoughts and ideas and see what happen's. You have to be quick though as the survey closes at 23.59 on Wednesday the 1st of October.