• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Transpennine Route Upgrade and Electrification updates

YorksLad12

Established Member
Joined
5 Feb 2020
Messages
2,718
Location
Leeds
No I don't think there was, there was no P7 either. I reckon they will and repaint the old signs eventually.
Yorkshire Live has posted some photos on their Facebook page (no link, sorry). Platform signage has been done in RA2 to point people to the new platforms, so I'd *assume* that the platform number signs are in RA2 as well. The old Metro co-branded signs still seem to be in place though.

(Edited to add a link to the photos.)
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Polarbear

Established Member
Joined
24 May 2008
Messages
1,922
Location
Birkenhead
Reading the comments on that Yorkshire Live post is not encouraging!

Facebook

Selected "highlights" include:

  • I'm sure all the business’ that have lost a lot of revenue over the last few weeks are buzzing about how different it doesn't look
  • Where they wasted all the cash
  • Same as it used to look
Being fair, there are also some more positive & constructive comments.
 
Last edited:

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,669
Reading the comments on that Yorkshire Live post is not encouraging
The complaints about them removing platforms just show there is ignorance (reasonable or otherwise) and Hopefully the work going on will quickly become apparent that it's a work in progress.
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,301
Location
South West London
Not sure if it's an issue with the diagrams on Traksy, but has Marsden P3 been disconnected from the Huddersfield end, effectively turning it into a Manchester-facing bay?
 

nr758123

Member
Joined
3 Jun 2014
Messages
646
Location
West Yorkshire
Not sure if it's an issue with the diagrams on Traksy, but has Marsden P3 been disconnected from the Huddersfield end, effectively turning it into a Manchester-facing bay?
That would render it useless, as platform 3 is not capable of being accessed from the Manchester direction.

== Doublepost prevention - post automatically merged: ==

Reading the comments on that Yorkshire Live post is not encouraging!
No-one is going to become knowledgeable from reading Yorkshire Live aka the Huddersfield Daily Examiner.
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,892
Not sure if it's an issue with the diagrams on Traksy, but has Marsden P3 been disconnected from the Huddersfield end, effectively turning it into a Manchester-facing bay?
It's definitely still connected at both ends! There is a crossover missing at Huddersfield East too but I'm sure the traksy bods will get it updated.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,495
Not sure if it's an issue with the diagrams on Traksy, but has Marsden P3 been disconnected from the Huddersfield end, effectively turning it into a Manchester-facing bay?
OTT has the correct layout (as does Freightmaster! ;) )



MARK
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,593
Not sure if it's an issue with the diagrams on Traksy, but has Marsden P3 been disconnected from the Huddersfield end, effectively turning it into a Manchester-facing bay?
I didn't have much time to work on it today, and don't have an actual map of the signals to work from, so I just followed a few trains through and crammed in all the signals on the main running route in roughly the right places.

Once I've got a bit more idea of what's actually on the ground and a bit of time to reshape the map a bit I will do a better job of it.
 

Freightmaster

Verified Rep
Joined
7 Jul 2009
Messages
4,495
I just followed a few trains through and crammed in all the signals on the main running route in roughly the right places.
Hey! stop stealing my patented map updating methods. :lol:


Once I've got a bit more idea of what's actually on the ground and a bit of time to reshape the map a bit I will do a better job of it.

Feel free to PM if you want help with anything - I'm happy to share what I have worked out...




MARK
 

_toommm_

Established Member
Joined
8 Jul 2017
Messages
6,301
Location
South West London
I didn't have much time to work on it today, and don't have an actual map of the signals to work from, so I just followed a few trains through and crammed in all the signals on the main running route in roughly the right places.

Once I've got a bit more idea of what's actually on the ground and a bit of time to reshape the map a bit I will do a better job of it.

Fair enough :D Traksy was my first point of reference with the upgrade works with me not wanting to wait for the Sectional Appendix to download on the train I was on.
 

takno

Verified Rep - Traksy
Joined
9 Jul 2016
Messages
6,593
Fair enough :D Traksy was my first point of reference with the upgrade works with me not wanting to wait for the Sectional Appendix to download on the train I was on.
The correct layout just came to me, so I've done some further updates to the map now. Should hopefully be up to date
 

neil65

Member
Joined
15 Jul 2022
Messages
537
Location
Huddersfield, Kirklees, United Kingdom
I went down to the reopened Huddersfield station today, Tuesday 30th September, it reopened yesterday, to see all the work that has been done on the platform extensions over the new bridges over John William st for Platforms 1-3
There is also a 4 minute phone cam video taken through the window of a TPE 185 of the journey from Huddersfield to Heaton Lodge Jct showing the new bridges at Huddersfield, the new carriage sidings at Hillhouse, what was Deighton station showing embankment strengthening the new bridge over Leeds Rd, Wheatleys Bridge & 2 others
The view of a working station again with 150007 & TPE Class 185's
showing the length of the new P1 with a 3 car 150 in it, you could fit a 6 car one there!!
Lack of orange army!!
What i imagine is the base for the new footbridgre/Lifts to be built
Just how wide is that!!
185134 departing from Huddersfield with a service for Scarborough passing the gap between P3 and the new bridge extension
Close up of the missing link!!
View of John William Street from the new Platform 2 extension

On to Mirfield

66780 The Cemex Express passing the platform that will be removed at Mirfield eventually
Class 150 Prototype 150001 arrives at Mirfield station construction on the footbridge & lift continues behind it
What will be P1 on the slow lines at Mirfield station eventually
The new footbridge & lifts at Mirfield. This platform will be removed and a larger car park will be extended up to the lifts

Neil
 

Charlie978

Member
Joined
31 Jul 2025
Messages
68
Location
Chesterfield
The temporary width of p3 at Huddersfield is causing some issues this evening, certainly overcrowded near the underpass. Eyeballing the width while stood on it and it can’t be more than 2m wide (to the yellow line). Hope they are at work behind the boards on the other face of the island and it can be slightly expanded before the next big closure.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,213
The temporary width of p3 at Huddersfield is causing some issues this evening, certainly overcrowded near the underpass. Eyeballing the width while stood on it and it can’t be more than 2m wide (to the yellow line). Hope they are at work behind the boards on the other face of the island and it can be slightly expanded before the next big closure.
Width of the platform is a min 2.5m. Needs a lot of platform management. People are just a bit lazy and always congregate at the top of the stairs
 

Andyh82

Established Member
Joined
19 May 2014
Messages
4,590
Why have they made Platform 1 so long, surely even if there were loads of improvements it’d never see more than 4 cars

Unless they are future proofing the concept of two trains stacking on top of each other, as per Platform 17 in Leeds
 

1D53

Established Member
Joined
2 Apr 2006
Messages
2,892
Future proofing. The previous platform was only big enough for a 3 car 150 which aren't long for this world. It's now 102m so can happily accommodate 4x24m vehicles in future, such as 2x2 car 195s.
 

YorkshireBear

Established Member
Joined
23 Jul 2010
Messages
9,669
With all the work at Huddersfield this was going to lock in that platform length forever so made sense to extend it now. Sensible forward thinking.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,327
Location
milton keynes
Why have they made Platform 1 so long, surely even if there were loads of improvements it’d never see more than 4 cars

Unless they are future proofing the concept of two trains stacking on top of each other, as per Platform 17 in Leeds
4 car would actually require 100m.. so it's spot on. Also, when Huddersfield are playing one of the Barnsley or Sheffield teams, they have run extras (via Wakefield K + Moorthorpe), and if they have strengthened the regular they will have had to use (the old) platform 4 - this now makes handling those events easier.
 

Charlie978

Member
Joined
31 Jul 2025
Messages
68
Location
Chesterfield
Why have they made Platform 1 so long, surely even if there were loads of improvements it’d never see more than 4 cars

Unless they are future proofing the concept of two trains stacking on top of each other, as per Platform 17 in Leeds
Not sure on the track layout, but could this be used as a Manchester facing bay in the part of the hour when not occupied by Penistone line trains, it could fit a 4 car 331. I’m thinking of peak extras on the Piccadilly stopper, so they don’t have to occupy a through line or run through to Leeds as is the current arrangement.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,139
Network Rail media release about the next phase of the TRU project between Dewsbury and York: Transpennine Route Upgrade prepares for major upgrades between Dewsbury and York https://share.google/EIi2TCx5yNNblAfND
Lists the forthcoming diversions and blockades and the work which is to be carried out between now and Christmas.
 

fishwomp

Established Member
Joined
5 Jan 2020
Messages
1,327
Location
milton keynes
Not sure on the track layout, but could this be used as a Manchester facing bay in the part of the hour when not occupied by Penistone line trains, ...
No. The only route into the platform currently is from the Penistone line - so you'd need to come into Huddersfield and shunt. There is a big constraint here to prevent making many changes: Springwood cutting and (two bore) tunnels each side of that cutting on the approach to Huddersfield - you can't go from up to down lines anywhere near the station throat. Theoretically installing a crossover in the cutting could connect up for you but I've not seen any proposal to do that and it smells unlikely - the new Huddersfield station will have more capacity and not need this.
 

Top