It basically follows the debates that we have had on the Forums, acknowledging the political and financial issues but ultimately concluding by looking to the big long-term picture (as I would see it, don't flog off your key national assets because you become a slave to fortune and those who have different objectives, bit late now I know post-Maggie!). It is their take.Can you provide a bit more detail for those who don't have it - editorial? or an organization's view?
This is one of the most commonly raised threads here (along with GatEx->Southern) - and most agree that in theory it should, but
several political and financial reasons for why not...
I believe that the Elizabeth Line was designed for a possible increase to 30tph (every 2 minutes) in the future. So i do not see why it would not be possible. There is a bit of freight on the GWML but i am sure they could find a workaround for them to use the fast lines or operate at night instead.Ok cool... the tricky operational part is that they are fast paths. If they were on the slows, it all goes to Crossrail services extended from OOC - and maybe some stopping patterns are tweaked to accommodate more.
If 4 fast paths are released - can more slows get to LHR in replacement? Likely not although maybe 2tph. So what else? Kill T4 services and make them a shuttle?
And then what are the 4tph? It would likely be the end of fast to Slough/Maidenhead services. Who might then ironically want more Crossrail semi-fasts!
So it's 4tph fast to Reading - and I'm not sure where those go. Maybe Bristol via Parkway. Maybe a second to Devon (Paignton?) and speed up the Cornwall? Or Basingstoke + Newbury extras? Not sure what else works.
Interesting to see the current issue of Modern Railways saying that this should be canned.
One issue at Heathrow is that the T4 branch is single track. Ideally they should double track that branch. If they made it double track then you could get 12tph EL to T123 with an even 6tph EL continuing to T4 and 6tph EL continuing to T5.
Although it is still possible to do 12tph EL to T123 at the moment with 4tph EL continuing to T4 and 8tph EL continuing to T5. You are just replacing the 4tph HX paths with EL services. Of course once you get to the GWML these paths would now use the slow lines instead of the fast lines.
The latest thread before this one on the subject, if I remember correctly, came to the consensus that
- Those paths are basically useless for the EL
- HAA (Heathrow Airport Authority), being the owner, is very unlikely that they will accept to surrender that cash cow and image cow easily
Heathrow Express use continuing to decline
Define scam. Are people not getting what they paid for? I think I would feel more comfortable if travellers arriving at Heathrow had easily accessible, comprehensive and unbiased information about the public transport alternatives for getting into Central London. But when you hear HEX...www.railforums.co.uk
From memory, the paths are basically useless for anything else full stop. Again from memory, there isn't the room for them west of Airport Junction.- Those paths are basically useless for the EL
- HAA (Heathrow Airport Authority), being the owner, is very unlikely that they will accept to surrender that cash cow and image cow easily
If HEX does survive until the first leg of HS2 is open I kinda imagined that it should do very well at Old Oak Common. Imagine luggage toting outbound air passengers decanting from HS2. Would they want to wedge themselves into already well-loaded stopping Elizabeth Line service to Heathrow with no proper luggage space? Or would they like to board a roomy, ‘nearly empty’ fast HEX for the last leg?
If they brought in through ticketing at a sensible price, they definitely would complement each other very well. But that's a big if. Tickets to Heathrow Rail are already usually more expensive than splitting at whichever London Terminal you arrive at.Obviously a lot will depend on things like pricing and publicity but the two services could potentially complement each other very effectively.
There has to be a fair amount of tourists that get swindled by HX salesperson scattered like every 100m on the way to the various stations at the airport. In the other direction, I am less sure.Is it still a cash cow? It seems to be nearly empty whenever I see it.
HAA is a private company, so we probably never will get real data about ridership. And I wouldn't be surprised if it was more of a question of image than actual rentability.

Thank you very much, so yeah maybe by 2027-28 when renewal will be on the table the outlook will be different. But bearing in mind what that service is, I would say it's still healthily used and probably makes some money (but again, I wonder how much of HX is image).ORR is your friend... https://dataportal.orr.gov.uk/statistics/usage/passenger-rail-usage/
A gradual reduction in usage is seen post-covid. A bit tricky to translate into revenue but I would guess they're getting around £80m per year judging from the value (if that's the right term) of their advance/single/return fares.
View attachment 189279
Plus the loss of the service would make it harder for some to travel to the airport for work, as it's free on weekends and after 1800, 50% off at every other time for Heathrow employees
So about 1/3rd down on its peak yearORR is your friend... https://dataportal.orr.gov.uk/statistics/usage/passenger-rail-usage/
A gradual reduction in usage is seen post-covid. A bit tricky to translate into revenue but I would guess they're getting around £80m per year judging from the value (if that's the right term) of their advance/single/return fares.
View attachment 189279
If you ignore the trend of the graphThank you very much, so yeah maybe by 2027-28 when renewal will be on the table the outlook will be different.
If needs be this perk could be transferred to the EL.Plus the loss of the service would make it harder for some to travel to the airport for work, as it's free on weekends and after 1800, 50% off at every other time for Heathrow employees
All fair points yesSo about 1/3rd down on its peak year
PS That's quite a lot
== Doublepost prevention - post automatically merged: ==
If you ignore the trend of the graph
== Doublepost prevention - post automatically merged: ==
If needs be this perk could be transferred to the EL.
It wouldn't be physically harder, just financially. Presumably Heathrow Airport could just pay their staff more?
But it's hardly a compelling reason to keep HEX. It's like justifying keeping first class on an "Inter city" service so that the staff can use it as a messroom to jibber jabber.
Is this still true?From memory, the paths are basically useless for anything else full stop. Again from memory, there isn't the room for them west of Airport Junction.
That's pretty much the case. A 110 path requires an extra 2.5min to Dolphin Jn compared with an IET - upgrading Dolphin might make 1min difference but not enough to create a path.From memory, the paths are basically useless for anything else full stop. Again from memory, there isn't the room for them west of Airport Junction.
Longer term, they should close T4. And build out the other platforms at T5 so that there are four to turn trains (until some future onward purpose)
Regardless of the third runway (R3) they would be best off completing T2, and then rebuilding T3 and expanding it west, plus T5D stand - which gives that continuous 'toast rack' layout.
Even if the paths couldn't be repurposed, which in the medium term they clearly could, eliminating the HEx paths would provide some useful slack in the system around Paddington.That's pretty much the case. A 110 path requires an extra 2.5min to Dolphin Jn compared with an IET - upgrading Dolphin might make 1min difference but not enough to create a path.