Mike_L_Surrey
Member
I also noticed the higher trailing load of 800 tonnes. It also shows the planned max speed is only 27mph instead of yesterdays 75mph.This one shows pathed as trailing load 800 tonnes
The cancelled one yesterday was trailing load 400 tonnes
Does that mean they are moving 2 units ?
However, the timings are identical so I doubt it really will be 27mph. I live close to Surbiton, so I’ll try to see it later today if it actually runs and how many units are included .