Is it possible for a mixed gauge train to operate on dual gauge tracks? If so has this ever happened before?
What i mean is a train where some carriages or wagons are on standard gauge bogies and other carriages or wagons are on broad gauge bogies but they are all coupled together. Or a double headed locomotive with one being standard gauge and one being broad gauge. Or a locomotive on standard gauge pulling carriages on broad gauge bogies or a locomotive on broad gauge pulling carriages on standard gauge bogies. Or even standard gauge and broad gauge multiple units coupled. So just basically any train which has a mixture of carriages or locomotives or freight wagons on two different gauge bogies but coupled and running in the same formation.
There are sections of cross border track where this is technically possible. For example on, Terespol (PL) to Brest (BY), Narva (EE) to Ivangorod (RU), Haparanda (SE) to Tornio (FI), plenty of other border crossings on the ex USSR border, possibly some on the France and Spain border, and probably many others around the world. These all have dual gauge tracks.
I am just curious whether this has ever been done before? Or if not then what prevents it if the track is dual gauge?
What i mean is a train where some carriages or wagons are on standard gauge bogies and other carriages or wagons are on broad gauge bogies but they are all coupled together. Or a double headed locomotive with one being standard gauge and one being broad gauge. Or a locomotive on standard gauge pulling carriages on broad gauge bogies or a locomotive on broad gauge pulling carriages on standard gauge bogies. Or even standard gauge and broad gauge multiple units coupled. So just basically any train which has a mixture of carriages or locomotives or freight wagons on two different gauge bogies but coupled and running in the same formation.
There are sections of cross border track where this is technically possible. For example on, Terespol (PL) to Brest (BY), Narva (EE) to Ivangorod (RU), Haparanda (SE) to Tornio (FI), plenty of other border crossings on the ex USSR border, possibly some on the France and Spain border, and probably many others around the world. These all have dual gauge tracks.
I am just curious whether this has ever been done before? Or if not then what prevents it if the track is dual gauge?
