And overcrowding is a serious issue on these services south of Preston.It would, but Northern are perennially short of DMUs. The planned BEMUs would solve the issue, but those are realistically well over 5 years off by the time they are ordered, built and in service.
Extra EMUs are quite easy to obtain at the moment, and switching a DMU out from a mainline Northern route where performance is a serious concern will help one of Northern's major issues.EMUs aren't exactly plentiful either. Even now a 150 or 156 occasionally shows up on an EMU diagram (usually the peak time only Wigan North Western - Manchester via Eccles).
Exactly, although the 350/2s are 110mph capable, which would help on the Preston - Lancaster WCML section (possibly balanced by acceleration improvements significantly shortening timings Chorley - Preston and Bolton - Chorley).There's nine off-lease 323s too, which would be an even simpler fix without needing maintenance staff or crew training.
If you could path that with looping at certain points, it would be a great addition to the WCML and enable Avanti to release a bit of capacity on the WCML intercity services (if Northern used Advances to entice most local/regional customers, like they usually do).Alternatively the EMU could be a Manchester-Carlisle service (for DMU connections to both Barrow and Windermere) which could allow the TPE Scotland service to be sped up? No idea if that could be pathed, though.
Then keep one DMU on the Windermere branch and a few on the Cumbrian coast. I think Barrow would moan about the loss of the through train, so you'd need good connections at Lancaster, but you could sell it as a temporary break while Northern waits for their battery train delivery.