Mattplans
Member
It doesn't shock me whatsoever that the dlr's rudimentary displays are unable to handle NIS trains and are instead describing trains being tested as in passenger service
Indeed internally, the target is 30 Sep. 201, 203, 209 are out on test so far.TfL has previously said in their meetings that the trains are scheduled to enter service in September.
Haven't we had nearly 3 years since first delivery, and countless weekends of disruption, to do "testing on other routes"?I assume they will be testing on other routes over the next few weeks. Beckton - Stratford Int seems to be the main route for now.
What I meant was testing with other traffic, like what is being done now.Haven't we had nearly 3 years since first delivery, and countless weekends of disruption, to do "testing on other routes"?
Odd that they want to launch it on a Tuesday, why not a Monday?Indeed internally, the target is 30 Sep. 201, 203, 209 are out on test so far.
I assume they will be testing on other routes over the next few weeks. Beckton - Stratford Int seems to be the main route for now.
Looks like they just selected the last day of September.Odd that they want to launch it on a Tuesday, why not a Monday?
Trains out testing will probably be de-wrapped, seat/pole/floor covers removed, deep cleaned etc between the end of testing and entry in to serviceLooks like they just selected the last day of September.
Trains out testing will probably be de-wrapped, seat/pole/floor covers removed, deep cleaned etc between the end of testing and entry in to serviceOdd that they want to launch it on a Tuesday, why not a Monday?
I've seen a photo on Twitter of 211 running today, so that's at least four of them now.201, 203, 209 are out on test so far.
Not unusual. The first 701 was a Tuesday. Quieter than Monday, and also gives a whole day to prep the unit before entering service.Odd that they want to launch it on a Tuesday, why not a Monday?
Although on DLR Mondays are much quieter than Tuesdays because of many more people working from home on Mondays.Not unusual. The first 701 was a Tuesday. Quieter than Monday, and also gives a whole day to prep the unit before entering service.
It's possible that the livery is under a rustproofing guarantee, and won't change unless and until that guarantee expires. I can't imagine any internal refit would be on the cards, it seems like an unnecessary expense.Once the existing DLR Bombadier B07 Stock runs alongside the new CAF B23 stock, will the latter receive the new aqua and white livery? Will they retain their existing interiors or be modified with an internal layout more akin to the B23s?
I did notice on a trip to Custom House for work this week that they perhaps appeared to be taking advantage of the situation with a number of units out on test. At one point on the Beckton branch, the new units were almost more regular than the B92s.Indeed internally, the target is 30 Sep. 201, 203, 209 are out on test so far.
...more 2010s train design trend after its aged 10 years and been cut back to suit! Still remember all the nonsense about the New Tube for London I think about a decade ago...I like the front end design, but it kinda gives me that 2020s train design trend with the light strips around the front (like on the new Picc trains and the new Glasgow Subway trains), just without the lights. Since it doesn't really run in much tunnel I get why, though. Still though, love it.
I want to assume (not sure for definite) that they wanted to mimic how it would be like in live service before it's official debut. Perhaps the not in service sign could have been displayed to ensure passengers don't try and open the doorsMore than a little dissatisfaction and incomprehension on station platforms with the train describers showing the test trains with normal destinations, especially as they stop at all stations, and a few waiting passengers go up to it and stab at the unyielding door buttons. Then it just sets off.
How on earth this passed any Health & safety review is not quite clear. Nor why the "Not in Service" indication otherwise used cannot be shown.
The information on the Information Displays is fed from the Train Ident on the signalling system. As far as the system is concerned the train is going to Beckton.More than a little dissatisfaction and incomprehension on station platforms with the train describers showing the test trains with normal destinations, especially as they stop at all stations, and a few waiting passengers go up to it and stab at the unyielding door buttons. Then it just sets off.
How on earth this passed any Health & safety review is not quite clear. Nor why the "Not in Service" indication otherwise used cannot be shown.
At Stratford I've seen scrolling messages pointing out that trains shown as going to Beckton are not in service / are test trains.More than a little dissatisfaction and incomprehension on station platforms with the train describers showing the test trains with normal destinations, especially as they stop at all stations, and a few waiting passengers go up to it and stab at the unyielding door buttons. Then it just sets off.
How on earth this passed any Health & safety review is not quite clear. Nor why the "Not in Service" indication otherwise used cannot be shown.
Empty trains may display "Await Announcements" on the Platform Displays, but they will change if a destination for the train has been assigned. Trains that run non-stop, from a terminal for example, are not assigned a destination. The Destination Displays on the B23 are set to "Not in Service" before leaving the depot.But there are no announcements. And every empty train on the system has previously been quite able to have displayed Not In Service.
If they really want to mimic live service the train operator would be down the train, checking clear and opening doors from there. I wonder how they are mimicing departure from Bank, where departure from the front control position was banned after a silly trap & drag incident.
I think the simple answer to that is there are no B23 "ghost" services into and out of Bank. I've said before that I think there's too much chance of disruption to real services if they did. It appears that the B23 stock are just taking the paths of the currently cancelled Beckton to Stratford International services, the purpose being just to confirm that the B23 and earlier stock can run somewhere on the system simultaneously and therefore should be able to operate anywhere on the system simultaneously. Well, that's my theory anyway!But there are no announcements. And every empty train on the system has previously been quite able to have displayed Not In Service.
If they really want to mimic live service the train operator would be down the train, checking clear and opening doors from there. I wonder how they are mimicing departure from Bank, where departure from the front control position was banned after a silly trap & drag incident.