I've noticed that every time I've taken a 399 from Parkgate they never seem to go beyond 50mph, considering there being a 55mph speed limit between Parkgate and Rotherham. I'm not from around Sheffield so I'm not all too familiar with how their system works, but is there a reason they don't go to full line speed despite having a top speed of 60?
I'd assume it would be the 5mph doesn't make that much a difference in the timetable, but any intel would be appreciated
I'd assume it would be the 5mph doesn't make that much a difference in the timetable, but any intel would be appreciated