Wallingford has a population of about 12,000 and could be re-connected to the national rail network relatively easily. If electrified, one of the 2tph from London currently terminating at Didcot could be diverted to serve it.
12,000 is nowhere near enough to justify reconnection to the National Rail network, especially as Wallingford has lots of local employment through the peripheral industrial estates and military base, so there's not a particularly strong commuter base either.
Once Didcot to Oxford is electrified, the 2tph from Didcot will be extended through to Oxford (as it used to be a London to Oxford service when operated by Thames Turbos, and traffic patterns make that arrangement much more sensible in terms of passenger flows).
Re-opening the Abingdon branch would be more challenging, and historically the junction with the main line faced in the wrong direction away from London. There are no obvious rail services to be re-routed to serve it. Bus services are more than adequate for relatively short journeys from Abingdon to Oxford, and have the advantage over rail of serving the city centre.
Most commuting from Abingdon is heading towards Oxford/Harwell, not London. The Abingdon branch's alignment is mainly intact, and you would only need a basic unmanned single platform station to deliver a decent frequency into Oxford.
The obvious service to reroute into Abingdon is the Banbury shuttle, but in the meantime before that is split again, East West Rail or London to Oxford Chiltern services are both options for extension.
Bus services do not attract enough people to adequately serve the 40-50k in the Abingdon area who often wish to travel into Oxford for work or leisure, because the congestion has reached saturation levels on the A34 and surrounding roads, with no reasonable prospect of extra road capacity being provided.
I don't understand the desire to open a station at Grove to function as a Wantage Parkway. Surely Didcot is more than adequate for this purpose? The Swindon-Didcot section of the GW main line is best kept clear of intermediate stations to provide maximum capacity for express trains.
There's a lot of demand for local travel to Oxford/Didcot and the large employment centres at Harwell/Milton Park.
This is not adequately served by local bus services and the roads (as another forum member has mentioned) are low quality and unlikely to be upgraded (due to their location bordering a protected National Landscape).
You wouldn't do that at all. Thats a waste of a Didcot path.
Precisely.
You have a battery train shuttling from Wallingford into the back heritage platform at Cholsey.
It's possible, but would it be feasible economically? It's a 25mph line with low projected traffic and a population of max. 20k within 5 miles.
I'm now expecting someone with local knowledge to explain why this is a bonkers idea that could never happen!
Extending the Grove and Wantage lines towards the western edge of Steventon shouldn't be an issue.
I don't think that you would be able to extend through through Steventon itself without lots of compulsory purchase and new bridges to replace the problematic High St bridge, and the level crossings. Housing is in close proximity both sides and Steventon is not known to be cheap!
Largely agree, and the trackbed is mostly cycle path or unused. However, you end up with only the centre of Abingdon getting served - and Abingdon is a sprawling town, so you still end up with traffic.
You do, Abingdon residents wanting London would probably still prefer Didcot Parkway, but with buses from the estates rerouted to pass Abingdon station, I reckon you could feed in a significant amount of passengers (especially when Didcot-Oxford is finally electrified and the London to Didcot stoppers run through Radley for regional connections up the Thames Valley, to add onto the huge Oxford flows that Abingdon would provide.)
Given the railway can't do anything for less than £100m these days, how many years of a 10-minute daytime frequency bus connection to Radley station doing two or three routes would that fund..? That would be pretty handy.Bus services are more than adequate for relatively short journeys from Abingdon to Oxford, and have the advantage over rail of serving the city centre.
Not as many as you would think - the road to Radley isn't particularly high quality, and a bus journey from somewhere like the south side of Abingdon (the Caldecott area) would be as much as 15 mins, with peak traffic (especially school traffic) making the final section east of Twelve Acre/Audlett Drive unreliable.
Buses were adequate when traffic levels were lower and this region's population was lower, but with the saturated local road network and inadequacy of the bus network to reach several key destinations outside of Oxford city centre (e.g John Radcliffe Hospital is over an hour away by bus, but around 30 mins by car), it's no longer adequate.
I had not realised that the suggested site in Grove is actually next door to Williams F1. That seems like an excellent science justification to tie into the theme in the OxRail plan.
Add the tourist potential with Uffington White Horse and scenic sections of the Ridgeway being nearby, you could run a shuttle bus serving visitors to that area from a Grove/Wantage Parkway station for additional passengers. It's much closer than Swindon is.