to be fair, that must be one of the last places you would expect the wires to reach - if ever... Pragmatism rules - I don't think that really counts as surrender!Should but not necessarily is! For example, the replacement bridge over the railway at Workington docks was intended to be suitable for electric wires but, in the end, was built to a lower height to ease the rise on the dock access road.
That normally is the case if its new.Any over bridge or other structure crossing any line should be built to accommodate W10 clearance (W12 would be better) with clearance to include OHLE. This would make installation of future OHLE easier and cheaper.
The problem is that for road over rail bridges, raising the road means rebuilding a lot of road, and dropping the track means rebuilding a lot of railway. Rail over rail is potentially even worse. So even if you are rebuilidng the bridge, it can be difficult to get additional clearance. Sometimes you can buy a bit of clearance by using a different type of bridge with a thinner deck, but that isn't always practical either.Any over bridge or other structure crossing any line should be built to accommodate W10 clearance (W12 would be better) with clearance to include OHLE. This would make installation of future OHLE easier and cheaper.
That's what's called a "self fulfilling prophecy". What happened at Greek St in Stockport?that must be one of the last places you would expect the wires to reach - if ever...
Its wired anyway?That's what's called a "self fulfilling prophecy". What happened at Greek St in Stockport?
Wasn't that bit of railway in a tunnel before electrification? I thought it was opened out and the now-removed concrete girder bridge put across instead.That's what's called a "self fulfilling prophecy". What happened at Greek St in Stockport?