this is more focused on development of the Oxbridge Arc
Mentions of the arc remind me of a scene from Airplane II:
We'd better get to the arc
We have no arc, minister
No arc?
Just a corridor, minister
From the Cambridge end of the corridor the immediate priorities are water, houses and transport. Getting Bedford-Cambridge and Tempsford New Town built are key parts of that, as is the Chatteris reservoir.
I'm not expecting EWR to be much different from what was in the non-statutory consultation. Key outstanding questions are the Marston Vale stations (I'm expecting a variant of the consolidated stations option), powering the trains (I'm expecting discontinuous electrification and battery bimode trains) and what to do for Universal (I don't know enough to speculate). In particular I'm not expecting any through running EWR<->beyond Cambridge.
In this timescale I don't see electricity supply as a key constraint, except maybe the grid. We have lots of solar, wind and nuclear nearby.
Assuming that Bedford-Cambridge and Universal get built, my speculation on what would then become priorities include:
Expanding Cambridge eastwards, but staying within the M11/A11/A14 triangle, and new stations on a redoubled Newmarket line
The Gogs and the river valleys would be protected, especially the chalk streams
Hobsons Park extended all the way to Shepreth Branch Junction
Addenbrookes 3 especially a new A+E
A local transport strategy much more like what has recently been published by Oxfordshire County Council, not light rail and bus franchising rabbit holes
This would include Kings Cross-Ely stoppers and Liverpool Street-Newmarket stoppers forming a Cambridge Metro, with multimode ticketing
Lots of development in and around Bedford and Milton Keynes, especially for growing businesses spinning out from Cambridge or Oxford, but also the impact of Universal
At this stage we might get a north curve at Bletchley and continuous electrification on EWR