Just got an email from Network Rail stating that major work with lights and noise will happen in my area December 24th -27th involving replacing the contact wire and catenary. So basically Preston to Catterall area. I will also post photos during the work if possible.

Hello Graham,

Dear Neighbour,

Railway work near your home - Renewals at Preston

Network Rail is due to start work near your property, and we wanted to give you some additional information about the times we will be working and what the project will involve.
We are undertaking Overhead Line Electrification (OLE) renewals works on the rail infrastructure, the works will involve the removal and replacement of the Contact & Catenary wires with all associated in-span equipment. It will also help keep train services safe and reliable for passengers and train drivers.
To complete the work, we will be using our OLE Train, heavy plant machinery, site lighting and hand tools. We understand the inconvenience and disruption our work may cause. The type of equipment and machinery we use does mean some disturbance is unavoidable, but we will make every effort to minimise any unnecessary noise.
The work will take place on the following dates and times:-
• 24th December 2025 (20:00) until 27th December 2025 (10:00)
We work around the clock to keep the railway running smoothly for passengers and freight. Our work is often noisy, late at night and on weekends. The nature of the tasks means we can't prevent all noise, but our teams will try to minimise this as much as possible. We're sorry if we disturb you.
All staff and contractors are briefed on working responsibly in the local community. We expect staff to be considerate, polite, and courteous always and keep noise to a minimum where possible.

Yours sincerely,

Community Relations
If you have any questions, please feel free to contact us. You can reach our dedicated 24-hour National Helpline at 03457 11 41 41 or visit our website at https://www.networkrail.co.uk/communities/contact-us
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

nlogax

Established Member
Joined
29 May 2011
Messages
6,007
Location
Mostly Glasgow-ish. Mostly.
Just got an email from Network Rail (I will post extract later), stating that major work with lights and noise will happen in my area December 24th -27th involving replacing the contact wire and catenary. So basically Preston to Catterall area. I will also post photos during the work if possible.
NR obviously knew you'd be over here for Xmas!
 

RGM654

Member
Joined
19 Jul 2022
Messages
242
Location
Harrow
I note "It will also help keep train services safe and reliable for passengers and train drivers." Why "also"? Isn't that the main, if not only, reason for renewal?
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,604
Location
Hope Valley
I note "It will also help keep train services safe and reliable for passengers and train drivers." Why "also"? Isn't that the main, if not only, reason for renewal?
Ageing assets of any type usually need more frequent inspection and maintenance as they reach end of life. May be issues with availability of spare parts and so on.
Quite apart from the fact that they can be part of a steady programme of work; better than having to respond to failures.

It’s not just about reliability and safety.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
Also line past my house was wires strung etc mid/late 1973 with squadron electric service May 1974 so the kit is over 50 years old. So due for some Tender Loving Care aka TLC
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,590
Location
Nottingham
Also line past my house was wires strung etc mid/late 1973 with squadron electric service May 1974 so the kit is over 50 years old. So due for some Tender Loving Care aka TLC
The 1960s wiring on the southern WCML was replaced during the upgrade around the turn of the century, so after 35 to 40 years of service. The wiring north of Weaver Junction has therefore lasted longer, but has been subject to less electric traffic than further south.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
The 1960s wiring on the southern WCML was replaced during the upgrade around the turn of the century, so after 35 to 40 years of service. The wiring north of Weaver Junction has therefore lasted longer, but has been subject to less electric traffic than further south.
Indeed. Btw, I have a feeling they willl just do renewals even though a lot of AutoTransformer upgrade kit has already been installed.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,401
Location
Northampton

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,897
Location
Mold, Clwyd
I was under the impression that the WCML fast lines were rewired during WCRM (c2005), resulting in the current 125mph line speed and the tilt speed profile, Crewe-Carstairs.
So was anything north of Weaver Jn touched during WCRM?
There have been some upgrades between Crewe and Preston (50mph junctions etc).
It's obvious there are still power supply problems in places (eg Crewe-Weaver Jn).
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
So this will be my view of the works. As you can see from the second photo, my house overlooks the start of the Barton Loop 4 miles north of Preston. IMG_0992.jpeg
 

Attachments

  • IMG_0991.jpeg
    IMG_0991.jpeg
    2 MB · Views: 144

micktrain

New Member
Joined
30 Apr 2013
Messages
3
nice to refurbish the best of best ole for Windermere slower branch traffic or dollis hill branch
 

mbga8mjb

Member
Joined
16 Jan 2012
Messages
12
I witnessed this on Christmas Day, while walking the dog. The workers waved at the kids which was kind of them
 

mbga8mjb

Member
Joined
16 Jan 2012
Messages
12
What section exactly please?
From just south of the bridge over the guild wheel north of m55 to roughly where the road bridge is near Newsam Hall Lane in Broughton. There were three engineering trains working the section on the northbound but the southbound was also dismantled / wip at the time
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
Darn - missed it. I was on holiday with my grandchildren. Right outside my house.

However, I tried to take high quality photos and hopefully you can see the northbound line at the start of the Barton Loop has shiny new copper contact wire.

I think photo marked WCML new wires shows it best.
 

Attachments

  • WCML new wires 3.jpg
    WCML new wires 3.jpg
    262.5 KB · Views: 61
  • WCML new wires 2.jpg
    WCML new wires 2.jpg
    309.4 KB · Views: 60
  • WCML new wires.jpg
    WCML new wires.jpg
    257.9 KB · Views: 61
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,457
Location
Preston Lancs
So I know this does not fit in with the thread title but I did not think it worth starting another one. 10 days of work on WCML Preston to Lancaster April 10th to April 20th. Renewal of OHLE of 1973 vintage.

EDIT - I changed the thread title.
1772197013496.png
 
Last edited:
Status
Not open for further replies.

Top