That is debateable, as the tube train requires you to head East to head Down the Great Western Mainline which would no longer be required.
It's a 4 min ride plus walking time at Paddington. That's not worth spending tens of millions on an extra station to change.
Heathrow Southern railway needs the extra paths, as some passengers will treat it as a through Line to central London, since even though it is all stops it would be around 15 minutes faster than the South Western Railway service.
You can disincentivize this by including a premium fare to travel via Heathrow (similar to how any heavy rail service works now at Heathrow).
Taking 2U18 for example it takes 40 minutes to go from Staines to London Waterloo, then 15 minute interchange at London Waterloo, then 5 minutes to Tottenham Court Road so in total around 60 minutes
How on earth does it take 15 mins to change at Waterloo? 5-8 mins at worst.
I would disagree about not having Ealing Broadway as a station stop on the Semi-Fasts. As it is another major interchange for South West London
It is a major interchange that already has direct timely access to Heathrow.
Old Oak Common will reduce line speed from 85/MU100 to 60.
We need to increase line speed further in to compensate.
The 387s will be stopping to provide additional connectivity. Reading to Paddington they will call at Twyford, Maidenhead, Slough, West Drayton, Hayes & Harlington, West Ealing at least overnight, Ealing Broadway and Acton Mainline.
There's no real additional connectivity gained, it's a simple change onto an Elizabeth Line train or GWR Didcot Parkway stopper at Reading, and this gives you far more option than 1 or 2 Newbury stoppers would.
You don't built high speed railways to deliberately following Motorways
Tell the French that (and even look at HS1 - it spends a lot of time next to the A2/M2/M20 for a reason).
. The A329(M) follows the North Downs Line between Winnersh Triangle and Reading and that is third rail and has a 70mph limit in that area.
The NDL doesn't have a low speed limit because it is curvy, it has it because there is no point having a higher speed limit (because of the stopping pattern of NDL/SWR Reading line trains and the limitations of 3rd rail technology).
A high speed rail on a viaduct on top of the A329M would mostly have a linespeed of 100mph+ until the last half a mile where it would slow down to join the GWML, near Thames Valley Park.
The A329(M) has some rather sharp bends in built up areas of around 500m, you would very lucky to get 65mph out of that alignment
Not at all, many mainlines have linespeeds of 100mph+ with curves sharper than that.
Doesn't look like six tracks will be enough. Currently the lines are normally used as such Line 1 GWR IET ECS moves, Line 2 Down Main, Line 3 Up Main, Line 4 Down Relief, Line 5 Up Relief, Line 6 Crossrail ECS moves. Line 6 doesn't exist fully as part of Line 6 is now the CCOS (Crossrail Central Operating Section) Westbound Line.
Line 1/Line 6 don't have to exclusively be used for ECS moves - especially as the replacement HeX trains would be extensions of Paddington Elizabeth Line terminators in many cases.
My idea would enable an extra 7-8 IET paths an hour which is the same number of extra paths your idea will allow.
7-8 IET paths for billions upon billions of tunneling for a suburban tunnel out to Hayes?!
The through service from Paddington to Marlow was withdrawn because of how inefficient it is for capacity as Marlow can only fit a 2car Turbo or a 3 car 230. It is much better to run 8-12 car 387s & 345s into Paddington rather than a 2 car Turbo.
I was suggesting operating a through service to High Wycombe via Bourne End and Loudwater on the former alignment, Marlow would become a shuttle.
I agree a 2 car turbo would be inefficient use of capacity - I'd use a 8 car Class 387 with ASDO on the smaller stations, some of which can't be practically upgraded (e.g. Cookham).
Trans Pennine Route is currently being upgraded to provide a step change in service pattern.
It is, but NPR is still needed to encourage greater modal shift in a combined region of over 13 million people, where it is also desperately necessary to kickstart regeneration for some towns.
Which require extra through trains to provide the need increase in capacity for that
Extra through trains that can be delivered by replacing the under utilised Heathrow Express and extending the insane number of Elizabeth Line services that currently have to turn back at Paddington.
My plan would use Heathrow Western Access and Heathrow Southern Railway to enable removal of certain RailAir Buse routes.
There will still be a certain demand for RailAir on the Reading/Woking routes, especially given the railway doesn't operate at some times that people need to access Heathrow and RailAir does, or go to places that don't have direct rail services to Heathrow/better located for a drop off from residential areas than a local station - e.g. Winnersh Triangle Park and Ride or the Bishops Centre in Taplow pickup.
It isn't just Heathrow would benefit, the local communities like Southall and Hanwell would benefit from being able to fit on the train, rather than being left behind.
Exactly why you extend existing EL trains to fill this purpose, instead of continue running comparatively utilised Heathrow Express trains.
The Luggage takes up lets say half of the standing space.
Unrealistic, people don't bring that much luggage with most airlines' policies towards bringing more than 2 23kg suitcases, even with business and first class passengers.
During the off Peak frequency might drop to 4tph from 6tph
The off-peak frequency is already minimum 6tph and will only increase.
Lets say 25% of all passengers are traveling through Heathrow from Western Access/Southern Access to Central London.
You'd price it to disincentivize these journeys to central London via Heathrow, as suggested above.
This cuts minimum capacity to 167,067 per day for Heathrow passengers and maximum capacity for Heathrow passengers of 250,600 per day.
As I mentioned before, Heathrow currently has an average passenger volume of around 229-230k a day. Around 11.6k on average a day are domestic, most of who will be connecting and never leave Heathrow.
Then you have to calculate that many Heathrow passengers are coming from elsewhere in the UK by car or coach and will not interact with the rail system either.
250k a day capacity on the Elizabeth Line + the nearly 156k daily Picc Line capacity will continue to serve Heathrow's central London rail transport needs well for generations.
I do admire your optimism and your research is good, but the inner GWML corridor has recently received a massive investment and upgrade.
A further large investment anytime soon is unlikely.
Why not focus that energy on designing and proposing rail schemes elsewhere, where the current service offering is very poor?
Question: is any of the above based on proposals that are realistically going to come to light in the next 40, 50, 60 years? Or is this just a ”My idea for” type of discussion.
I think my idea to get rid of HeX at some point and potentially replace with extended Elizabeth line services onto the Heathrow Southern Railway proposed alignment/diverted GWR regional & intercity services via the Western Rail Access to Heathrow is a proposal at least partially already being considered somewhere.
@Bald Rick @The Planner
Any ideas? I think I have seen discussion of the replacement of HeX on this forum by either of you at some point?