Unit 420 is currently at Wolverton having bodywork repairs. Unit 402 has just come back from Brodies and is now at Heaton.
006, 007 and 013 have definitely got them so far.How many 333s have got the upgrades so far?
156481. Move caped but possibly now Monday.I see there is a 5S08 Heaton to Kilmarnock Bonnyton Depot tomorrow. Does anyone know which unit is scheduled to operate this working. MTIA
How long is it expected to be up there fir156481. Move caped but possibly now Monday.
So, 150218 has been out of service for 600 plus days. With the extensive rebuild and rewire that it's had, would you run it down the WCML on it's own? That's why 150128 was sent to lead on the way back.I take it with 150128 going up to Kilmarnock to pick up 150218, then 150218 is not fit to run on its own yet. Does it need more work or test runs
== Doublepost prevention - post automatically merged: ==
How long is it expected to be up there fir
Thank you diligentdaveSo, 150218 has been out of service for 600 plus days. With the extensive rebuild and rewire that it's had, would you run it down the WCML on it's own? That's why 150128 was sent to lead on the way back.
156481 should be about 3 weeks (ish).
333008 still has the old PIS System.
As (at times) a bias West Midlander I agree, however I believe (and to a degree I agree) that many think they are looking very worn out and are worse for wear after years on the cross city. To be fair, the units were in the west midlands for longer for intended so maybe that was why not much of job was done of them compared to Northern ones which were refurbed at the same time.If I'm being brutally honest... I prefer the WMR interiors over the Northern "Refurb" job...
As (at times) a bias West Midlander I agree, however I believe (and to a degree I agree) that many think they are looking very worn out and are worse for wear after years on the cross city. To be fair, the units were in the west midlands for longer for intended so maybe that was why not much of job was done of them compared to Northern ones which were refurbed at the same time.
Do you have a full list of which ones still have the old system?333008 still has the old PIS System.
Unfortunately not. But I believe 004 still has the old system aswell. I am at Leeds Station at the moment so I can have a look for some moreDo you have a full list of which ones still have the old system?
009, 011, 015 all have the old systemUnfortunately not. But I believe 004 still has the old system aswell. I am at Leeds Station at the moment so I can have a look for some more
That was 156481. It had to move to Neville Hill beforehand because of ROG's driver operating hours would of been exceeded if it was sent from Heaton the previous day.I see there is a 5S08 Neville Hill to Kilmarnock working today. Is it another 3 car going for retrospective repairs. Seeing as only just been for a refurbishment.
Refurbishment Will be commencing starting from next month realistically. On the 323 Interiors.
I have been on sick leave so unfortunately can't confirm the exact units completed.
150225 and 150148 on the 5J80 empties off 2W80 I think.Reports of a derailment on NH this morning any details to what is involved
Again one for diligentdave as it is a month since last asked. Are there any expected back dates for the following units.
150005 - First week of Oct
150107 - Mid December
150110 - Second week of November
150275 - Middle of October
155346 - Last week of September (supposedly)
156420 - 1st week of November
156484 - End of November
156491 - End of September
195104 - Don't ask, not worth it until 2027.
MTIA
Is it for overhaul or corrosion repairs.Just passed 156452 at Crewe on its way to Wolverton from Newton Heath. 5H70
What about the other 195 that was involved in this accident (195133)? Has that unit returned to service?I can understand that it is difficult to estimate how long it will take to carry out repairs to 195104, given the nature of the incident and the fact that nobody has had to carry out such rectification work on a CAF unit before. However, given that it was indisputably a permanent way defect with the blame laid at the door of Network Rail, why did it take so long (since March 2024,) to arrange for repairs to commence? Presumably NR will be paying for the damage to be put right. Will they also cover the leasing cost and/or compensation to Northern for the lack of availability of the set until it returns to service?