I've been looking into how the railway's 33kV AC feeders and how they are supplied by the 'Grid' power network(s) and have noticed two general formats that I'll explain in a couple diagrams.
a)
b)
The arrangement in A (left) is by far the most common: here the railway gets one or more 33kV circuits off a switchboard that is shared with the local primary distribution network in that area.
The arrangement in B (right) is different because the railway has (normally 2) 132/33kV transformers dedicated to its load, and so you only see them in the most high demand grid connections.
My question is: which grid connections have transformers dedicated to railway use?
Here I'll show a list of all the grid connections I'm aware of and whether or not I've seen that they have dedicated transformers. Although most Network Rail HVAC feeders are 33kV, a few are at lower voltages.
GSPs (that I know of!) with transformers dedicated to railway supply:
a)
b)
The arrangement in A (left) is by far the most common: here the railway gets one or more 33kV circuits off a switchboard that is shared with the local primary distribution network in that area.
The arrangement in B (right) is different because the railway has (normally 2) 132/33kV transformers dedicated to its load, and so you only see them in the most high demand grid connections.
My question is: which grid connections have transformers dedicated to railway use?
Here I'll show a list of all the grid connections I'm aware of and whether or not I've seen that they have dedicated transformers. Although most Network Rail HVAC feeders are 33kV, a few are at lower voltages.
GSPs (that I know of!) with transformers dedicated to railway supply:
- Southern
- New Cross
- actually from the 275kV transmission substation with 2x 275/33kV transformers
- prior to ~2015, New Cross was actually 3x 66kV cables from the switchboard of UKPN's New Cross 275/66 substation. The cables went to Lewisham, Nunhead and South Bermondsey. Was this the only time 66kV was used by the railway?
- Wimbledon
- 2x 132/33kV transformers onto a dedicated switchboard ("Wimbledon D") of 5x 33kV feeds. Fed from Wimbledon 275/132.
- Hastings
- 1x 132/33kV transformer off Hastings Grid, which itself is supplied by Ninfield 400/132
- Bournemouth-Weymouth 11kV electrification
- Wareham
- 1x 33/11kV transformer from 33kV switchboard at Wareham 132/33kV substation, 11kV transformer seems to be owned by NwR
- Redlands
- 1x 33/11kV transformer from 33kV switchboard at Redlands Primary substation, 11kV transformer seems to be owned by NwR
- Wareham
- New Cross
- East London Line
- Canal Junction
- 2x 132/33kV transformers off of New Cross 275/132
- Hoxton
- 1x 132/33kV transformer off of City Road [Main] 400/132
- I think this one is backup only
- Canal Junction
- Isle of Wight
- The three DC traction substations each have their own 33kV connection to the local grid with no railway HV cables on the island (Ryde, Rowborough, Sandown)
- North London
- Willesden (for Watford DC)
- 2x 132/11kV transformers from NG "Willesden Grid" 275/132. The 2x 132kV lines to Willesden 11kV are tee'd off the 2 lines going to Acton Lane 25kV
- Willesden (for Watford DC)
- Merseyrail
- Instead of 132kV and 33kV, Merseyrail is all at 11kV connecting the local power grid's 33kV network
- I think all the Merseyside GSPs have dedicated railway transformers though I could be wrong on this.
- Bank Hall (x2)
- direct connections from the 33kV switchboard at Lister Drive (275/132/33)
- Shore Road (x2)
- off 2x 33kV powerlines directly from Woodside Grid B, and 1 more powerline from Wallesey via other 33/11 substations
- Bromborough (x2)
- from the dual circuit 33kV powerline between Bromborough Grid and Rock Ferry Grid
- Hillside (x2)
- one 33kV powerline from Formby Grid, and another powerline from Southport Grid via other substations
- Birkenhead (x?)
- LUL
- Lots Road
- 2x 132/22kV transformers connected to Wimbledon 275/132
- Neasden
- 2x 132/22kV transformers connected to Hendon 132
- Mansell Street
- 2x 132/22kV transformers connected to City Road [main] 400/132
- Stephenson Street
- 2x 132/22kV transformers connected to West Ham 400/132
- Griffith House aka Chapel Street
- 2x 132/22kV transformers connected to St Johns Wood "B" 132kV
- Manor House
- 2x 132/11kV transformers connected to Tottenham
- (East) Finchley
- 2x 33/11kV transformers connected to Finchley Grid 132/33
- The source for LUL mentions Finchley as one of the "low" power connections along with Acton Lane, but it still has dedicated transformers
- Lots Road
- South East
- Bromley
- Northfleet
- Maidstone
- Sittingbourne
- Queenborough (x1, backup connection for Sheerness branch)
- Thanet
- Canterbury
- Folkstone
- Ashford
- Tunbridge Wells
- (the line between Hastings and Tunbridge Wells is at 11kV, the railway internally steps down the 33kV supplies from Tunbridge Wells and Hastings GSPs)
- South Central
- Croydon "B"
- Ashburton
- Three Bridges (x3)
- Eastbourne
- Dormansland
- This one is absolutely weird.
- 1x 33kV line which Network Rail immediately steps down to 11kV (for the East Grinstead line), and also to 22kV for the Redhill-Tonbridge line. And then another separate 11kV connection only for the East Grinstead line.
- Fishergate
- Hunston (x1)
- Wessex
- Leatherhead
- Byfleet (x3)
- Reading (x1)
- Camberley
- Aldershot
- Alton (x1)
- Wymering
- 2x 33kV lines and 1x 11kV for the lines between Cosham and St Denys/Eastleigh
- Basingstoke
- St Cross (x1)
- Southampton
- Bournemouth
- North London
- Acton Lane (1x 22kV for West London Line)
- Poole Street (2x 11kV for Northern City Line)
- Maiden Lane (1x 11kV for the last remnants of NLL 3rd rail)
- Stratford International (1x 11kV backup for Maiden Lane)
- LUL
- Acton Lane
- 3x powerlines from the 22kV Switchboard at Acton Lane 66/22. This is the same substation that supplied the West London Line connection
- The powerlines seem to go to 3 different LUL 22kV switching stations named: Brentham New, Greenford New, and Park Royal.
- Considered a "low power" grid connection like LUL Finchley.
- Acton Lane
Last edited: