With more recent signalling upgrades, details of which I am no longer aware of, is permissive working still available at Staines? I'm thinking Windsor/Weybridge splitters?
But the very reason these were written out of the timetable way back, was the potential for disruption if any one member of train crew didn't show up at the planned time (for whatever reason), this would shut the job up for a time, as Staines only has one UP and one DOWN line, with nowhere to go to get around a stranded train.
Class 701 'Aventra' trains for South Western Railway: progress updates
Here is a list of the deliveries and testing info to date: 701001 701002 delivered to Eastleigh on 10 June 2020; at Clapham Yard 701003 701004 delivered to Wimbledon on 30 June 2020; stored at Marchwood 701005 delivered to Eastleigh on 20 July 2020; testing under way 701006 delivered To...
With more recent signalling upgrades, details of which I am no longer aware of, is permissive working still available at Staines? I'm thinking Windsor/Weybridge splitters?
But the very reason these were written out of the timetable way back, was the potential for disruption if any one member of train crew didn't show up at the planned time (for whatever reason), this would shut the job up for a time, as Staines only has one UP and one DOWN line, with nowhere to go to get around a stranded train.