Might not be so risk averse when GBR is running fully.Even then I’d expect any reduced running times to get banked as yet more padding and yet more dwell time. The whole industry is shot-scared of trying to accelerate anything.
Might not be so risk averse when GBR is running fully.Even then I’d expect any reduced running times to get banked as yet more padding and yet more dwell time. The whole industry is shot-scared of trying to accelerate anything.
Unless I've missed it, you're asking for something to be invented. You'd reach implementation quicker with already permitted technology (DLR upside down contact) or nearly permitted (West Ealing charging device at more than one station per route). But that might look poor, having new live rail following modern standards near old live rail grandfathered in.Could units be charged at Uckfield off of a short third rail section (as opposed to a charge device like at West Ealing), that is only live when a train makes contact with it? While such an arrangement would be difficult on a long route like the WEML, I think it would work very well at a terminus like Uckfield.
Could units be charged at Uckfield off of a short third rail section (as opposed to a charge device like at West Ealing), that is only live when a train makes contact with it? While such an arrangement would be difficult on a long route like the WEML, I think it would work very well at a terminus like Uckfield.
Even then I’d expect any reduced running times to get banked as yet more padding and yet more dwell time. The whole industry is shot-scared of trying to accelerate anything.
1h46 to 1h51 is around the same as it was nearly 35 years ago in 86/DBSO days with one fewer stop.Is it? GEML to Norwich?
1h46 to 1h51 is around the same as it was nearly 35 years ago in 86/DBSO days with one fewer stop.
The Norwich line is actually the same as it was in the late 1930s but with a half hourly service and not two fast trains a day. And also more stops. I saw an old timetable.1h46 to 1h51 is around the same as it was nearly 35 years ago in 86/DBSO days with one fewer stop.
Why would they not have enough seats?If battery trains are the solution for these and some other unelectrified lines the Government and the railway industry should build and run new battery trains with an adequate number of seats replacing the diesel trains currently used. So far there is only the Greenford battery train trial on that very short line. There will be scepticism about battery trains unless and until they are used to provide a regular and reliable train service with an adequate number of seats on lines such as Uckfield, Marshlink, North Downs, Henley, Marlow and Slough to Windsor. Romsey to Salisbury via Southampton is another train service for which battery trains would be useful.
The big issues are going to be charging cycles, weight (electric trains are lighter than battery trains so less track wear and tear), potentially reliability and the fact that everyone else has already moved to overhead electrification for trains.If battery trains are the solution for these and some other unelectrified lines the Government and the railway industry should build and run new battery trains with an adequate number of seats replacing the diesel trains currently used. So far there is only the Greenford battery train trial on that very short line. There will be scepticism about battery trains unless and until they are used to provide a regular and reliable train service with an adequate number of seats on lines such as Uckfield, Marshlink, North Downs, Henley, Marlow and Slough to Windsor. Romsey to Salisbury via Southampton is another train service for which battery trains would be useful.
The big issues are going to be charging cycles, weight (electric trains are lighter than battery trains so less track wear and tear), potentially reliability and the fact that everyone else has already moved to overhead electrification for trains.
Southern’s fleet are very much capable of making it to the 2050s so it will be a long time before a new fleet is even worth considering. And of course we are already seeing newer rolling stock 387s cascading out the oldest electrostars so you could imagine the DfT kicking the can down the road with the turbos as well.
The technology for BEMUs exists now.Whilst the fleet should last another 25 years the separate question is should it - or at least should it in this location.
1. so should we continue to run diesels along routes where a large proportion of the track is electrified or should we be changing the trains to battery electric hybrids when technology allows
There was no track or platform capacity to put on additional or longer services on the Uckfield line anyway - they were running 10-Car Class 171s in the peak, and the single line can't take more than 1tph.2. Following the DfTs decision to move most of the ex Scotrail units to EMR there is no spare capacity to put on additional services or increase the length of the trains.
Again, the technology allows now - an Electrostar was converted back in 2015! https://www.theguardian.com/environ...attery-powered-train-carries-first-passengers.A solution would be to look at putting batteries in the electostars, well when technology allows, and cascading these to a line that’s 100%not electrified
There was no track or platform capacity to put on additional or longer services on the Uckfield line anyway - they were running 10-Car Class 171s in the peak, and the single line can't take more than 1tph
Is this possible in both directions, or only in one direction?They clearly can run at 30 minute intervals as in the morning peak there is a service at 6.33, 7.03 and 7.33.
Again, the technology allows now - an Electrostar was converted back in 2015! https://www.theguardian.com/environ...attery-powered-train-carries-first-passengers.
While I'm generally in support of all EMUs being converted to BEMUs with a minimum 'get me home' mode range, if you're looking for service BEMU fleets, why not order a current design such as a Desiro or FLIRT rather than try and convert 20-year-old trains?
If you order more than the bare minimum to operate the non-electric gaps you could cascade some Electrostars to replace older stock, or even (heaven forbid) electrify other lines with OLE (Chiltern comes to mind as a good home for them...)
Pre-covid they ran 2tph in the morning and evening peaksIs this possible in both directions, or only in one direction?
Which is precisely because of the poor service...And off-peak utilisation is quite bare bones
Cuts and austerity is not relevant to my point, Uckfield has always been hourly off-peak using a single (4 car) unit and as a result the utilisation of the 171 fleet is very very low most times.Which is precisely because of the poor service...
Its the same as how SWR and Southern have cut off peak services, then claim that the reason for not restoring them is because passenger numbers have not fully recovered... when the cuts are the exact reason why passenger numbers have not recovered
As they say, build it and they will come...its like they don't understand the concept of induced demand.
Cuts and austerity is not relevant to my point, Uckfield has always been hourly off-peak using a single (4 car) unit and as a result the utilisation of the 171 fleet is very very low most times.
The loops are placed to allow a half hourly service. When the normal service was restored following the Cowden crash, they had a half hourly service for a weekend using DEMUs. I don't recall any problems with timekeeping.There was no track or platform capacity to put on additional or longer services on the Uckfield line anyway - they were running 10-Car Class 171s in the peak, and the single line can't take more than 1tph.
Some diesel trains do not have enough seats. Cross Country trains are the worst example but many other diesel trains also do not have enough seats. I certainly would want and expect any battery trains that replace these diesel trains to have enough seats but the point needs to be made that more seats are needed when these diesel trains are replaced.Why would they not have enough seats?
Some diesel trains do not have enough seats. Cross Country trains are the worst example but many other diesel trains also do not have enough seats. I certainly would want and expect any battery trains that replace these diesel trains to have enough seats but the point needs to be made that more seats are needed when these diesel trains are replaced.
That is Little Horsted 400/132kV Grid Supply point (GSP) which will have 2 x 240MVA transformers. Its has two drivers - Firstly to provide a replacement supply to Lewes GSP as the plan is to remove the existing Lewes to Polegate 132kV circuit across the South Downs due to condition and improvements to visual landscape (perhaps we should be replacing 25kV for 3rd rail in areas of outstanding natural beauty across the UK!!). Secondly to accept a number of proposed solar and battery storage developments. The new Battery Storage facility reference by @Bald Rick will be connected at 132kV to Little Horsted.i havent checked, maybe I should, but I assume that is at the same site where they have been installing some huge great new transformers to boost the electricity supply to Uckfield - presumably to serve the significant residential development in the area.
Southern regularly run 12 coach 377s and 12 coach 387s all the way to Hastings and Ore so i see no reason why the 12 coach 700s could not.A question about power if i may!
How much `power` can the line from Lewes to Hastings provide on 3rd rail? I remember seeing a 700/1 at Lewes on a diversion, many years ago - but could they now run to Hastings?
Do Southern really take 12 coach trains through to Hastings without leaving a unit or two behind at Eastbourne?Southern regularly run 12 coach 377s and 12 coach 387s all the way to Hastings and Ore so i see no reason why the 12 coach 700s could not.
Yes it happens all the time. I have spotted full 12 coach Southern trains at Hastings and Ore on four separate occasions just within the last two months. In fact just at the end of last week i had a full 12 coach train on a Bexhill to Eastbourne journey i made. I am not sure whether it is booked or it only happens when they do not have staff to divide them at Eastbourne station. But it is certainly fairly common.Do Southern really take 12 coach trains through to Hastings without leaving a unit or two behind at Eastbourne?
Although most other countries are much further down the electric line than we are, that doesn’t preclude them looking at discontinuous electrification for some of the bits that are left - the Germans and Dutch certainly are - which means development won’t be for us alone.The big issues are going to be charging cycles, weight (electric trains are lighter than battery trains so less track wear and tear), potentially reliability and the fact that everyone else has already moved to overhead electrification for trains.