170103 by the looks of it.Cheers.
== Doublepost prevention - post automatically merged: ==
Does anyone know which unit ran 5K71?
I guess it is fairly obvious but just to confirm, was this 113?Realtime Trains | 5G70 1056 Crewe C.S. (L&Nwr Site) to Tyseley L.M.D. | 06/07/2025
Real-time train running information for 5G70 1056 departure from Crewe C.S. (L&Nwr Site) to Tyseley L.M.D. on 06/07/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Could 113 be out today?
Yes sir.I guess it is fairly obvious but just to confirm, was this 113?
And 103 has gone into Crewe to be spruced up?Yes sir.
Yes sir.And 103 has gone into Crewe to be spruced up?
Im going to raise a point on how long these units are taking. 170112 took i believe 11 weeks. And 113 has been in there 7 or 8, if we presume each unit is now going to be 11 weeks. A little bit of math gives us the list of predicted dates for units returning:
I see where your mathS* are coming from, but it has already been mentioned that they expect the pace to pick up to take approx 6 weeks per set (after the initial 2-3 units). This is on par with most refurbishments of this kind, so it does make sense. There will always be niggles and snags on some units too that will need to be addressed and mean some may take longer than others. With that in mind and with no major issues to availability of the fleet holding things up significantly, we could easily see the entire fleet completed by this time next year.
6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.6 Weeks per set?
Refurbishing the 9 and 11 car pendolinos was down to only a couple of weeks by the end of the program, if I recall correctly.
103Do you mean 103? Or is 113 still at Crewe?
== Doublepost prevention - post automatically merged: ==
6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.
It may be going well but 6 weeks is a bit slow!!6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.
According to a WMT fitter who is at Leicester every morning attending XC services this is exactly what is happening.Maybe it is the same team working on the EMR units as well?
Hope they don't get confused and end up putting seats in the wrong unitAccording to a WMT fitter who is at Leicester every morning attending XC services this is exactly what is happening.
It's different teams.Maybe it is the same team working on the EMR units as well?
Great to see that 113 has finally escaped from Tyseley.My photo of 170113 (on the back of 170117) at Cardiff Central Platform 2 on the 21/7/25, on 1M73 1545 Cardiff Central to Nottingham:
If I remember correctly it was out on Friday 11th on the Cardiff - Notts.Great to see that 113 has finally escaped from Tyseley.
I wouldn't have guessed so, considering there were a few others around me also photographing it!If I remember correctly it was out on Friday 11th on the Cardiff - Notts.
That’s a good sign. The rate of refurbishment has definitely increased now.Don't think it will be long until 170103 makes a return. It's looking good
They are all being done the cross-country turbostarsTravelled on 170112 between Burton-on-Trent and Birmingham earlier in the new refurbishment. Certainly came across as a fresh comfy interior, though, as is often the case, XC could do with more of them.