• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

CrossCountry XC Class 170 refurbishment

E B

Member
Joined
30 Oct 2024
Messages
400
Location
Nuneaton
Cheers.

== Doublepost prevention - post automatically merged: ==

Does anyone know which unit ran 5K71?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247

AirRail

Member
Joined
2 Sep 2020
Messages
44
Location
London Kings Cross
Im going to raise a point on how long these units are taking. 170112 took i believe 11 weeks. And 113 has been in there 7 or 8, if we presume each unit is now going to be 11 weeks. A little bit of math gives us the list of predicted dates for units returning:

I see where your mathS* are coming from, but it has already been mentioned that they expect the pace to pick up to take approx 6 weeks per set (after the initial 2-3 units). This is on par with most refurbishments of this kind, so it does make sense. There will always be niggles and snags on some units too that will need to be addressed and mean some may take longer than others. With that in mind and with no major issues to availability of the fleet holding things up significantly, we could easily see the entire fleet completed by this time next year.
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,507
Location
Lichfield
I see where your mathS* are coming from, but it has already been mentioned that they expect the pace to pick up to take approx 6 weeks per set (after the initial 2-3 units). This is on par with most refurbishments of this kind, so it does make sense. There will always be niggles and snags on some units too that will need to be addressed and mean some may take longer than others. With that in mind and with no major issues to availability of the fleet holding things up significantly, we could easily see the entire fleet completed by this time next year.

6 Weeks per set?

Refurbishing the 9 and 11 car pendolinos was down to only a couple of weeks by the end of the program, if I recall correctly.
 

Jacob Porrett

Established Member
Joined
28 Jan 2022
Messages
1,961
Location
Telford
6 Weeks per set?

Refurbishing the 9 and 11 car pendolinos was down to only a couple of weeks by the end of the program, if I recall correctly.
6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.
 

E B

Member
Joined
30 Oct 2024
Messages
400
Location
Nuneaton
Do you mean 103? Or is 113 still at Crewe?

== Doublepost prevention - post automatically merged: ==
 

Russel

Established Member
Joined
30 Jun 2022
Messages
5,507
Location
Lichfield
6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.

6 Weeks seems a long time to turn around a 2 or 3 car unit when Alstom were 9 and 11 car trains in less time.
 

liamf656

Established Member
Joined
2 Aug 2020
Messages
1,721
Location
Derby
6 weeks is what I've been told. All the seats have been removed from 170113 now. One of the ends has been rubbed down ready for a new look. Seems to be going well at the moment.
It may be going well but 6 weeks is a bit slow!!
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,687
Maybe it is the same team working on the EMR units as well?
 

1D54

Established Member
Joined
1 Jun 2019
Messages
1,472
Maybe it is the same team working on the EMR units as well?
According to a WMT fitter who is at Leicester every morning attending XC services this is exactly what is happening.
 

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
According to a WMT fitter who is at Leicester every morning attending XC services this is exactly what is happening.
Hope they don't get confused and end up putting seats in the wrong unit :D
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,187
My photo of 170113 (on the back of 170117) at Cardiff Central Platform 2 on the 21/7/25, on 1M73 1545 Cardiff Central to Nottingham:
Great to see that 113 has finally escaped from Tyseley.
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,973
Location
Wales (sometimes in England), thanks for replying!
If I remember correctly it was out on Friday 11th on the Cardiff - Notts.
I wouldn't have guessed so, considering there were a few others around me also photographing it!

My sighting of it was totally unplanned - I had got back from visiting a friend (hence the "DSLR-owner's phone photo").

I figured I'd share it in here, as no one else had done so! That's the only reason I did, as I don't really share my photos on this forum.
 

1D54

Established Member
Joined
1 Jun 2019
Messages
1,472
Without trawling through 400+ posts, how do they decide which unit goes in next. Is it simply done on the current condition of them?
 

E B

Member
Joined
30 Oct 2024
Messages
400
Location
Nuneaton
I would assume that they do it by whichever units are available, but I may be wrong.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,484
Location
Taunton or Kent
Travelled on 170112 between Burton-on-Trent and Birmingham earlier in the new refurbishment. Certainly came across as a fresh comfy interior, though, as is often the case, XC could do with more of them.
 

swinny1990

Member
Joined
27 Jun 2024
Messages
159
Location
Nottingham
Travelled on 170112 between Burton-on-Trent and Birmingham earlier in the new refurbishment. Certainly came across as a fresh comfy interior, though, as is often the case, XC could do with more of them.
They are all being done the cross-country turbostars
 

Top