Future new-build rolling stock at ScotRail

Status
Not open for further replies.

Rick1984

Member
Joined
23 Aug 2012
Messages
1,145
An EMU that was specialised to Glasgow Inner-Suburban operations would be good. Level boarding and a high capacity layout much like the class 777 or 701 would be good for improving North Clyde, Argyle and Cathcart Circle routes which have been neglected since basically the 1980s.
I do think a metro spec train for those lines is needed, but I have a feeling they'll go with a one size fits all option.
So more trains of similar spec to class 385 doing Cathcart circle routes, to which they're wholly unsuited
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
I do think a metro spec train for those lines is needed, but I have a feeling they'll go with a one size fits all option.
So more trains of similar spec to class 385 doing Cathcart circle routes, to which they're wholly unsuited
They will probably do some Cascades to help put the right train on the right route.
 

Transilien

Member
Joined
10 Mar 2024
Messages
750
Location
Ayrshire
They will probably do some Cascades to help put the right train on the right route.
Scotrail don't really have any dedicated Metro trains at the moment though. The closest they have at the moment are the 320s and 318s which already run much of the Glasgow Metro services and are due to be replaced by this train order anyway.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Scotrail don't really have any dedicated Metro trains at the moment though. The closest they have at the moment are the 320s and 318s which already run much of the Glasgow Metro services and are due to be replaced by this train order anyway.
Hence you would cascades to the existing fleets to put them on routes which are best suited to them. Also some 156s are getting replaced by this order I am pretty sure.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
295
Location
Glenrothes
Just read this from an official UK government article:

" The proposed new fleet will consist of Electric Multiple Units (EMUs) and Battery Electric Multiple Units (BEMUs). It is anticipated that under a Manufacturing and Supply Agreement (MSA) the core order will be for approximately 69 units, consisting of 41 EMUs and 28 BEMUs."

Meaning some battery/electric trains are in the process of being ordered which may well include Fife commuter services.

It is also said that:

"The procurement process for the MSA and TSSSA is anticipated to occur between 2025 and 2026, with initial unit deliveries expected to begin in late 2030. These timelines are subject to approval from Transport Scotland and the Scottish Government."

Meaning we're still a decent while away from seeing any new trains on our network. I really hope this doesn't turn into another 385 scandal with even further pushbacks than we already have.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
18,315
Location
Glasgow
Your idea of a scandal is hugely overstated.
That's the only major row I can remember about the 385s... so if it wasn't that then I have no idea what it was!
As with @Peter Mugridge , the only significant issue I can remember was the issue with the original curbed river's side windscreen glass causing a "ghosting" effect with signals.

There were some software issues as well in the early days (what new train doesn't?) but I don't remember them causing as much of an issue as the windscreens.
 

TrainViation

Member
Joined
25 Jun 2025
Messages
295
Location
Glenrothes
It was only really the windows that were an issue, I may have used the wrong word there... apologies. But lets just hope there are no further delays for new stock.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
That’s an X’Trapolis, though, whereas ALSTOM’s replacement platform is the Adessia.
Still, I'm sure that they can build a similar level boarding Adessia BEMU in Derby, and it would fit quite well on the ScotRail network, especially as they already have some Alstom stock (the 334s). AFAIK CAF/CRRC/Stadler have no products that have operated in Scotland (barring the Glasgow Subway units, but they're not mainline).
 

tfw756rider

On Moderation
Joined
30 Nov 2024
Messages
1,976
Location
Wales (sometimes in England), thanks for replying!
Still, I'm sure that they can build a similar level boarding Adessia BEMU in Derby, and it would fit quite well on the ScotRail network, especially as they already have some Alstom stock (the 334s). AFAIK CAF/CRRC/Stadler have no products that have operated in Scotland (barring the Glasgow Subway units, but they're not mainline).
The 334s though of course being a steel-bodied product of Alstom Washwood Heath (former Metro-Cammell, Birmingham), and not having much to do with the aluminium-bodied products of Alstom Derby (former ADtranz / Bombardier Transportation).
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
There were some software issues as well in the early days (what new train doesn't?) but I don't remember them causing as much of an issue as the windscreens.
Only ones which don't have any software.
Just read this from an official UK government article:

" The proposed new fleet will consist of Electric Multiple Units (EMUs) and Battery Electric Multiple Units (BEMUs). It is anticipated that under a Manufacturing and Supply Agreement (MSA) the core order will be for approximately 69 units, consisting of 41 EMUs and 28 BEMUs."

Meaning some battery/electric trains are in the process of being ordered which may well include Fife commuter services.

It is also said that:

"The procurement process for the MSA and TSSSA is anticipated to occur between 2025 and 2026, with initial unit deliveries expected to begin in late 2030. These timelines are subject to approval from Transport Scotland and the Scottish Government."

Meaning we're still a decent while away from seeing any new trains on our network. I really hope this doesn't turn into another 385 scandal with even further pushbacks than we already have.
Looks like Scotrail is losing EMUs under this tender, with there currently being 55 class 318s and 321s with Scotrail and I only see 41 replacement units being ordered.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,568
Location
"Marston Vale mafia"
Looks like Scotrail is losing EMUs under this tender, with there currently being 55 class 318s and 321s with Scotrail and I only see 41 replacement units being ordered.

Possibly not losing vehicles, though. Are they going fixed formation for the Glasgow EMU locals? It would make a lot of sense to do so.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
Possibly not losing vehicles, though. Are they going fixed formation for the Glasgow EMU locals? It would make a lot of sense to do so.
I vaguely remember reading it might be 5x24m or 6x20m fixed length units yes, but don't remember where, or how reliable the source was.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Possibly not losing vehicles, though. Are they going fixed formation for the Glasgow EMU locals? It would make a lot of sense to do so.
That is a good question, if they are going for 6 or 8 car sets then it isn't a bad move however if it is 3 or 4 car sets then it is a downgrade.
 

waverley47

Member
Joined
17 Apr 2015
Messages
849
Blatant self promotion, but for more information regarding the thinking inside TS, see this post.

It's not the final solution, but it is where the thinking inside TS is at the moment that I wrote it; I was speaking to some old colleagues about other, vaguely related things and the topic came up.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
The 334s though of course being a steel-bodied product of Alstom Washwood Heath (former Metro-Cammell, Birmingham), and not having much to do with the aluminium-bodied products of Alstom Derby (former ADtranz / Bombardier Transportation).
True - but surely there must be some common parts (and of course Alstom already having a successful product operating in Scotland is a bonus).
 

positron

Member
Joined
18 Oct 2022
Messages
715
Location
Cardiff
Why is it much of a factor of a company has a product running in Scotland already?

Stadler have mainline trains in Wales and Anglia and have other trains in Liverpool and soon Newcastle. They also have a tried and tested level boarding platform for the UK which works already. No risk of engineering issues with a brand new platform.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
Why is it much of a factor of a company has a product running in Scotland already?

Stadler have mainline trains in Wales and Anglia and have other trains in Liverpool and soon Newcastle. They also have a tried and tested level boarding platform for the UK which works already. No risk of engineering issues with a brand new platform.
The 777s with Merseyrail have had numerous issues even though it is a tried and tested platform.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,375
Location
belfast
The 777s with Merseyrail have had numerous issues even though it is a tried and tested platform.
and the 745s & 755s work very well, and are closer to anything Scotrail would order than the 777s are.

Why is it much of a factor of a company has a product running in Scotland already?
Personally, I suspect what Scotrail already has won't be a consideration at all.
Stadler have mainline trains in Wales and Anglia and have other trains in Liverpool and soon Newcastle. They also have a tried and tested level boarding platform for the UK which works already. No risk of engineering issues with a brand new platform.
Don't forget Stadler's trains on the Glasgow Subway!
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
Why is it much of a factor of a company has a product running in Scotland already?

Stadler have mainline trains in Wales and Anglia and have other trains in Liverpool and soon Newcastle. They also have a tried and tested level boarding platform for the UK which works already. No risk of engineering issues with a brand new platform.
Maintenance staff familiarity.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
Scotrail have shown no interest in that with previous purchases – since privatisation, they have bought trains from Adtranz, Alstom, Siemens and Hitachi, one batch/model from each.
Although we are moving back towards fleet simplification as an ordering strategy in general
 