Does anyone know what normally happens to the District Line timetables when Turnham Green to Ealing Broadway is closed?
Normally the Ealing Broadway branch gets 6tph (every ten minutes) in each direction and the Richmond branch gets 6tph (every ten minutes) in each direction.
I see that in just under a month on the 13th of September and on the 14th of September the line between Turnham Green and Ealing Broadway is closed.
So will the Ealing Broadway trains simply be diverted to Richmond and that branch will get 12tph which is double the usual frequency? Or do they terminate and turn the Ealing Broadway trains around somewhere else at an intermediate station? Or are the trains just scrapped altogether and the line frequency is reduced?
Normally the Ealing Broadway branch gets 6tph (every ten minutes) in each direction and the Richmond branch gets 6tph (every ten minutes) in each direction.
I see that in just under a month on the 13th of September and on the 14th of September the line between Turnham Green and Ealing Broadway is closed.
So will the Ealing Broadway trains simply be diverted to Richmond and that branch will get 12tph which is double the usual frequency? Or do they terminate and turn the Ealing Broadway trains around somewhere else at an intermediate station? Or are the trains just scrapped altogether and the line frequency is reduced?