The original plan was December. Pretty sure they could get a few drivers competent by then .So possibly into passenger service in the New Year?
The original plan was December. Pretty sure they could get a few drivers competent by then .So possibly into passenger service in the New Year?
And Train Managers, and catering teams, and station teams.The original plan was December. Pretty sure they could get a few drivers competent by then .
Oh I don't necessarily think it will , but definitely was a diagram pencilled in .And Train Managers, and catering teams, and station teams.
Also the depot teams.
That's still quite a few people to get trained, when at the moment (not actually confirmed officially) they only have one unit at Etches Park.
The 9 car units don’t have a 25kV busline either, so you’ll only see one pantograph raised and one transformer in use.Thank you, is that the case for 9 car units as well or do 9 car units use both transformers?
Damn, beat me to it!I predict at least one passenger diagram will get scheduled before 31st December, in order to save face.
Which 810?Observed via 8XX Appreciation Group on Facebook that 81000& commenced mainline testing this week. Has done 3. Lights log testing and continues into wc 4th August.
Post #4108!Which 810?
There already was .I predict at least one passenger diagram will get scheduled before 31st December, in order to save face.
South-of-Bedford OLE upgrade is now complete; however the 100mph cap on electric traction has an undefined stay of execution, for reasons I'm trying (and failing) to understand.One day the Auroras will enter service. I recall they had to maintain the same timings on diesel power as electric. By the time they enter service, the OHLE south of Bedford will all have been upgraded.
What's the high voltage line for that runs at the top centre of each carriage? I thought this was the 25kV bus line? There's what looks like a bus bar linking it to the pantograph on the driving vehicles.The 9 car units don’t have a 25kV busline either, so you’ll only see one pantograph raised and one transformer in use.
Thanks for the heads up. Confirmed 810009 is on this.A path activated for today for a Merchant Park to Etches Park Move, possibly 810009.
Path from RTT attached below 5Q30 08:28 Merchant Park to Etches Park
Sadly not a chance - signalling failure at Wigston - it’s a right mess!Didn't see it picked up here but it looks like an Old Dalby based 810 was out and about last week overnight, getting as far south as Luton
Today seems like today's plan is test running Old Dalby-Bedford-Leicester-Luton-Old Dalby
Sadly not a chance - signalling failure at Wigston - it’s a right mess!
Ah 810009, thanks.Post #4108!
Observed via 8XX Appreciation Group on Facebook that 810009 commenced mainline testing this week. Has done 3. Lights log testing and continues into wc 4th August.
Does that mean that the problems with overheating wiring and not working in tandem have been fixed?810008 is the one that’s already been handed over and 810009 to be handed over this week.
Not sure on about that - only the chosen few are allowed near them or on them at the minute!Does that mean that the problems with overheating wiring and not working in tandem have been fixed?
10 car working still needs all the relevant testing to be carried out by Hitachi.Does that mean that the problems with overheating wiring and not working in tandem have been fixed?
Wiring sorted on those units. That's why 008 went back to Newton Aycliffe.Does that mean that the problems with overheating wiring and not working in tandem have been fixed?
At the risk of overlapping with the "stopgap options" speculation, does this apparent progress end the need for stopgaps?10 car working still needs all the relevant testing to be carried out by Hitachi.
These 2 units are the first to be leased by EMR which enables proper driver and other crew training to commence.
As for over heating wiring, as long as it has been replaced at the factory on these units, then yes, sorted.
You stop yourself now! How dare you talk sense!At the risk of overlapping with the "stopgap options" speculation, does this apparent progress end the need for stopgaps?
Any genuinely informed news going around within EMR?
i.e. get the crews into training, lose a few 7-car to Lumo in September, accept that Oct/Nov is probably going to be... challenging... and then hope to get a few 810s slotted into what are currently 7-car diagrams before Christmas?
(At the risk of being cynical, if 222s are heading to Lumo and there aren't enough to run the service, the crews from the cancelled services can be used to accelerate training. It's a genuine win-win!)
How long will it take for the wiring to be fixed on all the units?Wiring sorted on those units. That's why 008 went back to Newton Aycliffe.
Which looks like it started today but only got as far as Nottingham due to a fatality at Kettering.10 car working still needs all the relevant testing to be carried out by Hitachi.
These 2 units are the first to be leased by EMR which enables proper driver and other crew training to commence.
As for over heating wiring, as long as it has been replaced at the factory on these units, then yes, sorted.
810008 is allocated to the same journeys todayWhich looks like it started today but only got as far as Nottingham due to a fatality at Kettering.
Realtime Trains | 3A27 1300 Etches Park Sdgs to Nottingham | 12/08/2025
Real-time train running information for 3A27 1300 departure from Etches Park Sdgs to Nottingham on 12/08/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
810008 is allocated to the same journeys today
Realtime Trains | 3A27 1300 Etches Park Sdgs to St Pancras International | 13/08/2025
Real-time train running information for 3A27 1300 departure from Etches Park Sdgs to St Pancras International on 13/08/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Realtime Trains | 3A28 1548 St Pancras International to Etches Park Sdgs | 13/08/2025
Real-time train running information for 3A28 1548 departure from St Pancras International to Etches Park Sdgs on 13/08/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Shame. We all secretly look forward to a good old crisis with decrepit cast-offs and heritage trains being press-ganged into frontline service.You stop yourself now! How dare you talk sense!
I wouldnt call that a win-win if timetabled passenger trains are cancelled. It means that yet again the railway industry has failed the customers as, despite sky high fares, the service just isn't being offered.At the risk of overlapping with the "stopgap options" speculation, does this apparent progress end the need for stopgaps?
Any genuinely informed news going around within EMR?
i.e. get the crews into training, lose a few 7-car to Lumo in September, accept that Oct/Nov is probably going to be... challenging... and then hope to get a few 810s slotted into what are currently 7-car diagrams before Christmas?
(At the risk of being cynical, if 222s are heading to Lumo and there aren't enough to run the service, the crews from the cancelled services can be used to accelerate training. It's a genuine win-win!)