Out of interest, is there any public statement of this from DfT/EWR co/Chiltern?Is it as simple as driver recruitment, often is. Especially requiring a 2tph service all week, even Sundays.
It’s pretty weird though, admittedly.
Out of interest, is there any public statement of this from DfT/EWR co/Chiltern?Is it as simple as driver recruitment, often is. Especially requiring a 2tph service all week, even Sundays.
It’s pretty weird though, admittedly.
I'm not surprised. It took ORR around six months after completion to allow the perfectly workable and safe new platform at Market Harborough to be brought into service when the line was straightened there.Out of interest, is there any public statement of this from DfT/EWR co/Chiltern?
I'm not surprised either, but there's an accountability principle here given the scale of public investment. One obvious question is 'were Chiltern able to begin recruitment of drivers in a timely manner, and if not why not?'.I'm not surprised. It took ORR around six months after completion to allow the perfectly workable and safe new platform at Market Harborough to be brought into service when the line was straightened there.
That depends if there's enough drivers for a 1tph service all-day, and whether doing so would further slow down the introduction of the 2tph service as there's now a service to run instead of training all the drivers. But yes, if a 1tph trial service could be run, it is very much getting into the stage of get on with it!If there's not enough drivers for a 2tph service, then start with a 1tph weekday service tomorrow instead.
That depends if there's enough drivers for a 1tph service all-day, and whether doing so would further slow down the introduction of the 2tph service as there's now a service to run instead of training all the drivers. But yes, if a 1tph trial service could be run, it is very much getting into the stage of get on with it!
There's effectively only one new station, which is Winslow.Similarly if any stations aren't ready, just miss them out.
Is Newton Longville's construction off the agenda indefinitely now? Or merely kicked into "very long grass"There's effectively only one new station, which is Winslow.
Is Newton Longville's construction off the agenda indefinitely now? Or merely kicked into "very long grass"
The sight of skewed eastbound track and the island platform "footprint", looks so incongruous.

There was certainly one bridge where the tracks splayed to take advantage of a second arch for gauge clearance purposes. Is it this one?Do we know the splaying of the lines is for an island platform and not just because of how the bridge supports are located? Surely the station would have had side platforms as per Winslow.
There was certainly one bridge where the tracks splayed to take advantage of a second arch for gauge clearance purposes. Is it this one?
IIRC by the time of the TWA order application there was no mention of a station at Newton Longville, I reckon it’s one of those suggestions that didn’t make it through the early sift of options.Aside from as a park and ride into Milton Keynes (for which 2tph isn't going to be a lot of use, really) I'm not sure what purpose it would serve, being a good kilometre from the nearest point of the village. Anyone getting in the car (or on their e-bike*) to go there could just as easily go to Bletchley.
Do we know the splaying of the lines is for an island platform and not just because of how the bridge supports are located? Surely the station would have had side platforms as per Winslow.
* There's a whacking great hill between there and Bletchley station, on Buckingham Road, which I have cycled up a few times but never enjoyed it!![]()
Probably, becuase it has the three full arches (legacy of WW2 sidings?) and each running line passes through the middle of a single arch.There was certainly one bridge where the tracks splayed to take advantage of a second arch for gauge clearance purposes. Is it this one?

There were only two fully usable arches, the two tracks of the line used the centre arch as is typical elsewhere. @Nottingham59 linked to a 1950s OS Map here:Probably, becuase it has the three full arches (legacy of WW2 sidings?) and each running line passes through the middle of a single arch.
@Bletchleyite the attached photo shows what I inferred as a "platform footprint". It might of course be pure coincidence.
Edit: @swt_passenger has replied already.![]()
Plus anyone who, for any reason, needs to travel between Oxford and Milton Keynes - even once- between now and when the line opens.This is of course the issue - no one is actually being caused any inconvenience by the continued lack of something that hasn’t existed for 60-odd years, other , I suppose than anyone who has moved or changed jobs of the basis that trains would be running by now. That’ll be a fairly small cohort.
In the 1950s, yes, but not in its remodelled form. Post #552 photo taken April this year - and forum member Sqwizz has posted at least one photo of the bridge that shows each line passing under separate arches.There were only two fully usable arches, the two tracks of the line used the centre arch.
Besides possibly a few peak time calls, Islip won't receive any EWR services. If a service increase is wanted, then calling the 2nd Marylebone-Oxford there every hour rather than every 2 hours would be the obvious decision rather than EWR, so I doubt it will get any regular trains towards Bletchley in the future either. Oxford-Bicester increasing to 4tph will certainly be useful for many people including tourists. With only 2 car trains however, I doubt the Oxford-MKs will be able to carry much more than just Oxford-MK passengers most of the time.Hopefully they'll be busy enough from Winslow, Bletchley and Milton Keynes, but passengers between Oxford, Parkway, Islip and Bicester would presumably appreciate the extra 2tph.
I know, and if you go back to the infrastructure thread via the earlier link, and read on therein, I posted the TWA drawing showing that the intention was to use the two separate arches. My intention above was only to note that the third arch on the south side was not actually usable (we had assumed that only the north side arch had been modified to full depth and possibly underpinned.In the 1950s, yes, but not in its remodelled form. Post #552 photo taken April this year - and forum member Sqwizz has posted at least one photo of the bridge that shows each line passing under separate arches.
Winslow will be a park and ride in effect, especially for Buckingham. It will attract decent usage.I suppose Winslow people (all three of them) must be chomping at the bit. But it's a fair position - nobody uses EWR for their daily life as yet.
But yes, I think we can all agree we want to see it start up asap, and grow.
Lot more than three! The concern is that a two carriage train will not be sufficient. Much local debate about car parking costs and the town being gridlocked by parking in side streets. Everyone wondering why its taking so long to get it opened. But as Chiltern are involved it shouldn't have come as a surpriseI suppose Winslow people (all three of them) must be chomping at the bit. But it's a fair position - nobody uses EWR for their daily life as yet.
But yes, I think we can all agree we want to see it start up asap, and grow.
I have contacted my MP, Callum Anderson, to ask the same question.I've just emailed mine, Emily Darlington MP for Central MK, to ask what she can find out.
Hmmmmmm. I think you might want to count again. it is a very popular and affluent village/small town for MK commuters and for the Buckingham area and will only get bigger with all of the building work going on there.I suppose Winslow people (all three of them) must be chomping at the bit.
Hmmmmmm. I think you might want to count again. it is a very popular and affluent village/small town for MK commuters and for the Buckingham area and will only get bigger with all of the building work going on there.
I know several people who have moved there because of the station. They currently drive to MK and might not move to the train due to the delays.
The Northumberland line took less than eight months to more or less reach that stage, and I'd be surprised if EWR passenger numbers are much lower.My suspicion is that they're going to have to go looking for some more units to make everything 4 car before very long,
agreed - however there are quite a few people I know moving out that way from MK - they are at a stage in life where they are moving from perhaps thier first home/first married home to a family home in a nice area.My expectation is that Winslow will become another Bicester and effectively be completely transformed* into a sort of new town with significant building and expansion, primarily aimed at Oxford commuters but also some to MK
Agree with all of this, although I think 4/5 car will be fine until the Marston Vale upgrades have been completed, and beyond that there's a limit from platform 2A and MKC. By the time extensions to 8- or 12-cars are needed, it'll be sufficiently far down the line that it wouldn't have saved much to have built longer platforms from the off.My expectation is that Winslow will become another Bicester and effectively be completely transformed* into a sort of new town with significant building and expansion, primarily aimed at Oxford commuters but also some to MK. The station is presently on its northern edge, I'd see it likely as being more in the middle of town before very long. (It doesn't have much of a town centre but I'd expect one to be developed). After all, Bicester was a fairly small market town (maybe Newport Pagnell sized at most) until perhaps 25 years ago and is now pretty big.
My suspicion is that they're going to have to go looking for some more units to make everything 4 car before very long, and that before much longer after that there will be huge regret at not having built it all to 8 car or even 12.
I would think the effect on Buckingham will be smaller - there may be a switch from using the X5 (grim now it's just used urban buses) to driving to Winslow and going by train, but I suspect a lot of people who already go to Oxford will just continue driving to Peartree Park and Ride as the best value option. I can't see very many driving to Winslow to get to MK, though no doubt some will as A421 traffic can be a bit unpleasant in the peaks.
* Not necessarily in a good way; it's a bit run down in the centre these days and has lost most of its charm.
You maybe disappointed as I don't think they'll even be 4 cars, the plan is 6x 2car Class 196 to run Oxford to MK.although I think 4/5 car will be fine until the Marston Vale upgrades have been completed
I appreciate numbers there are up on predictions, but I don’t think that alone guarantees they’ll be able to suddenly increase to four cars. Politicians saying they’re needed doesn’t seem to have a strong track record in changing allocations or leases.The Northumberland line took less than eight months to more or less reach that stage, and I'd be surprised if EWR passenger numbers are much lower.
I knew they were starting as 2-car, I was talking about even when they're first lengthened, they'll be fine at 4/5 cars for a while.You maybe disappointed as I don't think they'll even be 4 cars, the plan is 6x 2car Class 196 to run Oxford to MK.
![]()
First passenger train covers East West Rail as'196' tests also get under way
A charter train has run along EWR which is due to open to regular traffic later this year.www.railmagazine.com
Extract from Rail magazine about Class 196 from WMT
".... for use by Chiltern Railways on the route have also appeared as part of the driver training programme.
Three two-car units,.....
.... A total of six units are being sub-leased..."