JamesRowden
Established Member
I did consider these. I even described them in my post.As I have said before and say again, all this sort of crayoning does is create difficulties elsewhere.
How much real thought did you give to this ?
Congratulations - you've now introduced :
- NO service between High Street Ken and Gloucester Road (because you scrapped Circle)
- every 5 min reversing District west to east at Aldgate, wasting through platforms cutting overall throughput, anyway is impossible on the current track layout, and even if you could, improbable timetable on using two platforms for these 12 TPH alternating reversals with any kind of robustness
- every 5 min reversing District Wimbledons west to east at Earls Court, again cutting overall throughput by wasting through platforms, again impossible on the current track layout (indeed see your own diagram), again needs 2 platforms alternating for 12 TPH reversal robustness, at the very last location you want 12 stationary trains reversing per hour. You've more or less killed 1/3 total Earls Court capacity in one hit
- Additional interchanges - of which up to 50% are not cross platform in the same direction because of the terminating services alternating platforms that the layout places on oppsite islands
Lunacy.
Put the crayons away.
I don't think having to change at Earls Court or Aldgate between every 5 minutes services is significantly worse than having an every 10 minute direct service.
There would be no through services at Aldgate. The present every 10 minute through services at Aldgate don't seem to be making much use of the through platforms.
Every 5 minutes rather than every 10 minutes services from Edgware Road to Earls Court, and District core to Wimbledon, I think is better than every 10 minutes direct services on the Circle and Edgware Road to Wimbledon, (unless it becomes overcrowded) even if connections at Earls Court aren't cross platform.
You haven't really come up with any real issues with my idea (unlike myself which I stated in the post).
