Had a weird conversation with an elderly (ex railway) gentleman who was clearly schooled in the post war find a solution generation.
Actually not weird, more thinking out of the box, but as this is a speculative solution on Crewkerne area problems, going to pitch them here, for discussion.
1) Long term got to cut the vegetation, or rebuild the sub base so there is less clay (which dries out) near the ballast.
2) Irrigating is bit bonkers to artificially keep it damp
3) Accept the speed restrictions might happen every 3 years with dry summers and add more passing loops, because delays vary the crossing points
4) I think he would rather see it restored to a quality double track, but we all know that's unlikely
The conversation then moved on to what about signalling these extra loops
5) West Highland style hydraulic points, but they require low speed and still need signals so need proper points/turnouts
6) do you need fixed signals, could you bring forward cab signals / ECTS
Then I muddled the conversation by saying they use it in mid Wales to Barmouth etc on 158s, which are about to be replaced by 197s
He then said, could you reform some class 159 trains into fixed 6car sets using a Welsh 158 cab at outer ends, or simply switch the ECTS panels to 159s.
I have no idea if it could be done, but afterwards I thought you could have a subset of 6car sets for Salisbury-Exeter section, and couple on standard units at Salisbury for Waterloo section.
What I have no idea about (I know nothing about signalling costs, apart from not cheap) is if adding 2 or 3 conventionally signalled extra passing loops, is cheaper than an ECTS solution, bearing in mind only a very limited fleet ever pass along that line, and there is an outline plan to fit locos with ECTS anyway.
My gut feeling is no modern manager has the skill to successfully justify why financially and practically these are better options to action now, than the paralysis let's just do nothing until autumn, and hope it doesn't happen again in next few decades. In other words the risk of repeat with its negative financial implications has worse cost-benefit number that upgrading now to provide a solution.