Should the Highland Mainline be electrified / redoubled?

Status
Not open for further replies.

TrainViation

Member
Joined
25 Jun 2025
Messages
292
Location
Glenrothes
Moderator note: Split from
This is the information I have/had in a Word document rather than map format

Recent or Existing Scottish Grid Feeders

Currie - new or improved to be built?
Portobello
Innerwick
Harker (just on the UK side)
Ecclefechan
Elvanfoot
Gowkthrapple
Saltcoats
Dalreoch
Port Glasgow
Parkhead

Planned for Decarbonisation Strategy

Thornton - applied for
Invergowrie - now Dundee
Drumlithie
Kintore
Elgin
Beauly
Avielochan
Faskally
Greenloaning
Marshall Meadows (just on the English side) - Static Frequency Converter?
Come to think of it, I feel like electrifying the Highland Mainline is a bit of a lost cause for what the benefits of electrification are at the minute.

I'm completely advocating for electrification, but I think if possible double tracking a lot of the route would be a better way to boost capacity and speed up services. As less time is wasted, waiting in passing places, for trains to pass. Though I'd imagine if it did ever happen, the wires would be up to Aberdeen by then, and most likely Dunblane to Dundee would be electrified (2035 roughly).

Not sure how freight would work with partial/discontinuous electrification though, as diesels will be a thing of the past supposedly, and battery/hydrogen would be completely inviable energy sources. They'd have to do something about it, and hopefully it's full electrification.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MadMac

Established Member
Joined
13 Jun 2008
Messages
1,494
Location
Moorpark, CA
Come to think of it, I feel like electrifying the Highland Mainline is a bit of a lost cause for what the benefits of electrification are at the minute. I'm completely advocating for electrification, but I think *if possible* double tracking a lot of the route would be a better way to boost capacity and speed up services. As less time is wasted, waiting in passing places, for trains to pass. Though I'd imagine if it did ever happen, the wires would be up to Aberdeen by then, and most likely Dunblane to Dundee would be electrified (2035 roughly).

Not sure how freight would work with partial/discontinuous electrification though, as diesels will be a thing of the past supposedly, and battery/hydrogen would be completely inviable energy sources. They'd have to do something about it, and hopefully it's full electrification.
How much of the HML was double to begin with?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,254
Come to think of it, I feel like electrifying the Highland Mainline is a bit of a lost cause for what the benefits of electrification are at the minute. I'm completely advocating for electrification, but I think *if possible* double tracking a lot of the route would be a better way to boost capacity and speed up services. As less time is wasted, waiting in passing places, for trains to pass. Though I'd imagine if it did ever happen, the wires would be up to Aberdeen by then, and most likely Dunblane to Dundee would be electrified (2035 roughly).
You'll be in for a shock with what the 222s will do to the HML timings which will optimise the single track and passing situation better in many cases leaving only one obvious (and easy) bit of re-doubling that stands out as being worth while.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
You'll be in for a shock with what the 222s will do to the HML timings which will optimise the single track and passing situation better in many cases leaving only one obvious (and easy) bit of re-doubling that stands out as being worth while.
How much will they reduce journey times? Secondly where is the bit of redoubling that will stand out as worthwhile?
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
AFAIK the only substantial section which was once double but isn't now is from Culloden to Daviot. There are also some passing loops which may only date to WW2 when the route was full of military trains. I would have thought that a major constraint is that between Perth and Edinburgh /Glasgow which determines the times at which trains enter and leave the HML Any new double sections would need to be ,located where trains would naturally cross.
 

reecestrains

Member
Joined
22 Aug 2023
Messages
384
Location
Leeds, West Yorkshire
The only sections of the HML that are currently double track are Perth-Stanley Junction, Blair Atholl to Dalwhinnie and after Culloden Viaduct to Inverness if you don't count the stations and passing loops.

Plus I feel electrification won't happen for a very long time, probably would be one of the last if it did ever get electrified.
 

Falcon1200

Established Member
Joined
14 Jun 2021
Messages
6,553
Location
Neilston, East Renfrewshire
How much of the HML was double to begin with?

The vast vast majority.

The only part of the HML which was double track but is now single is, as mentioned above, Daviot to Culloden - A distance of less than 5 miles, singled in 1968. Blair Atholl/Dalwhinnie was singled in 1966 but redoubled in 1978. There were certainly more passing loops but while helping capacity they would not do much for journey times.
 

Dr Day

Member
Joined
16 Oct 2018
Messages
758
Location
Bristol
What's the problem investment in the HML would solve? How much extra frequency or journey time or reliability improvement would make enough of a difference for a significant number of trips (passenger or freight) to switch to rail?

The reason I generally drive to the Highlands is primarily because I need a car to get around once I'm there, not because there aren't enough trains or they are too slow (or even that they are too expensive).
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,381
Location
The Fens
Blair Atholl/Dalwhinnie was singled in 1966 but redoubled in 1978. There were certainly more passing loops but while helping capacity they would not do much for journey times.
Redoubling Blair Atholl-Dalwhinnie was for increased freight traffic at the start of North Sea Oil.

The same project also included reinstating passing loops at Kincraig, Schlod and Moy.
 

jadmor

Member
Joined
26 Nov 2013
Messages
154
Redoubling Blair Atholl-Dalwhinnie was for increased freight traffic at the start of North Sea Oil.

The same project also included reinstating passing loops at Kincraig, Schlod and Moy.

== Doublepost prevention - post automatically merged: ==

Deleted, question already answered above.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
I feel that at stations there should be at least one mile of double track/passing loop at each end of every station. That surely would help.
 

Acfb

Member
Joined
12 Aug 2018
Messages
616
Having just been to Dunkeld & Birnam today, I was wondering how much it would cost to make every station on the HML properly accessible in terms of lifts etc. (Or a 'cheaper' ramp etc) Of course with the existing irregular timetable some northbound trains use platform 1 anyway like they do at other stations.

More doubling would be useful if it could result in more Inverness-Edinburgh direct services and better reliability
 
Last edited:

al78

Established Member
Joined
7 Jan 2013
Messages
2,600
The reason I generally drive to the Highlands is primarily because I need a car to get around once I'm there, not because there aren't enough trains or they are too slow (or even that they are too expensive).
You have the option of hiring a car if you are going to a sizable populated area, but train plus hire car is by far the most expensive way to travel to and around the highlands (I know because I have done it that way).
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,462
Location
Taunton or Kent
Some extended double track between Aviemore and Culloden would be useful for trying to stop having passenger trains sit in the Tomatin loop, which has no station. Perhaps one long dynamic loop between Carrbridge and Tomatin would cover this.
 

HighlandStorm

Member
Joined
27 Sep 2024
Messages
162
Location
Inverness
Some extended double track between Aviemore and Culloden would be useful for trying to stop having passenger trains sit in the Tomatin loop, which has no station. Perhaps one long dynamic loop between Carrbridge and Tomatin would cover this.
That would involve some serious work with large single track viaducts either side of Slochd Summit.

However the bridge replacement a few years ago at Moy allows for a future double formation as will the new bridge carrying the A9 over the HML at Moy - so the potential for a longer Moy loop and clearance for electrification is being done as part of the A9 dualling.

Given the number of trains that need to stop at Moy Tomatin what cost would be required to reopen Tomatin station and have a park and ride facility there?
 
Last edited:

47421

Member
Joined
7 Feb 2012
Messages
686
Location
london
In 2018/19 £57million was spent on loop extensions/improvements at Pitlochry & Aviemore. This was to accommodate an hourly service with passing at Pitlochry, the double track section at Drumochter and Aviemore. As we all know the hourly timetable was never implemented. Doesn't mean there should not be other investment, but given infrastructure is today not at capacity you can see it will be difficult to make the investment case
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,161
I'm completely advocating for electrification, but I think if possible double tracking a lot of the route would be a better way to boost capacity and speed up services. As less time is wasted, waiting in passing places, for trains to pass. Though I'd imagine if it did ever happen, the wires would be up to Aberdeen by then, and most likely Dunblane to Dundee would be electrified (2035 roughly).
I will preface this by saying that I am a complete amateur, so please take my ideas with a large pinch of salt, but these are my thoughts!

Dunblane to Perth and Dundee would definitely be a good first step, but I think the future for the HML is discontinuous electrification.
By the time the HML is likely to be on the list for electrification, feasible battery ranges to cover the gaps between wired section is likely going to be 75 miles plus.

The way Inverness is growing, it may need a suburban fleet, with regional BEMUs of a similar design but with larger batteries. These may benefit from charging on the Highland Main Line, so maybe the 3.5 miles from Inverness to Culloden would be smart to start with (plus Inverness to Beauly/Nairn on the Far North/Aberdeen lines, respectively).

It's close to 25 miles from Culloden to Carrbridge, and it's around 7 miles from Carrbridge to Aviemore.
This would perhaps seem to be a good section to electrify - it's relatively high density for the Highlands, so not too rural, and Aviemore gets stops on all Glasgow/Edinburgh to Inverness services AFAIK, so a good place to pick up some extra charge during the stop.

From Aviemore to Dalwhinnie, it is another 25 miles.
I would wire Dalwhinnie to Blair Atholl as my last major wiring section - while it is nearly 24 miles from Dalwhinnie to Blair Atholl, it is probably best for units to be able to charge on the long double track section, especially given the summit of the line is between these 2 stations, and it might enable the absence of a wired section as far as Perth.

Finally, from Blair Atholl to Perth, it is around 35 miles. Maybe this is too much for a section without wires if you're operating with intercity 100mph OHLE/battery BEMUs, but with a 75 mile + battery range that my plans are predicated on, and a continuously wired section from Glasgow/Edinburgh to Perth under my plans (mostly already wired now), that would be less than half of the battery capacity used for northbound trains, and hopefully the rate of charge along the Dalwhinnie to Blair Atholl wired section is fast enough that southbound trains would be able to add enough charge to cover at least 40-45 miles for contingency.
 

brad465

Veteran Member
Joined
11 Aug 2010
Messages
11,462
Location
Taunton or Kent
That would involve some serious work with large single track viaducts either side of Slochd Summit.

However the bridge replacement a few years ago at Moy allows for a future double formation as will the new bridge carrying the A9 over the HML at Moy - so the potential for a longer Moy loop and clearance for electrification is being done as part of the A9 dualling.

Given the number of trains that need to stop at Moy Tomatin what cost would be required to reopen Tomatin station and have a park and ride facility there?
Tomatin is quite a way out for a Park and Ride facility, assuming this is for getting into Inverness.
 

stevieinselby

Established Member
Joined
6 Jan 2013
Messages
1,692
Location
Selby
Tomatin is quite a way out for a Park and Ride facility, assuming this is for getting into Inverness.
It would limit use to people coming from A9(S), and be no use to anyone coming to Inverness from other directions – but more to the point, if you're only running an hourly service at best then you're not running a Park & Ride service, you're running a train service to a station with a car park. Park & Ride has to be a frequent service to be effective and attractive. People are not going to come off a fast road to catch a train that takes longer than driving even when it arrives but might have an hour's wait for it just to turn up.
 

numtot12345

Member
Joined
23 Feb 2021
Messages
122
Location
Glasgow
Article hidden behind a paywall so can't properly quote or see the details, however just going off the headline...

Obviously dualling and electrification would be a game-changer, however given rail priorities elsewhere, plus on-going investment in dualling the A9, I can't imagine these calls will gain much traction.


The Scottish government must “get spades in the ground” to dual and electrify the Highland Main Line, MSPs have demanded.

Politicians from across Scotland’s political spectrum have called for investment in the Perth to Inverness route. But SNP ministers said action would have to wait for a forthcoming report.
 
Last edited by a moderator:

The exile

Established Member
Joined
31 Mar 2010
Messages
9,367
Location
Somerset
Am I imagining it or was electrification first proposed by the Highland Railway some time before the First World War?
 