OMGitsDAVE
Member
Despite the IoW having the oldest stock, it has some of the best reliability...
The depot there only have five (plus one out of service) units to look after.
Leeds/Bradford airport is getting busier (Ryanair are making it their Northern base) and transport links are poor. Most of the overcrowding on the Harrogate line is south of Horsforth at peaks. So build an airport spur north of Horsforth (it's only a few miles, open country) with extra stations en route from Leeds, and electrify it, probably does not even need an extra substation. Harrogate trains are non-stop from Horsforth. I think this is all in the West Yorkshire metro wish list, and now that Leeds will not get trams, a good case for priority.
HSE put in stupid rules like huge disabled toilets on 2 car trains serving stations with no disabled access, unnecessary balises for tilting trains etc. - they would do better to ban Pacers and force their renewal. Wouldn't fancy a thirty five year old Leyland bus body in a crash.
The problem with this line and the electrification of it is that it does not release that many DMU's unless you take it round to York
There are lots of reasons why this proposal is unworkable. But it set me thinking (we female Electrical Engineers are such a rare breed we have to think a lot) ...
But third rail is cheaper for ancient tunnels and bridges where clearances are the big issues.
Well you understand I'm an electrical engineer and as the old saying goes "When the tool you have is a hammer, every problem looks like a nail".So the third rail section will need a transformer and supply for it. They are not cheap and would the money spent on that be better spent on lining the tunnel and draining it properly.
.
The Bramhope Tunnel is 2 miles 241 yards in length and has very specific problems with water ingress. A posting was made on the Infrastructure forum some while ago from someone who actually had to work in this particular tunnel and his rather forthright views on the working conditions inside the tunnel. I would not like to be a member of a 3rd rail working team in this environment...not I should imagine, would you be.
Water ingress is a network wide problem on LUL due to the high and rising water table in London. This is obviously not ideal but does not prevent the operation and maintenance of the system.
The Bramhope Tunnel is 2 miles 241 yards in length and has very specific problems with water ingress. A posting was made on the Infrastructure forum some while ago from someone who actually had to work in this particular tunnel and his rather forthright views on the working conditions inside the tunnel. I would not like to be a member of a 3rd rail working team in this environment...not I should imagine, would you be.
Those of us who've been watching Look North all our lives know to take pretty much everything they report with an enormous pinch of salt.
It was introduced 1981-83 and so will be just over 30 years old when released from the District Line but was totally rebuilt in 2004-7, so what the passengers get is less than 10 years old. Also all of the running gear/bogies was also replaced with a new design in 2000-2001 following continued problems from new. So, in many respects, these trains are, apart from external appearance, as new as, if not newer than the 333's!The D stock will be pushing 35 years old when they are withdrawn from LUL service.
Tell that to the passengers who get left behind when they can't get on the 142 or 150 and the next train is 30 mins or an hour later. There was a police incident at Headingley/Burley Park as a consequence of this a few weeks ago. The report said that the Harrogate line carried more passengers than the Ilkley Line and from my experience this is very likley to be correct.Cheers, even wth it's faults i'd still prefer a 142 than a Tube D Stock if i was using this line though.
It was introduced 1981-83 and so will be just over 30 years old when released from the District Line but was totally rebuilt in 2004-7, so what the passengers get is less than 10 years old. Also all of the running gear/bogies was also replaced with a new design in 2000-2001 following continued problems from new. So, in many respects, these trains are, apart from external appearance, as new as, if not newer than the 333's!
--- old post above --- --- new post below ---
Tell that to the passengers who get left behind when they can't get on the 142 or 150 and the next train is 30 mins or an hour later. There was a police incident at Headingley/Burley Park as a consequence of this a few weeks ago. The report said that the Harrogate line carried more passengers than the Ilkley Line and from my experience this is very likley to be correct.
--- old post above --- --- new post below ---
D78's are far more comfortable than anything currently in use on the Harrogate line apart from the daily HST and the occasional 158. You can also see out of the huge windows they have unlike the 150's where all you can do is peer over the sill. Even than the window is likely to be so dirty you can't see much. The press release said approx 40% more seats. If you use the line as a means of travel you won't argue with that.
--- old post above --- --- new post below ---
The D78's have SDO operable simultaneously from the front and rear, so a train could still call at Knaresborough with passengers able to board and alight from front and rear veh's. A short platform extension could also be possible if the level crossing were closed.
The press release states a modern DLR style under-running contact system is proposed because of the high cost of 25kV. This seems to make perfect sense if you know the route - it has lots of low overbridges already prohibited to certain traction types, Bramhope tunnel and four major long viaducts, all of which are grade II listed. I guess the cost of reconstructing this lot and then making the catenary invisible on the viaducts would be immense when compared with around 10 or so sub-stations needed for a DC system of this length. This modern system also is more weather risistant than either top contact third rail or 25kV overhead. Not susceptible to icing or wind!
--- old post above --- --- new post below ---
The press release suggested that the inter-car gangways were being reconstructed to make them safe for passengers and staff to use. The main purpose of the idea was to unlock the current diesel rolling stock constraint, unlock the potential for more stations without increasing the journey time (no chance with diesels) and provide significantly more capacity on each train. There was no mention of removing guards.
The press release states a modern DLR style under-running contact system is proposed because of the high cost of 25kV. This seems to make perfect sense if you know the route - it has lots of low overbridges already prohibited to certain traction types, Bramhope tunnel and four major long viaducts, all of which are grade II listed. I guess the cost of reconstructing this lot and then making the catenary invisible on the viaducts would be immense when compared with around 10 or so sub-stations needed for a DC system of this length. This modern system also is more weather risistant than either top contact third rail or 25kV overhead. Not susceptible to icing or wind!
Well, I think no-one would object to 25kV if it were affordable and 25kV trains were available quickly, but neither is the case and the Harrogate Line does not feature on anyone's list of priorities for electrification, which is necessary if long-term affordable improvements are to be achieved.Side contact does not mean that the route will be able to be upgraded cheaply. This stock is already wide and will have to have space provided for the side/bottom contact rail on an existing railway infrastructure. Existing stock has to be able to operate on it without clouting it. It will be susceptible to icing, snow and flood water and will be even worse than that for deicing as any chemicals sprayed at it will not sit on it. OHLE can be made very light and effective on rail bridges and if they can get it over other listed structures like York, Royal Border and Durham Viaduct, this route is going to be a walk in the park for them.
If the gangways are being reconstructed, I hope that they are upping the upgrade costs because £500,000 is unlikely to cut the mustard for this kind of work. There are lots of suggestions as part of this project and unfortunately shoulds and would expects are just not solid enough for an argument.
But its not as harsh as the winter in Copenhagen, who's newish metro works very well with this electrification system.I did realise the LUL problems, all I was saying that the Bramhope Tunnel was not the ideal working conditions for staff to work in, which was stated by someone in a team that had to spend time within its confines. The area in which the Bramhope Tunnel is situated is rather more weather-beaten than in the LUL areas, especially in a hard Yorkshire winter.
The press info stated £6m for mandatory mods and more for a shopping list of mods including a toilet in each unit. The £500k was scrap price procurement.Side contact does not mean that the route will be able to be upgraded cheaply. This stock is already wide and will have to have space provided for the side/bottom contact rail on an existing railway infrastructure. Existing stock has to be able to operate on it without clouting it. It will be susceptible to icing, snow and flood water and will be even worse than that for deicing as any chemicals sprayed at it will not sit on it. OHLE can be made very light and effective on rail bridges and if they can get it over other listed structures like York, Royal Border and Durham Viaduct, this route is going to be a walk in the park for them.
If the gangways are being reconstructed, I hope that they are upping the upgrade costs because £500,000 is unlikely to cut the mustard for this kind of work. There are lots of suggestions as part of this project and unfortunately shoulds and would expects are just not solid enough for an argument.
Well, I think no-one would object to 25kV if it were affordable and 25kV trains were available quickly, but neither is the case and the Harrogate Line does not feature on anyone's list of priorities for electrification, which is necessary if long-term affordable improvements are to be achieved.
Therefore if 750V DC is more affordable (it should be) and the trains available, it's a very positive step in the right direction for passengers that can be achieved quickly. The trains are way more comfortable than 150's and meet the key objective of providing significantly more seats.
This electrification system works in Copenhagen which has very harsh icy and snowy winters, icing is not a problem there and any dual voltage unit could use it with the right shoegear.
It's also a far better option than trams which appear to be the only other option on the table.
--- old post above --- --- new post below ---
But its not as harsh as the winter in Copenhagen, who's newish metro works very well with this electrification system.
The press info stated £6m for mandatory mods and more for a shopping list of mods including a toilet in each unit. The £500k was scrap price procurement.
You have no basis that 750 volts electrification is going to be cheaper over all. That depot is not going to be cheap is it?
And that ignores all the immunization of signalling that's going to be needed (even though poor old moggie keeps going on about it) not only along the line itself but at both York and Leeds and neither are exactly simple signalling installations. I just don't think that the costs of electrification at 750V DC using 3rd rail is going to be any cheaper than 25kV OHLE.
Unless they drop it to Line of Site signalling but that will cut train speeds to 50 mph at the fastest and maybe even slower.
Well, I think no-one would object to 25kV if it were affordable and 25kV trains were available quickly, but neither is the case