Helvellyn
Established Member
- Joined
- 28 Aug 2009
- Messages
- 2,587
As I posted earlier though, the link into Wellingborough Midland wasn't the main route. The Northampton-Peterborough line had its main Wellingborough station at Wellingborough London Road, used by through passenger trains to/from Peterborough. Yes, you could have closed the route from there to Peterborough, closed London Road and run trains into Midland station but as previously said the connection came up on the Fasts. I believe there was a bay platform between what is today platforms 2 and 3, but to avoid conflicting movements you'd likely have needed a new bay platform adjacent to the Goods Shed. Connections in the 1960s would have been limited because Wellingborough's service was sporadic - even in the early 1990s InterCity were providing an off-peak 90 minute interval service.It wasn't?
I'm sure others would have other nominations, but I'd say the closure of Wellingboro - Northampton was the worst single closure of the 1960s. It was a short route (12 miles?), so what were the savings? And it offered such potential for connectivity. Much better than Bletchley - Bedford, especially considering that did not run into Bedford Midland at the time, and was also likely expected to close.
BR & the Ministry of Transport must have known, even in 1964, that the GC would be closing north of Aylesbury, and could have insisted keeping Aylesbury to Calvert, running a DMU Aylesbury - Bletchley - Northampton - Wellingboro' - Kettering - Corby - Oakham - Melton - Nottingham. (Single sections north of Corby as appropriate.)
And, of course, Milton Keynes was also in the planning stage, though I'm not sure it was announced by the time the GC closed. Nonetheless, it would clearly need new connections.
Nobody would expect to use Aylesbury - Nottingham throughought (faster to Nottingham by changing at Wellingboro), but this would have maintained a service northwards from Aylesbury (actually, better than anything previously offered, at least in terms of connections), a service to Corby and north thereof.
You mean between Northampton and Wellingboro? You could have kept Castle Ashby open. Don't think Northampton Bridge Street would make the grade.
90 mpn or even 75 mph line speed would have been fine.
Agree that longer term Wellingboro' - Peterboro' would have been good, but I suspect the financials at the time would have been very poor. And, of course, it ran into Peterboro' East, not North.
Was Oundle station well located for the settlement? If so, might have provided some local traffic, I suppose. There was the school, of course.
United Counties Omnibus effectively replaced the Northampton-Peterborough line with a through bus service that still exists today as the Stagecoach X4, although for operational reasons the route is split at Corby forcing a change. Yes, Corby isn't on the closed line but the bus service follows the A4500 (old A45 running through the intermediate settlements) from Northampton-Wellingborough, heads North to Kettering/Corby, then across to Peterborough via Oundle, linking the bigger settlements rather than just following the bottom of the Nene Valley as the railway did (which also missed Kettering/Corby).
It's still possible to buy through rail tickets (although not on many websites) to Oundle (by Bus), Corby (by Bus) and Kettering (by Bus) that are routed via Peterborough then onto the X4 service. The better Midland Mainline service and restoration of Corby's rail links are probably why the alternate destinations are not readily sold (the Ketering and Corby 'by bus' destinations are not the rail stations but rather the bus station).
== Doublepost prevention - post automatically merged: ==
Politics may have played a part but the tourist traffic was probably sufficiently strong to play a part as well. Lincolnshire has been safe Tory and its rail services were decimated but Skegness remained open. Poor road links again but also a Butlin's.Are you sure it wasn't the fact that the former Merioneth constituency was marginal, and Labour held it? On the flip side, Minehead, part of the Taunton constituency, was safe Tory?
) and this was seen as a way of increasing utilisation. Remember also, that about this time Cricklewood. - Brent just about closed, with freight trains from the Midland also being diverted similarly, to Sudbury and Willesden - Brent - again soaking up AC loco use. Just left Wellingborough to Acton (staged from Toton), to serve W.R. destinations, and the St Pancras - Glasgow sleeper was also diverted that way to allow St Pancras sleeper depot to be closed. But I can't remember what was planned at the South end; I don't think that that plan also involved closing St Pancras but, at the time, many peak trains between Bedford and London ran to Moorgate. It was of course a different world as far as commuting went, with dormitory towns being much closer to London than now.