Yes, tramway projects sometimes go wrong and end up over budget, but these projects generate benefits that can make it worth the risk....and tramway cost estimates are rock solid? Remember Edinburgh?
Because being upset costs them nothing, and can be used to burnish their credentials of "standing up to Westminster", with an eye to their eventual reelection.... so why are S Yorks and E Mids Mayors (issued with £3.5bn worth of new trams between them) so upset at the Pause
== Doublepost prevention - post automatically merged: ==
Well, we can have a discussion about why the project phasing decided to stop a few miles short of Leicester on this last tranche. But that decision was made an awful long time ago.Considering Kettering to Wigston has come out at £3.1m/stk, £2.7m/stk onward to Derby/Nottingham is achievable if the rolling programme had continued. Just think how much money has been wasted in ordering steelwork already for the next phase. That money alone would have paid for 10 miles of electrification that we will not now get as it will probably be sold off for scrap at a fraction of its true cost. Wigston to Leicester at least.
Freight operations currently burn about 153 million litres of fuel oil per year, about 28% of total rail use.Due to inflation alone we will never see £2.7m/stk again so again cancellation of MML electrification is a missed opportunity and much more expensive in the long run as mainline electrification will be needed as discontinuous electrification is not a solution for freight locos.
That's about 125 kilotonnes of fuel oil for freight. A substantial portion of this is burned on electrified lines.
in the short/medium term, the best way to cut these emissions would likely be to buy a fleet of electrodiesels. Class 99s type jobs would take a big chunk out of it, especially if you can get a dual voltage capability.
A limited battery hybrid capability would be a big saving on top of that.
It's worth noting that heritage railways currently burn about 35000t of coal a year, which is a similar amount of carbon to about that tonnage of fuel oil. It wouldn't take a huge saving to make it a similar impact on the environment, which would buy the railway time for battery technology to improve.