I suppose the flipside if it was cancelled would be that, if reinstated, it wouldn't have to go right to the back of the queue.
We’ll get to the top of the queue and then something else will come and take priority - and once again MMLE has been “paused” because of funding constraints. And once again the arguments between pro and anti MMLE factions on RF reappearSeeing all this work progress with the TRU electrification makes me wonder how long it’ll be until it’s ’our’ turn…
We’ve been shafted so many times and batteries are not a long term solution. Particularly for a mainline.
It won't become your turn unless people and (local) politicians make a fuss about the pause.Seeing all this work progress with the TRU electrification makes me wonder how long it’ll be until it’s ’our’ turn…
It is kind of sad how many times MMLe has been cancelled nowWe’ve been shafted so many times and batteries are not a long term solution. Particularly for a mainline.
The original "infinite benefit cost ratio" figures for the Midland Main Line scheme were based on extremely optimistic cost estimates, tied up with the HOPS train, though. This was the same time that Network Rail was claiming that 25kV installation would be cheaper than third rail renewal, after all.What is also scandalous is that analyses of the benefit of MML electrification ranked it highly, ahead of the GWML for example. The excuse given for preferring the GWML was that the HST's needed replacing. They had just been re-engined by MTU of course and were performing well. I am not impressed by the regulatory objections to them; a waiver should have been strongly sought in view of the excessive cost and distortion of strategic investment. Even after withdrawal, many are still at work both in Nigeria and Mexico as well as a number in private commercial and heritage ownership.
I imagine that the MMLe case (batteries notwithstanding) is stronger than ever, as it is now over half complete. Its further pausing just shows up the irrational, politically flawed decision making in the public sector.
WAO
One advantage of GWML was that it displaced the GW commuter DMU fleet, whereas MML wouldn't displace a single DMU on existing timetables and only a handful if they were revised to create self-contained EMU routes. If that hadn't happened then more DMUs would have had to be ordered about 10 years ago when battery or bi-mode wasn't being considered for suburban/regional units. These would then have remained in service into the 2040s unless prematurely replaced. This was the only element that actually happened of the rolling stock cascades planned to accompany electrification.What is also scandalous is that analyses of the benefit of MML electrification ranked it highly, ahead of the GWML for example. The excuse given for preferring the GWML was that the HST's needed replacing. They had just been re-engined by MTU of course and were performing well. I am not impressed by the regulatory objections to them; a waiver should have been strongly sought in view of the excessive cost and distortion of strategic investment. Even after withdrawal, many are still at work both in Nigeria and Mexico as well as a number in private commercial and heritage ownership.
I imagine that the MMLe case (batteries notwithstanding) is stronger than ever, as it is now over half complete. Its further pausing just shows up the irrational, politically flawed decision making in the public sector.
WAO
That "infinite BCR" derived from comparing (1) electrifying the whole route and running EMUs from London to Sheffield and (2) not electrifying beyond the existing limit at Bedford and running diesel trains along the whole route. I know this because they published the actual spreadsheet that was used to make the calculation, though unfortunately I didn't keep a copy.The original "infinite benefit cost ratio" figures for the Midland Main Line scheme were based on extremely optimistic cost estimates, tied up with the HOPS train, though. This was the same time that Network Rail was claiming that 25kV installation would be cheaper than third rail renewal, after all.
I am doubtful the benefit cost ratio of the scheme as it exists now is anything like that, especially as the Network effect has been more or less killed off by the proliferation of electrodiesels.
"Almost all of them (the engineering design challenges of putting wires up to Leicester) have been designed out. The design to Leicester is 80% finished and almost all the signal interventions between Wigston and Leicester have already been finished, or will be finished this year. So, to get to Leicester is literally just putting up masts and wires and that's the last bit of that section of the project to do. Most of the engineering challenges have been overcome. It's (the) funding which is the challenge."
It's a crazy decision. I understand the government's need to make hard decisions and overall the transport spend is pretty good and certainly better than in the past. Its an almost certainty that at least some of the MML will need electrifying in the future, this decisions has made that more difficult and expensive.I have just been watching Green Signals latest edition including Furrer and Frey AG project man Noel Dolphin. According to him 80% of the work needed between Wigston and Leicester would have been completed by this Christmas leaving just erection of masts and wires to complete. Cost of electrification, of which wires and masts are only 30% of the overall cost, have been reduced to £3.1m/stk on MML due to a rolling programme. This has now been broken meaning increased costs in future because the team has now been broken up losing valuable experience and 2,500 jobs. It will take many months to assemble another team if there are available workers. They were on target to reduce costs on this next section to £2.7m/stk but this will now not happen. For the sake of £25m more to complete to Leicester, £30-40m has been wasted on design and infrastructure if no more MML is done soon.
Whats more, 83% of bridge lifts on the Leicester-Derby/Nottingham route are already complete and 93% of the signal moves to avoid the OHL gantry positions are complete. More wasted money to cancel now. The contract for the feeder station at Trent has already been signed so that money is already spent. Idiosy to cancel now.
Except that it didn't. We already had Heathrow Express and a few EMU's, plus we then had Crossrail which solved most of the Paddington suburban DMU issue. We still needed DMU's on the Oxford stoppers, Pewsey's, Basingstokes, TV branches and the Guildfords, which were not then available further West where the Turbos would have shone.One advantage of GWML was that it displaced the GW commuter DMU fleet,
Except that it didn't even get to Bristol or Swansea. The Bi-modes are very expensive and often mismatched.Another factor is that GWML was never going to encompass the entire GW Intercity network, so at least a proportion of the fleet would have had to be bi-modes, a
What the spreadsheet didn't do was take account of bimodes. Bimodes could exploit the existing electrification to Bedford and would only incur the extra running fuel and maintenance costs of diesel north of Bedford. So the PV of the bimode approach was higher than the PV or the pure EMU or the pure Diesel options. One bimodes were included in the as an option, the BCR of electrifying the rest of the MML got very much worse.
Many thanks for this, (and to all other posters for informed debate), though it makes one want to weep.Whats more, 83% of bridge lifts on the Leicester-Derby/Nottingham route are already complete and 93% of the signal moves to avoid the OHL gantry positions are complete. More wasted money to cancel now. The contract for the feeder station at Trent has already been signed so that money is already spent. Idiocy to cancel now.
What happened to the infrastructure for Didcot-Oxford? From what I remember, most of it was dismantled, suggesting more of a cancellation than a pause. I suspect that whatever is ordered for Kegworth will likely be disposed of, which will be a massive waste.
At least it wasn't dismantled. One of the few electrification schemes which stands on it's own two feet.Many piles done, a few masts up and, amongst the Buddleia at Radley, you'll find a complete ATS! It all MIGHT be completed when the Botley Road bridge work is finished.
For now, the government has "resolved" this issue by simply cancelling the Eastern leg - no need for MML electrification for HS2 if the HS2 trains don't get anywhere near Sheffield!At least it wasn't dismantled. One of the few electrification schemes which stands on it's own two feet.
Is there any chance HS2 trains can lug batteries around so they can run to Sheffield and Chester?
If not that could be a catalyst for electrification but I'm sure there's a way of somehow finding space for a battery pack to ensure it doesn't happen.
£3.1M/stk is still way too high.Cost of electrification, of which wires and masts are only 30% of the overall cost, have been reduced to £3.1m/stk on MML due to a rolling programme.
I should hope so. Syston to Trent is a very simple four-track railway where much of the line is on viaduct with few overbridges. They should be able to do that section for much cheaper than 13% below recently achieved costs.They were on target to reduce costs on this next section to £2.7m/stk but this will now not happen.
£3.1m/single track kilometre is still extremely expensive.I have just been watching Green Signals latest edition including Furrer and Frey AG project man Noel Dolphin. According to him 80% of the work needed between Wigston and Leicester would have been completed by this Christmas leaving just erection of masts and wires to complete. Cost of electrification, of which wires and masts are only 30% of the overall cost, have been reduced to £3.1m/stk on MML due to a rolling programme.
Has there ever been any planning on stopping at Leicester?This has now been broken meaning increased costs in future because the team has now been broken up losing valuable experience and 2,500 jobs. It will take many months to assemble another team if there are available workers. They were on target to reduce costs on this next section to £2.7m/stk but this will now not happen. For the sake of £25m more to complete to Leicester, £30-40m has been wasted on design and infrastructure if no more MML is done soon.
Whats more, 83% of bridge lifts on the Leicester-Derby/Nottingham route are already complete and 93% of the signal moves to avoid the OHL gantry positions are complete. More wasted money to cancel now. The contract for the feeder station at Trent has already been signed so that money is already spent. Idiosy to cancel now.
£2.7m/stk is the next section figure. Much cheaper than over £4m/stk previously on other schemes and considering how much has been spent already on planning, bridge lifts, signal spacing, feeder station, steelwork already ordered for the next section, vegetation clearance and pegging out, cancelling at short notice when so much has been done and spent now for nothing then it is an incompetent decision and waste of valuable resources.£3.1m/single track kilometre is still extremely expensive.
You probably need half of that to justify additional large scale electrification. Almost all the very high traffic density lines are already done.
And obviously that figure is being reported by someone with a vested interest in electrification continuing, so must be treated with appropriate quantities of salt.
Has there ever been any planning on stopping at Leicester?
You can bet modifications to the design to enable that would cost a pretty penny from the contractors, so I don't think its reasonable to assume that you can just do that without bearing substantial additional costs.
And the money spent is already gone, it shouldn't have any impact on whether the project should continue or not.
But is it?£3.1m/single track kilometre is still extremely expensive.
You probably need half of that to justify additional large scale electrification. Almost all the very high traffic density lines are already done.
There is absolutely a case to reduce costs further though, and Noel acknowledges that and talks about his views on how this could be done. What I found kind of shocking is that all the infrastructure work is only ~45% of the costs - the other ~55% being both train disruption payments and project management costs.But is it?
I've just read East West Rail as costing £6.6Bn for 36 miles, (i.e its electrification would have been c6% of the cost!), and £18M for a single 4 car platform station, not to mention tramway costs etc etc. Also, what is the marginal cost of completing the scheme, at least to the EM, as so much as now been irrevocably spent north of Wigston?
It depends what you see as value for money even in the suspiciously sky high prices of any current railway scheme.
WAO
EWR is probably one instance where the cost per stk would be lower (as much could have been done on the back of the rest of the work with no operations railway to worry about) - so less than 6%But is it?
I've just read East West Rail as costing £6.6Bn for 36 miles, (i.e its electrification would have been c6% of the cost!),
£2.7m/stk is the claimed next section figure.£2.7m/stk is the next section figure. Much cheaper than over £4m/stk previously on other schemes and considering how much has been spent already on planning, bridge lifts, signal spacing, feeder station, steelwork already ordered for the next section, vegetation clearance and pegging out, cancelling at short notice when so much has been done and spent now for nothing then it is an incompetent decision and waste of valuable resources.
The cold blooded answer is probably that none of these projects were particularly good value of money.But is it?
I've just read East West Rail as costing £6.6Bn for 36 miles, (i.e its electrification would have been c6% of the cost!), and £18M for a single 4 car platform station, not to mention tramway costs etc etc. Also, what is the marginal cost of completing the scheme, at least to the EM, as so much as now been irrevocably spent north of Wigston?
It depends what you see as value for money even in the suspiciously sky high prices of any current railway scheme.
Considering Kettering to Wigston has come out at £3.1m/stk, £2.7m/stk onward to Derby/Nottingham is achievable if the rolling programme had continued. Just think how much money has been wasted in ordering steelwork already for the next phase. That money alone would have paid for 10 miles of electrification that we will not now get as it will probably be sold off for scrap at a fraction of its true cost. Wigston to Leicester at least.£2.7m/stk is the claimed next section figure.
Until the project is completed it is just an estimate. I would not blame the politicians for becoming increasingly skeptical of such claims by the railway after the debacles of recent years.
== Doublepost prevention - post automatically merged: ==
True. Staggering that disruption and project management costs are more than infrastructure costs. This wouldn't have happened in BR days. Another downside of rail privatisation that we weren't told about.There is absolutely a case to reduce costs further though, and Noel acknowledges that and talks about his views on how this could be done. What I found kind of shocking is that all the infrastructure work is only ~45% of the costs - the other ~55% being both train disruption payments and project management costs.
That would have paid for completion of electrification to Leicester with change left over.With the anger from Sheffield over the past week, is it a coincidence that there's an announcement today that Sheffield will receive £20 million in government bus funding
...and tramway cost estimates are rock solid? Remember Edinburgh?Until the project is completed it is just an estimate. I would not blame the politicians for becoming increasingly skeptical of such claims by the railway after the debacles of recent years.
... so why are S Yorks and E Mids Mayors (issued with £3.5bn worth of new trams between them) so upset at the Pause?The cold blooded answer is probably that none of these projects were particularly good value of money.
Tramways, at least, provide quite a lot of value to large numbers of passengers.
Wouldn't it allow the extension of EMR Connect services as well?The largest value provided by an extension to East Midlands Parkway is currently a marginal reduction in diesel use. I don't think this is a particularly large benefit.
It probably has limited value for supporting battery operations because electrification at Sheffield will likely be needed in any case for other trains.
Which trains would be ‘extended’? All Connects run to/from Corby (other than positioning moves related to stabling at Kettering).Wouldn't it allow the extension of EMR Connect services as well?
I have just been watching Green Signals latest edition including Furrer and Frey AG project man Noel Dolphin. According to him 80% of the work needed between Wigston and Leicester would have been completed by this Christmas leaving just erection of masts and wires to complete. Cost of electrification, of which wires and masts are only 30% of the overall cost, have been reduced to £3.1m/stk on MML due to a rolling programme. This has now been broken meaning increased costs in future because the team has now been broken up losing valuable experience and 2,500 jobs. It will take many months to assemble another team if there are available workers. They were on target to reduce costs on this next section to £2.7m/stk but this will now not happen. For the sake of £25m more to complete to Leicester, £30-40m has been wasted on design and infrastructure if no more MML is done soon.
Whats more, 83% of bridge lifts on the Leicester-Derby/Nottingham route are already complete and 93% of the signal moves to avoid the OHL gantry positions are complete. More wasted money to cancel now. The contract for the feeder station at Trent has already been signed so that money is already spent. Idiosy to cancel now.
£3.1m/single track kilometre is still extremely expensive.
You probably need half of that to justify additional large scale electrification. Almost all the very high traffic density lines are already done.
And obviously that figure is being reported by someone with a vested interest in electrification continuing, so must be treated with appropriate quantities of salt.
Has there ever been any planning on stopping at Leicester?
You can bet modifications to the design to enable that would cost a pretty penny from the contractors, so I don't think its reasonable to assume that you can just do that without bearing substantial additional costs.
And the money spent is already gone, it shouldn't have any impact on whether the project should continue or not.