Now that EWR to Cambridge is a completly new route, should this route be considered? Involves new lines from Hitchin to Luton and Luton to Leighton Buzzard (mostly using the old alignment).

There seems to be a number of advantages over the current route:
It requires 22 miles of new line compared to 31, or 46 if you include the Bletchely to Bedford section.
It provides a link to Luton Airport which has poor rail connections north of London (plus poor road connections from the east)
It serves circa double the population between Bletchley and Cambridge
There are already good East-West road corridors near the current route (A14 and A421/8) but between there and London there is an absence of east-west connections (e.g a lot of traffic goes down to the M25, across and up again).
The Stevenage to Luton new-build part could be a joint road/rail corridor
Disadvantages are that the short Dunstable busway will be replaced with rail, it's 3 miles longer overall and it uses more existing lines... plus no doubt some others which will be added shortly!

There seems to be a number of advantages over the current route:
It requires 22 miles of new line compared to 31, or 46 if you include the Bletchely to Bedford section.
It provides a link to Luton Airport which has poor rail connections north of London (plus poor road connections from the east)
It serves circa double the population between Bletchley and Cambridge
There are already good East-West road corridors near the current route (A14 and A421/8) but between there and London there is an absence of east-west connections (e.g a lot of traffic goes down to the M25, across and up again).
The Stevenage to Luton new-build part could be a joint road/rail corridor
Disadvantages are that the short Dunstable busway will be replaced with rail, it's 3 miles longer overall and it uses more existing lines... plus no doubt some others which will be added shortly!