• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Can GBR bring XC back up to INTERCITY standard?

Status
Not open for further replies.

mjc

Member
Joined
26 Jun 2018
Messages
195
What non-stop services? What freight goes through fast enough that it could overtake a passenger train?
I’m pretty sure a snail could overtake the EMR Crewe-Derby line, but that’s not necessarily the point, it can be the other way around that the middle road could be used to hold the freight while, say, the Avanti comes into the platform then overtakes on departure.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
There are loops just to they north of the station that can serve exactly that purpose, if necessary.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,756
Location
Nottingham
Modern freight trains are generally longer than passenger so it's usually impossible to hold them on the "through line" of a station with simple platform loops. The loops would need to be much longer, and even if there is space to do that, higher-speed turnouts would be needed to avoid slowing the passenger train, or they would have to be realigned with the "straight" track towards the platform.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,739
I’m pretty sure a snail could overtake the EMR Crewe-Derby line, but that’s not necessarily the point, it can be the other way around that the middle road could be used to hold the freight while, say, the Avanti comes into the platform then overtakes on departure.
Its way too short to do that and as others have said, you aren't lacking in freight loops.

== Doublepost prevention - post automatically merged: ==

I’d be interested to hear what additional services were added as a result of the improved capacity. I recall when the works were being done it was also heralded as enabling faster journies, but do t remember any actually getting faster…
It was capacity, you wouldn't be getting a second Liverpool or Stirling service without it.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,365
What non-stop services? What freight goes through fast enough that it could overtake a passenger train?
Actually, where there is a stopping passenger service sharing the line with freights (as will be the case from Kings Norton to Camp Hill) I suspect that modern freights could outpace the local...
The middle road at Rhyl (and those at Bangor) are basically useless on 364 days of the year. All trains stop there so the only time that they are ever used for regulation purposes is if a late-running train is run fast. You'd be better off stripping them out and providing higher speed approaches to the platforms. Passenger loops are needed in places where not everything stops.
I wasn't saying it gets used, just that it is an example of one surviving. I did see the Chirk logs go non-stop through Chester a few weeks ago... but RTT shows it through platform 4 to allow a crew change!
 

Class15

Established Member
Joined
30 Dec 2021
Messages
4,187
Location
North London or Mildmay line
Actually, where there is a stopping passenger service sharing the line with freights (as will be the case from Kings Norton to Camp Hill) I suspect that modern freights could outpace the local...
This already happens every day on the North London line, and your prediction is certainly correct!
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
From a comparison of two trains, freight is faster than the local passenger train between Southcote Jn and Basingstoke, too. Only by 3 minutes (20 Vs 23), but I would have said that that route isn't one with especially closely packed stations.
 

mjc

Member
Joined
26 Jun 2018
Messages
195
It was capacity, you wouldn't be getting a second Liverpool or Stirling service without it.
I don’t know the detail of the Liverpool service, but the Sterling will only call at Nuneaton in the West Midland then off via Crewe to Preston so given the comment was about the works improving capacity between Birmingham and Manchester I’m struggling to see how that’s achieved.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,365
I don’t know the detail of the Liverpool service, but the Sterling will only call at Nuneaton in the West Midland then off via Crewe to Preston so given the comment was about the works improving capacity between Birmingham and Manchester I’m struggling to see how that’s achieved.
because if a northbound Manchester-via-Stoke train crossed (turned right) on the level it would take out at least 1 express path on the up fast, maybe 2. And I can see that taking out the diamond crossing over the UF is a bonus..
 

mjc

Member
Joined
26 Jun 2018
Messages
195
because if a northbound Manchester-via-Stoke train crossed (turned right) on the level it would take out at least 1 express path on the up fast, maybe 2. And I can see that taking out the diamond crossing over the UF is a bonus..
Thanks, that’s interesting, so the real benefit was allowing through trains from London to Northwest without reducing the Manchester-Birmingham capacity rather than truly improving capacity between those points?

I’ve found this from Network Rail: https://www.networkrailmediacentre....0m-railway-upgrade-between-stafford-and-crewe


Once complete, the £250m programme will facilitate the introduction of new timetables between 2015 and 2017 and create the capability to deliver:

  • Two extra trains per hour (off peak, each direction) between London and the north west of England
  • One extra train per hour (each direction) between Manchester and Birmingham
  • One extra freight train per hour (each direction) through Stafford
Nine years later I think we’re still waiting for that one extra train per hour between Manchester and Birmingham…
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,739
Nine years later I think we’re still waiting for that one extra train per hour between Manchester and Birmingham…
It creates the capability, it didn't say it was going to deliver a service. Very different things.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,378
Location
belfast
Thanks, that’s interesting, so the real benefit was allowing through trains from London to Northwest without reducing the Manchester-Birmingham capacity rather than truly improving capacity between those points?
But it did deliver new services - just not the one you were hoping for
Nine years later I think we’re still waiting for that one extra train per hour between Manchester and Birmingham…
It would be nice if it gets added, and I think it should, but XC has been a disaster over the last ten years and certainly isn't and wasn't in a position to offer extra services, if they were the ones planned to deliver it.

It creates the capability, it didn't say it was going to deliver a service. Very different things.
It did deliver new services, just not from Birmingham to Manchester, but instead between other destinations that share part of the route.
 

mjc

Member
Joined
26 Jun 2018
Messages
195
But it did deliver new services - just not the one you were hoping for

It would be nice if it gets added, and I think it should, but XC has been a disaster over the last ten years and certainly isn't and wasn't in a position to offer extra services, if they were the ones planned to deliver it.


It did deliver new services, just not from Birmingham to Manchester, but instead between other destinations that share part of the route.
Ok, so which new services have been delivered?
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
Wasn't it said upthread that the second Liverpool and the Lumo Stirling are possible because of the flyover?
It'll improve the slow trains too as they won't be waiting to cross the fast lines to get towards Stone.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,378
Location
belfast
Ok, so which new services have been delivered?
Extra london-liverpool services have started, and more will follow in September and December.
The London-Stirling services that Lumo will start operating in the near future.
 

mjc

Member
Joined
26 Jun 2018
Messages
195
Extra london-liverpool services have started, and more will follow in September and December.
The London-Stirling services that Lumo will start operating in the near future.
So one new service in 9 years, and in the context of a discussion about capacity between Birmingham and Manchester absolutely nothing. Well worth the £250m and disruption ;)
 

Krokodil

Established Member
Joined
23 Jan 2023
Messages
6,614
Location
Wales
Nine years later I think we’re still waiting for that one extra train per hour between Manchester and Birmingham…
Would be better off running full-length services first, rather than messing around with 4/5 car Voyagers.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,917
Location
Cambridge, UK
Well worth the £250m and disruption ;)
Yes, I think it was, to the railway as a whole - and I suspect without it, maybe Birmingham - Manchester services via Stoke might have had to be reduced to make space for (probably more remunerative) services towards Crewe and beyond.
 

mjc

Member
Joined
26 Jun 2018
Messages
195
Yes, I think it was, to the railway as a whole - and I suspect without it, maybe Birmingham - Manchester services via Stoke might have had to be reduced to make space for (probably more remunerative) services towards Crewe and beyond.
Maybe, but as I’ve already said this work was cited as improving capacity between Birmingham and Manchester, in that context all its achieved so far is possibly saved a service from being axed to make way for one London-Liverpool service.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,739
So one new service in 9 years, and in the context of a discussion about capacity between Birmingham and Manchester absolutely nothing. Well worth the £250m and disruption ;)
Yes it was. The value of West Coast paths is greater. Considering most of it was offline, the relative disruption was trivial.
 

Zomboid

Established Member
Joined
2 Apr 2025
Messages
2,310
Location
Oxford
It's also helped with reliability and flexibility on both the fasts and slows by eliminating flat crossings.
On its own grade separation of one junction isn't going to change the world on a busy route like the WCML. Getting 1 extra tph all day every day isn't bad going for what is actually a relatively minor intervention.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,710
Location
Hope Valley
I don’t think that there has been a significant reference to freight so far. There is always significant churn over the years so it’s hard to make a direct ‘now’ and ‘then’ comparison but the Norton Bridge works undoubtedly increased the fluidity and capacity of the Slow Lines. The scheme also included a long loop facility at Stafford that provides a valuable capability for overtaking/ re-sequencing. The intermodal market on the WCML has been generally buoyant.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,917
Location
Cambridge, UK
I don’t think that there has been a significant reference to freight so far. There is always significant churn over the years so it’s hard to make a direct ‘now’ and ‘then’ comparison but the Norton Bridge works undoubtedly increased the fluidity and capacity of the Slow Lines. The scheme also included a long loop facility at Stafford that provides a valuable capability for overtaking/ re-sequencing. The intermodal market on the WCML has been generally buoyant.
I agree, and on the ECML the Werrington Junction grade-separation scheme and re-signalling/upgrading of the ex-GN GE Joint Line on to Doncaster did the same for freight on the ECML (hence releasing capacity for passenger services).
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,365
Regardless of whether additional trains are added or not, eliminating a flat junction has massive benefits for timetabling and day-to-day running.
i.e. resilence. A late train in 1 direction can't delay one in the other direction getting through the junction.
 

jayiscupid

Member
Joined
19 Aug 2015
Messages
140
Location
Singapore
Honestly if I live in Reading and need to go to Manchester. I'd rather use extra time taking a direct train over going through the mess that is London terminals.

I live near Reading and have always gone via London to Manchester to avoid the mess (and expense) of XC.

For years, I could normally get advance first-class tickets for less than a standard class ticket on CrossCountry, so for me, it's been worth the hassle with the tube from Paddington to Euston.
 

Mgameing123

Member
Joined
29 Apr 2023
Messages
1,060
Location
Denmark
I live near Reading and have always gone via London to Manchester to avoid the mess (and expense) of XC.

For years, I could normally get advance first-class tickets for less than a standard class ticket on CrossCountry, so for me, it's been worth the hassle with the tube from Paddington to Euston.
Understandable. The way things are ran now I would do the same thing. But that’s mainly because the government doesn’t want to invest into the very busy CrossCountry route.

== Doublepost prevention - post automatically merged: ==

I live near Reading and have always gone via London to Manchester to avoid the mess (and expense) of XC.

For years, I could normally get advance first-class tickets for less than a standard class ticket on CrossCountry, so for me, it's been worth the hassle with the tube from Paddington to Euston.
Understandable. The way things are ran now I would do the same thing. But that’s mainly because the government doesn’t want to invest into the very busy CrossCountry route.
 
Status
Not open for further replies.

Top